Loading...
HomeMy WebLinkAbout11-1978 JS Z1W INC. UANAGEMENT CONSULTANTS ' Dallas Houston Austin CITY OF DENTON i FACILITIES ANALYSIS i November, 1978 12760 Park Central, Suit 9 1805 Dallas, Texas 70261 (214) 233•5581 I ' TABLE OF CONTENTS 1 PAGE ' INTRODUC'_ION Slope 1 I Objectives I DATA COLLECTION AND P14ALYSIS,,,,,,,,,,,, Initial Survey Interviews Development of Present Requirements Matrix Linear Gi:owth Projections Modification of Linear Growth Projections Consideration of To.:al Projected Space Requirements BUILDING DESIGN AND USE ALTERNATIVES.......,,,,, Selection of Guide Data for • " " " " 11 ' Building Design arri Use Initial Sizing and Layout I Phased Constructions Expansion Considerations Initial, Interim, and Final Use Layouts Cost Estimates for Principal Construction Options ' SITE PLAN ALTERNATIVES.... Screening of Four Initial Alternatives . I Detailed D,,velopment of Two Alternatives Two Expansion Considerations ' Final Site Plan Selection ' MAIN FEATURES OF FACILITIES PLAN.....,,,,,,, Secure Facility " " 27 Single Location for All Service Activities Operationally Efficient Site 1 I -ii- t INDEX OF FIGURES FIGIIRE PAGE ' 1 Present Physical Facilities Requirements........... 5 2 Projected Space Requirements.. 7 3 Comparison of Linear Versus LWFW Projections....... 8 ' 4 Projected Total Space Requirements... 5 DAawing of Warehouse/Shop/Field Support Facility 12 1 6 Warehouse, North Lower 14 7 Warehouse, NortE Upper , 8 Warehouse, South Lowey 16 r 9 Warehouse, South Upper 17 ' 10 Dodge Cost Evtiinates 18 i -iii- 1 1 ' INDEX OF APPENDICES ' APPENDICES PAGE A QUESTIONNAIRES A-1 B PRESENT USE OF EXISTING BUILDING B-1 ' C INTERIM USE OF EXISTING BUILDING C-1 D PROJECTED 1990 USAGE OF EXISTING BUILDING.......... D-1 1 E RECOMMENDATIONS. . . . . E-1 F SUGGESTED SCL.DULE FOR NEW WAREHOUSE CONSTRUCT:ON F-1 1 1 -iv- ' INTRODUCTION ' icc)p In August 1978, the City of Denton r,:tained Li fsoll, Wilson, rer- guson, and Winick, inc. to perform a facilities; taialysis :or the ' operating service units of the City. The resultu of this analysis were to be integrated into a long-range master plan for develop- ment of the City's Service Center Comp'.ex. Recommendations were to be made concerning facilities needs, requirements for land acquisition, service unit- location, and block space allocation. Ob'ectives The study had the following specific objectives: • Determination of the current space requirements of j each operating unit. ' 0 Projection of the growth of each service unit so that adequate space for expansion with minimum disruption is incorporated into the Service Center Complex long-range plan. • Determination of space and facility requirements ' for a city warehouse. 0 Determination of requirements arid alternate methods ' for land acquisition. s Design of a long-range master plan for development p of the Service Center Complex with interim use provisions to meet current and interim require- ments. -1- ' Additional objectives defined during the course of the study were: ' • Development of cost estimates fir required new construction, • Incorporation of planned security arrangemnnts into Service Center t;omplex master plan. ' LWFW developed four site plans to meet these objectives. These four plans were reviewed by City management in a meeting with LWFW personnel. From the four plans, two were selected for future detailed development and preoe.itation to department heads of each operating service unit. From these two alternatives, a final site 1 plan was selected. 1 ' .2- ' DATA COLLECTION AND ANALYSIS To initiate the study, a "kick-off meeting" was held with all department heads, city management, and LWFW personnel attending. ' The study intent was outlined and questionnaires (Appendix A) were distributed requesting the following information: • Departmental Organization - number and location of ! employees, shift hours, and projected growth. ! • Current Facilities Description - size, location, and condition °f currently occupied space. • 'aehicle and Equipment Storage Requirements - vehi- cle type, quantity, and special storage require- raents; number of employee parking spaces required. t • Warehousing Needs - type and current location of t material stor:d; amount and adequacy of current storage spa-:e; future storage space requirements. Location of Field Work - primary areas in which work is performed. ! • Organizational Interrelationship` - need for physi- cal proximity to other departments to increase work effectiveness. ' Following the distribution of the questionnaires, interviews were scheduled with the department heads to review the questionnaires and discuss particular space problems, requirements, and loca- tionn. The interviews generally indicated a need for more space, ' -3- 1 more suitable space, central location, better security arrange- ments, and/or better inventory control. Some department heads indicated a need for records retention space. Several department heads located at. the present Service Center Complex site indicated a need for improvement in traffic routing at the site. Virtually all department heads indicated a need for improvement in vehicle maintenance. After interviewing the department heads, LWFW personnel surveyed the existing building at the present Service Center Complex site. During this time they observed traffic and operational unit activities. subsequent visits were made to operating units in I other locations such as the power plant, present warehouse, and machine shop. Using the in£ormaLion obtained from the question- naires, interviews, and personal survey and observation, a matrix of present physical facilities requirements was constructed (see t Figure 1). ' Space requirements were classified as office, shop, various types of vehicle storage including empioyee parking, and several cate- gories of large space requirements including enclosed warehouse requirements. Departmental relationships requiring proximity and number of current personnel are also shown J.n the matrix. (Note ' that certain Police Department requirements have been excluded from the totals since these facilities will not be located at the ' Service Center Complex..) This matrix defines the total present space requirements and serves as a basis for projection of future ' space requirements. 1 -4- ~ ~ ~ ~ ~ r r r rp r r~ r r r r~ r r FIGURT: 1 r CITY OF OENTON MUNICIPAL SERVICES PRESENT PHYSICAL FACILITIES REQUIREMENTS l,r, tv lnrir 511JV ~'J ~~RT"~ ~ ' . - ~i,rLrll- p,IKCrc~ - --rc h- 0.1 r n;J, a orr..t V 2 0 ~ - 7 .~C~.veA1 Urcr• INCl pstD llr 5vT7tD _U`'tr•7[k[5' r 7 s. r 1 - 7I usG +f l `~1 IIeC ~ I p"IX UPEX Arty ' IIII Inp .pr, 1 per ro p t 57u YE 67:rr Aril to",[A rp}- 470 Jen/plc Ito, pI5 p11cX r) - - - _ 1,900 CJ 6 r J S nn Si31Jhf-- t E%t 1 prlp _ t_. Fug F' t o,rr 1 Se.lpe _--=J I,A07 rt i _ .4 nq A 3. O{+, - .I l t In _ ~ j.-p _.,S,P2Q.-err a7 F}t} I1 U'r) (7` 1 1 _ ! A - I u~~p 6 2 ir„ _ Qu) UA ry/A - X/A I go N G 2 t ) IAA 2 1 I'7 X;A I'7 ) 2 (AS rf tr Elflwl 2 1 al Lrl 5,3;0 IV? XrA h/ f 5 7 3 2 rp i s) I - Iduy Il Pi) _ 3r'?_- G5.A.9 3r.o_- .2 J1~1 i 37 ru7 9 Ti Ife) I rl tontra , i. t ra5o nIJ l I1 ,A; f U 7atn1 p"frnt rrel for enctotri f"ace, tS, IC) t7. ft, ' 71 lrr: n,t trrrlre lrntcr Ilfc: 14,A7r, f7. It. Q Initial projections of these current requirements v,:ere made util- izing a direct relationship to population. The predicted popula- tion figures which formes' the basis for this projection were taken ' from the City of Denton 1974 Compre:_nsive Plan. More recent estimates by the Council of Governments are in agreement with the t 1974 Plan projections.) The resulto are shown in the Projected space Requirements matrix (see Figure 2). In addition to showing the total space requirements generated by a pure straight-line ' projection, the matrix also snows a total space requirement gen- erated by combining a constant 400,000 square foot "yard" with straight-line projections of all other quantities. This was done because the "yard" space requirement is a large portion of the t total requirement and not directly related to popou.ation growth; therefore, its inclusion as a straight line projection tends to substantially distort the total space requirement figures. Other activities of operating service units are also known to bear ' modified relationships to population growth or to be related to population growth rate rather than to total population. In some rases, technological improvements will probably impact service unit growth and space requirements substantially. Therefore the ' straight line projections were modified as shown it, Figure 3. Figure 3 also shows a comparison between the linear and modified projections with a brief explanation for the modification in the ' remarxs column. -Fctals for both linear and LwF'W modified projec- tions are shown with the inclusion of a constant 400,000 square foot "yard." In response to a request from City management, a -6- r~ r rs ~r . ~r r ~r ~r r~ ~r rr it r ws r r rr FIGURE 2 PROJ:CTEO SPACE REQUIREMENTS (In Direct Proportion 0 Dop,lation Projections") Et EC. DEPT. _ CARAGE MACf_I';E 510P TRAFFIC CIVIL DEFENSE Year X of ~ res . fffce S oF~p Office shop -O - ce' shop amce- Sho- _ PA(ZYS~~wAPEf10U;I Dopulatlon 5/P~~ 5/P S/P -51 P P (ff~e Shop TEnc1csedf - - 1002 2600/]4 2700140 300/2 6000/1 240/ 1 3000/3 150;2 2000/3 150/1 1800/0 1000/6 5200/ 520,000)- 19u0 106.8%_- 2777il5 2P84/4j 32012 6400/7 256/1 3?00/, 160/2 2136/3 160/1 191210 107016 - -5550! 21,360 3383/20 3513/52 390/3 780019 312/1 3900/4 _---__1 -2 17'35 MF2T 1% ..5/J 1600/4 175!1 27 4?/0 1300;8 6760/ 1990 _ 4116/22 4274/67 475/3 9500/11 3;IO11 750!238!3 3166/5 238!2 2850 !O 1580!7 L230/ 3,660 1974 X 4820/26 5006/74 556/4 11,120!1? 445/2 5550/6 278/4 3708/6 278!2 33-+0/0 X640/ 30?fi 3 5652/30 5610/87 652/4 T3,O44/T5~522~2 6522%7 325/4 434817 3?6/2 3913/) 2114/13 11,303 -43,480 - W?ter b ScNa,e- - ;stree t Sani atfnn iotalY(Cgn,tant Y4) Non- Vfhfcle - 1 Year Enclosed+ Ofc S/P Shop SIP Yard 4+ Out'oor d 12)_ rkin . -Pa n Ofc. SrP Shop 5/I'__ __Total ,cL, Ft. Acres .I 197E - 17,330 360/2 2375/35 400.C00 43,10) 51 ,770 0,2 00 120)116 2000/63 616,095 610,635 14.0 1760 82,556 3,5/2 2537/37 427,200 46,031 55 ?37 41,857 f-1175/6 - - - - - 1 21561b1 661,278 631 Wiz 14.C U-•5-J100,6b 1 458 3 5 X0,999 1431/8 2671/83 W5 5 1 , [ 55 6P5,155 15.7 1990 1122,366 570/3- 3760/5 6303,200 (6,1227 G1 7 , _ i- 1 - / f IE 512 62 054 17.1 9 3Ir6 7001 Js , !s 746,9rb 17,1 19?4 143,314 661/4 4403/65 741,600 79,997 95,1 _7_ - _ _ - • _ ?,677 2013!1 3708/117 1,147,9rI 1 E06,361 18.5 UUO 168,050 183/4 5153/76 E69,600 9J, 700 !12,437 221 1371;13 4348/137 1,346,1'8 876,52P, 20. 1 NO tEt Present site size appro., mately egjals 1,011,801 square feet or 23.6 acres Popniation Projections taknr frog City of Denton 1974 Comprehensive Plan S. • Space; P • Personrel + Vehicle (Covered), Covered (Open), Uncovered (Cpen, Paved) ft Uncovered (Open, Unpaved) FIGURE 3 ILM AR1111 OF L1'iEAR YS_ LWFW PROJECTIONS. ' 19911 Li9FAR t WF,! Sq, it%Tersonnel) (Sq. RVIAPKS Sorrel) WATER S_SEWAGE Office 5/0/3 r Shop 4 0/3 3760/55 37;0/45 Cquipmont fmprover.,ents will lower ' ELECTRIC OEPAP-TI tiT personnel growth. Office 4116122 Shop 4000120 Present requirements revised adequately 4274163 3500/6n Field crew requirements relate more STPEEI SA!;1TA to population growth rate than to population ' S 710!i Office 1741/9 Shcp 1500/8 Office and shop space not linearly 3166/100 3000/100 related to field crew size GARAGE Office 475/3 35O/2 Increase in superviso- Shop not required y personnel 9500/11 9500/11 PL1CkiNE SHOP Linear Office 380/2 25011 Shop 47~0/5 4M IS one office b assoc. record 47'0/5 Space re TPAFi1C qulred Office 23313 r 250/2 Present space inadegjate. Increase Shop 3166!5 in si['ervisory parscrnel not required, 1.,,0/4 Work increase related to population growth r,,tt: rather than population growth C1'11L LFF~N;E Office 23312 r Shop 1'0/1 Staff increase not planned, ' 2650,10 1800/0 Equipment growth not planned, PAP,KS Office 15E0/9 r,. Shcp 1 f.1/9 Line„ 8230) I07^,/ Shop space requirement not linearly E!iCLOStn ST,P1„E related to people growth TOTAL 7. 3 Cssrntfally linear F,0,631 144,, 333 H','i•E':C105ED STOPA!iE 122,366 , 120,rr,9, CJtdoOr storage space no; linearly PANKIh, rnlatr,l to population. YCIIICEE STORAGE (Outdoor) 62,0.,4 62,051 81,872 Linear "YARD" 9Q' Or' Additional space required for safe o,eratfon ~ 633,200 1970 TGTAL 400,r))0 "Yard" 980,185 746,3%l relateJJtocpopuglationr.nt nn! linearly ' 0,509 covered and paved 111.500 paved only 1990 TOTAL (Constant 'lard) 746,9M 2090 TOTAL (:cnstant Yard) 876,528 rr~ 859„~, llrcar extrapolation of LWFW esHrate , 1 ' linear projectioi. to the year 2000 based on a curvilinear extra•)o- lation of the 1974 Comprehensive Plan population data is shown. 1 Using the modified projections and adding space requirements for main drainage, road and traffic flow, setback requirements, and landscape considerations the projected total required site size, is r determined as shown in Figure 4. These projections' indicate a ' site utilization of 91.6% n 1990 and 102.5% in 2000. This indi- cates a definite need for land acquisition prior to 2000 and quite probably prior to 1959 since site utilizations above 90% tend to be "tight." r The most beneficial acquisition would be the property east of the present location of the Parks Department buildings. These options will Le more fully discussed later in the report. 1 If this property (approximately 120,000 square feet, 2.75 acres) ' were acquired, the projected utilizations for 1990 and 2000 would r be 92.3% and 92.1%, respectively. 1 1 1 1 1 i r -9- FIGURE 4 ' - CITY OF DENTON SERVICE CENTER COMPLEX PROJECTED TOTAL SPACE REQUIREMENTS 2000 1990 Net Usage 859,508 sq. ft. 746,384 (Non-Linear Projection) Main Drainage 40,400 sq. ft. 40,400 Road & Traffic Flow 120,000 sq. ft. 112,000 Set-B3ck 49,500 sq. ft. 49150 Landsc~oe 20,000 sq. ft. 20,000 1 TOTAL 1,0830408 (24.9 acres) 968,284 (22.2 acres) ' Present site size is approximately 1,056,958 square feet (24,1 acres) 1990 Projection 91.6% Utilization 2000 Projection 102.5.' Utilization 1 1990 Projection (with recommended land acquisition) 82.3% Utilization 2000 Projection (with recommended land acquisition) 92.1% Utilization ' 00T9S: 25-foot s&-back along Paisley Street, 0-foot ;,long railroad tracks, and 10-foot set-back along remainder of perin..,ter equals approximately 49,500 square feet. ' - 10 - -mono ' BUILDING DESIGN AND USE ALTERNATIVES After reviewing the projected space requirements shown in Figure 2, it was agreed by City management and LWFW personnel that the t projections for the year 1990 would be used as the guideline for e building design and use. These figures indicated an increase of 58.37. in space and would lead to accemmodation of needs for ap- proximately the next ten years after allowing time for :financial planning, building structure design, and constru~.tion. ' Using the 1990 projections, a combination office/shop/warehouse structure was laid out as shown in Figure 5. The structure depicted would have a total warehouse space of 29,500 square feet. e Field support space on the second floor at one end of the struc- ture would be 9,000 square feet. Shcp space on the ground level would be 9,000 square feet at each t end of the warehouse for a total of 18,000 square feet. The ' ..ddition of an optional second story opposite the field support space would produce another 9,000 square feet of space which could be utilized as a Records Retention Center or as a0ditio,ial office space for other activities of the City. ' Flexibility for phased construction was a primary consideration in this building design. The layout permits construction to be divided easily into three phases with further subdivision possible if necessary. Phased construction plans with corresponding build- ing use layouts were developed for three primary rptions. Addi- tional options are possible. Corresponding utiliza,ion of space -11- 1 its the existing buildinl is shown in Appendices A, 8, and C. Nc.te Lhat this particular arrangement avoids moving a department twice (although some departments do expand their space twice). t Phase I would involve construcLion of 19,500 square feet of ware- house space, 9,000 square feet of shop space and 9,000 square feet of field support space. Of the 9,000 square feet of shop space, 2,000 square feet would be devoted to crew room space. Initial space use would be as shown in Figures b and 7. This layout also accommodates the desire expressed by City management of providing some separate identity for the utilities department while main- taining the economies of a single site location. Phase II would involve the addition of 9,000 square feet of shop space and possiH y 9,000 square feet of office or record retention space on a second level above they shop space. Space allocation ' would be as shown in Figures 8 and 9. This particular series of space allocations avoids double moving of departments although ' some departments will expand their space twice. This plan also provides the most rapid increases in space to those areas in which ' it is most urgently needed. t Phase III involves tne addition of 10,000 square feet of warehouse space to the rear of ti,e structure. This can be accomplished with minimal disruption to normal operating units. Operating unit ' space allocation would remain unchanged. ' Cost estimates have been developed for each of the three construc- tion options described above. These are shown in Figure 10. Low, ' -13- r r ■r er rt r~ ■r rs ~r r r~ r~ it r~ ~r it ►~r r~ r FIGURE 6 WATER & SEWER ELECTRICAL DEPT. CREW ROOM DEPT. (3,500 sq. ft.) (3,500 sq. ft.) (2,000 sq. ft) WAREHOUSE, NORTH LOWER 1 inch = 20 feet iw ~w ~w ~w w wo w■ aw iw ~w w wr MW w ~w w w w aw ' FIGURE 7 WATER 6 OPEN/RECORD RETENTION SEWER ELECTRICAL DEPARTMENT DEPT. FIELD SUPPORT F. OFFICE; & DRAFTING OFFICE (4,000 sq. ft.) & (4,000 sq. ft.) )RAFTING (1,000 ) WARE11CUSE, NORTH UPPER 1 inch = 20 feet FIGURE 8 PARKS DEPARTMENT STREET F. SANITATION CREW DEPT. ROOM (51000 sq. ft) (3,000 sq. ft) (10000 ) rn i WAREIiOUSE, SOUTH LOWER 1 inch 1.0 feet FIGURE 9 PARKS DEPT. STRNETS & SANITATION DEPT { OPEN/RECORDS RETENTION FIELD FIELD SUPPORT SUPPORT OFFICE OFFICE (5,700 sq. ft.) (1500 sq. ft)(1600 sq ft) WAREHOUSEo SOUTH UPPER I inch = 20 feet 1 FIGURE 10 • DODGE COST ESTIMATES 1 ' LOW _ AVERAGE_ HIGH Warehouse $17.34 $23.66 $28.73 1 Office 31.21 36.70 43.36 OPTION I ESTIMATE 1 28,500 sq. ft. warehouse/shop $ 494,190 $ 6749310 $ 818,805 9,000 sq. ft. office 2801890 330,300 390,240 Total 775,080 19004,610 1,209,045 OPTION 11 ESTIMATE ' 37,500 sq. ft. warehouse/shop $ 650,250 $ 881,250 $19077,375 9,000 sq. ft. office 280,890 330j300 390,240 1 Total 931,140 1,217,550 19467,615 1 OPTION III ESTIMATE 37,500 sq. ft. warehouse/shop $ 650,250 $ 8879250 $1,0779375 18,000 sq. ft. oftice/record storage _ 561,780 _ 660,600 780,480 Total 192,?,030 1,547,850 1,857,855 OPT10N IV ESTINATF 10,000 sq. ft. oarehouse expansion b 3129100 $ ;,x,7,000 $ 433,600 I~ I' II ~I -18 - ' average, and high estimates are shown. The terms low, avers e and high refer to the g ' quality of construction involved. Factors such as building type, amount of insulation, interior finish, and r type of mechanical systems affect the quality and hence the cost of a building. The coot figures presented would provide for the ' use of tilt-wall construction if desired. Costs could be reduced to approximately 80% of those shown through use of very economical r metal building construction. r r r r r r r r r r r r r -19- SITE PLAN ALTERNATIVES ' Using the 1990 projections for total space requirements, L%'FW developed four possible site plans in rough-sketch form. In a ' °seeting with City management, these four plans were reviewed and two were selected for further detained development. Factors affecting the selection were security, current site size, shape, ' and arrangement, external ingress and egress, site and building expansion potential, drainage, internal traffic routing, yard and ' warehouse location, and present facility utilization. 1 Careful consideration was given to site expansion potential. The two r.ioo,t probable expansion locations are thy, northern portion of ' the east boundary and the southern portion of the west boundary. Utilization of the westward expansion would be hampered, however, I by the main drainage ditch which runs near the east boundary of ' the site. The railroad tracks present a firm boundary to the north. Residential and cost considerations make expansion to the ' south and southern portions of the east boundary unlikely. Thus the single most probable and most useful expansion is along the boundary east of the present Parks Department location. The two detailed site plans were reviewed with the major 9epart- ment heads. From these reviews, a single site plan was selected ' for final detailing. This site plan wi~s again reviewed with department heads to insure that proper provision was made for operational requirements. Necessr-.y chang:s were made to the site ' and building plans. A mylar scale plan: was then prepared to serve as a conceptual master plan for site development. ' -20- 1 i The Animal Control Center and the portion of the present site surrounding it were omitted from all considerations in this study ' because of present uncertainty con;erning its future location. If ' the Animal Control Center is m-)ved to another location, then additional space becomeu available for service center use. If it ' is not moved, presently allocated site space is sufficient for substantial enlargement. i r 1 i i 0 w ' -21- t MAIN FEATURES OF IRE FACILITIES PLAN The final facilities plan nas three main features. First, it is a secure facility. The physical design is flexible in that manage- ment may vary the level of security obtained by varying operating procedures. The Lesign facilitates achievement of a very high level of security when appropriate procedures are followed. ' Employee parking is planned to be outside the perimeter fence. Security may be varied by controlling the number, level_ of supervision, and time of operation of the personnel gates. The installation of key- or card-controlled gas pumps will prevent unauthorized use of gasoline and, for the card system, permit tracking of gas useage by individual vehicle. The warehouse is designed for tightly controlled access to facilitate the most accurate inventory control. Again the security level may be varied by controlling the operating procedures. The second main feature of this facilities plan is that it pro- vides a single location for all service activities. The electri- cal department (presently operating from three: locations) is ' consolidated at a single location. The machine s=hop (presently ' located off-site) is located adjacent the garage. All necessary storage and support facilities for the operating service activi- ties are located on a single site. These include warehouse stor- age, yard storage, gas pumps, vehicle maintenance, and machine ' shop. The single point location simplifies site and operational ' management. It also improves the return on investment in security devices. ' -22 1 The third main feature of this facilities plan is that it contains an operationally efficient site design. Employee parking is ' provided close to the employee's initial reporting point. Ware- house and operating unit shop and field support activities are housed in a single structure. Covered parking is provided for t selected operational vehicles in front of the warehouse dock. This expedites marshalling and loading of job materials. Provi- sion is made for controlled traffic routing to prevent congestion and increase safety. Space is provided for the maneuvering of large vehicles with emphasis on multipurpose use of the space. This aids in maximum site utilization without sacrificing opera- tional efficiency. ' Contained in Appendix E is a list of recommendations for facili- ties improvements. The list is segmented into three suggested timeirames for implementation. These recommendations are in sequential concert with the conceptual master plan developed as a part of this study. Appendix F is a suggested schedule for construction of the ware- house facility. The time estimates contained in this schedule may vary substantially with many factors, such as construction indus- try activity level, materialo availability, and construction ' management techniques. Adoption of the recommendations and conceptual master plan devel- oped in this study would leave the present City warehouse/machine shop complex vacant. The City would then have several options 1 -23- 1 including utilization for other prosent needs, retaiiage for future use, or merchandising the property. Discussions with a ' local realtor indicate the property is marketable although the ' price is difficult to assess accurately because of the nature of the structures on the property. 1 1 1 r r r r r r r r r -24- r i 1 1 i 1 ' 1 1 1 1 APPENDIX A 1 QUESTIONNAIRES 1 1 1 1 1 1 1 1 . CITY OF DENTON SERVICE CENTER SPACE PLANNING STUDY QUESTIONNAIRE Department Telephone No. ' Respondent Location Title 1 I. DEPAR'IMENTAL ORGANIZAT10y ' A. Brief Description of the Responsibilities of the Organization ' B. No. of Employees in Departmcrtt (Please attach organization chart) C. Hours of Wurk D. No. of hmployces Currently I.ocated at Citv' - o Service Ccntcr E. No. of Employees that Should Be Located at City's Servir, ' Center F. Projected Employee Growth. 11177 - - 1980 1981 _ 1 II. CURRENT FACILITIES DFSCRIPTTON A. Whit space is department currently occupying (Service Center and other) r LOCATION SgPARE FEET USE, !J GF EMPLOYEES 1 - r B. What is the condition of the current space (Service Center 3rd Other) ' LOCATION PHYSICAL CONDITION MOUNT (rood, ~.I,~quatc, Poor) (Good, Ticht, Inadequate) t III. Vi?IIICLi_S AN10 EQUIPMENT STORAGE; REOUTRF.NEN'PS A. Vehlcl~~/t~(luipmcnt Uoscrlptinn # on (land Stn . - - rnv ,r_ Hecuirements r B. Describe any projected growth in the number of vehicles and equipment over the mzxt three to five years. 1 C. Estimate the number of employee parking spares you currently require for field (Service Center personnel) and project this for the ' next three to five years. IV. WARKHOUSINC, NEEDS ' A. Generally describe the types; of matcrial you require in inventory to support your operations (differenti.ztc between under roof and open) ' 1+. i.; ire ire. thUse, materials currently being stored and is this storage area and location •adequ.iLc? 1 ' C. Estimate the amount of sparn (square feet) that is required to meet your material inventory needs now and in Clio future (covered and open) V. LOCATION OF FIELD WORK ' A. Describe the service area you serve. 6. Do your field personnel nhend the majority of their time is Iny ' spacific geographioal locations? V[. O;'r;,C~I'L;1'1'10::Ai, ItiTEItkI:LA'flb~'SlIIPfi ' A. Are there any other departmenC, or activitles your people should ' be located near to incrcane their work effectiveness? (are they currently close) 1 1, • I . B. Describe any problems (both communications or work force effective- ness that currently exists due to the current facilities and their relative locations. VII. Please describe any suggestions you have regarding Denton's current and ' future service center needs and how these needs can be met. 1 1 1 1 t ' APPENDIX B ' PRESENT USE OF EXISTING BUILDING 1 1 r r r Ir r r r r r r Mon r r r r' m mm II 1 1~ I ~ I I ! f:+:rsl ~%T. Sc~f'Y/CGr CfiS'i.!" r ~P%%'c ~ /JLSOC,/.r X23 ~ • i- I I ~ . - f ~ ~ ~ i { . , I ~ i ~ , i I I I I { { I I ! GA.c~'~E I I, IsMnt--~Ilnn I _ Ffwl,I I kill. I u FC -V 10 \ of. Gr6 OIc Oft IIIiN~••.l1iNHinF....1}HnntM~rltHinMt~~lf I1111iH! !Ft!!!!!!1~~~ s rNNIN ! { tcru;l;n sums I I r.: 1 APPENDIX C t INTERIM USE OF EXISTING BUILDING 1 e t ~ !il~j~'If~ i j f~~~i llil~'~ Ii " I I ~ i ~ ~ i I I ~ I , I ~ II ~ I ~i ~ i I ~ I I k I ~I ~ t i, tttMT1~~111N1tM w7LSi4+e:P,O.Ea ~ ~ ✓i /i~i~ ~%n'. r 'i~ r~ I ~ ~F'/-:r:~i iv/<//ic'/.;:. i (liic~s`.rl LGLii: i~i5l I ~ i ' MMk11F~~IHI1MItl~It}ftltMi~It11HHN~.y1tI1W11 }±}}}x iHlll;I Itl~Illli~~ ~~ItMMIN ~ I i I I ~ I I i i I I I i i ~ { ~ ~ 1 1 1 1 1 1 1 1 1 APPENDIX D PROJECTED 1990 USAGE OF EXISTING BUILDING i 1 1 1 1 1 1 1 1 I ' / 99.9 ~iPc'J✓e'Ci.!%> ~ Us%'lyE" D~" d.!/s'T, rVG ~ t; ✓/L ~.%3 i.' ~ ~ I ~I I I I ~ ~ I r//- /~z pY~f'f~ii/~ :r J 'Ov I i i I I ~ I I I i ! I I I i I I I , /NitNl/I~NHF11Nlt~tS7lfNMh~tttHSNt!{fS1iSW1i~/'~d0~~"6'p~+~NIN!!1 HtS1;SS NNNtN~ r11NN I j I I I I I I I ! 71: Milli w ' rw rr' ~Iw As ~w we w w~ w~ w ~Iw w~ s wo r w 1 1 t APPENDIX E ' RECOMMENDATIONS 1 1 I ' APPENDIX E RECOMMENDATIONS ' A. Short-TeianLO to 6 Months) 1. Install apace heaters in garage. 2. Replace canopy over gas pumps. ' 3. Install key- or card-controlled gas pumps ' 4. Select a service center (site) manager (from present personnel). 5. Repair presently used gr.te to improve security.' B. Intermediate Term (6 to 18 Months) 1. Extend asphalt paving and widen access to parking area west of gas pumps. ' 2. Change location of auto pound. 3. Change location of bulk storage. t 4. Relocate southern boundary fence. ' 51 Close street through present employee parking area. 6. Install curbing to control queuing at gas pumps and traffic routing. 1 7. Install personnel gates in perimeter fencing as desired/required. 8. Install security devices (fence detectors, night watchman, etc.) C. Long-Term 1( 8 Months Plu!;) 1. Construe` new warehouse. 2. Consolidate electrical department at service center complex. 3. Move machine shop to service center. ' 4. Possibly relocate Parks Department on acquired land. 1 E-I 1 1 1 1 i 1 1 1 APPENDIX F SUGGESTED SCHEDULE FOR NEW WAREHOUSE CONSTRUCTION 1 1 , 1 1 1 e e e e APPENDIX F SUGGESTED SCHEDULE FOR 1 NEW WAREHOUSE CONSTRUCTION ITEM TIME REQUIRED 1 1. Schedule and interview A/E firms. 2 Weeks 2. Select qualified A/E firms and 2 Weeks 1 and issue RFP. 3. Await proposals from A/E firms. 4 Weeks 1 4. Review proposals from A/E firms 2 Weeks 1 and select A/E firm. 5. Preparation of construction drawings. 6 Weeks ' 6. Receive bids from contractors. 4 Weeks 7. Review bids and select contractor. 1 Week 1 8. Construct new warehouse. 24 Weeks TOT45 Weeks i 1 1 1 1 1 1 1 1 F-1