HomeMy WebLinkAbout09-13-1993
1
M WrF',i~
QO46; o F Q1)
~0~; + vOvO
Q
Q
G
P ~
~ r o. H t ~ X000
~00aooaaao~o~
I
CITY COUNCIL AGENDA PACKET
September 13, 1993
h
~Qe}MeNo,.r,,, 3 -03
~penda~t
AGENDA oate .3 -
CITY OF DENTON CITY COUNCIL
September 13, 1993
Joint Session of the City of Denton City Council and the Keep
Denton Beautiful Board on Monday, September 13, 1993 at 11:45 a.m.
in the Civil Defense Room of City Hall, 215 E. McKinney, Denton,
Texas at which the following item will be considered:
i
11145 a.m.
1. Hold a discussion, consider locations and give staff direction
for using the $100,000 landscape grant from the Governor's
Community Achievement Awards.
Following the conclusion of Item 01, the Keep Denton Beautiful
Board will consider the following items:
1. Approval of the minutes of the July 120 1993 meeting.
2. Consider approval of a matching grant request for Hobson Lane
at Forrostridge
3. Committee Appointments
C E R T I F I C A T E
I certify that the above notice of meeting was posted on the
bulletin board at the City Hall of the City of Denton, Texas, on
`hem') day of , 1993 at o'clock (a.m.)
CITY SECRETARY 1
NOTE: THE CITY OF DENTON CITY COUNCIL CHAMBERS IS ACCESSIBLE IN
ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. THE
CITY WILL PROVIDE SIGN LANGUAGE INTERPRETERS FOR THE
HEARING IMPAIRED IF REQUESTED AT LEAST 48 HOURS IN
ADVANCE OF THE SCHEDULED MEETING. PLEASE CALL THE CITY
SECRETARY'S OFFICE AT 566-8309 OR USE TELECOMMUNICATIONS
DEVICES FOR THE DEAF (TDD) BY CALLING 1-800-RELAY-TX SO
THAT A SIGN LANGUAGE INTERPRETER CAN BE SCHEDULED THROUGH
THE CITY SECRETARY'S OFFICE.
ACCO0140
aperMoNo_.~_ 03.E
AQee0,itlm
Uttt - /
a7 A.//
KEEP DENTON BEAUTIFUL BOARD
Minutes
July 12, 1993
The Keep Denton Beautiful Board held its regular meeting at 12:00 on July 12,1993, In the
Civil Defense Room of the Municipal Building at 215 E. McKinney Street,
PRESENT: Jenne Morrison, John Cooper, Gertrude Gibson, Bill Watson, Martha Len
Nelson, Dave Boston.
ABSENT: Dick Engle, Betty Kimble, John Enlow, Sherry .Etheridge, I.B. Smallwood,
STAFF: Cecile Carson, Coordinator; Owen Yost, Urban Planner; Cindy Cranford,
Secretaty.
Mr, Cooper called the meeting to order, due to the absence of Chairman Engle.
L Approval of the r~Latutes of the June 7, 99 a ing
Ms, Nelson moved to approve the minutes of June 7, 1993. Mr. Boston seconded
and the motion carried unanimously (6.0).
H. Co si e guidelines and nroceduLes for Adnpt•A•Cnot atm. chino f~llti~,
Ms. Carson reported that the issue of how much planning, time to consider toward
the matching funds hi!d not been addressed. She said there could be groups that
spend a great deal of time in the planning phase of the project, but no actual time
and scant their time to he considered for the matching funds. Ms, Carson mentioned
that moat volunteer hours ure calculated at a rate of $5.00 per hour. She suggested
the Board might want to look at the time the project actually gets started rather than
the conception o1' the idea when considering matching funds.
The Board discussed several possible options:
(A). Shorten the length of time from five (5) years to two (2) years to help Insure
that the project gets completed.
(B), Limit the number of planning hours that would count toward matching funds,
(C), The group should provide some type of investment of their own, The
investment could be additionnl funds, plants, equipment etc.
(D). Not more than 15% of the total cost of the project should be spent in
~CendaHo 9.~ -0 3s
~endaltem~
_..Q
Keep Denton Beautiful Date
Minutes
July 12, 1993
Page 2
planning hours.
(E). Projects would need to be carefully reviewed and not all grants should receive
the marlmunt match.
(F). The time limit should insure adequate time for plants to establish. The Board
should give more to low maintenance projects.
Nis. Carson stated that the $1000 match by K.D.B. does not include water. K.D.B.
and the City cover that separately.
Mr. Watson made the motion to limit the percent of credit for planning hours to no
more than 154'r of the total cost of the project. Ms. Gibson seconded and the motion
carried unanimously (6.0).
Air. Watson moved to change the length of time for the Adopt•A•Spot program from
five (5) years to two (2). Nis, Nelson seconded and the motion carried (5.0). Ms.
Morrison abstained,
111, Discuss nhtns "or the O'Neil Ford Muni~i1m Co I
Nis. Nelson Informed the Board about the possibility of the bricks around the
Municipal Building being replaced with pavers. The Board held a brief discussion
about the brick sidewalks. Ms. Nelson made the motion to recommend that the
bricks he left and maintained rather than replace them with pavers and destroy some
of the aesthetics of the building and surrounding area. Nit. Watson seconded and the
motion carried unanimously (6-0).
1V. e'v t reonrt un the Keep Tex-a Beautiful Inc. Annual Cnofrr,• t
Nis, Morrison provided materials from the conference and pictures of the conference
were reviewed.
V. cider se"O a tie, dottu ince for the annual retrPa,
The members discussed Saturday versus a business day and decided on a Monday.
It was decided to try and hold the retreat on either August 2nd or 9th at the
Women's Building, The Board decided it would be better to have the retreat on one
day instead of two. Nis, Nelson said she would check on the availability of the
Women's Building.
AQvdaNo-_Q,3S -
Apetldalteq
rate
Keep Denton Beautiful
Minules
July 12, 1993
Page 3
VI. Cmjs ler setting a meeting dole nnd_IjM discuss IocntjQ~~r the $100.000
a ctactipe grains,
The Board decides that it would be best to hold a meeting at 4:00 or 5:00 on n
Tuesday hel'ore Council, so they could get ai idea of what the Council had in mind
for possible locations. The meeting would also be open for citizen input,
The meeting adjourned at 1;05,
I
'I
AgendzlM
Date !2. 3
Forrestridge Beautification Project
Project Description
A Beautification Committee was formed in the
neighborhood in Fall 1993. Through many meetings and with
the assistance of the City of Denton Parks and Recreation
Department, the following design plan was developed,
The first phase of the project will be the entrance at
Hobson Lane and Forrestridge Drive with both sicei of the
entrance sharing the same design. The existing rock and
wood fences will be faced with a dark red brick,
complemented by sand blasted stone insets of "Forrestridge".
The signs will be lighted at night ani flanked by large
Nellie R. Stevens and an ornanmental tree on each side.
Below the signs, will be Compact Nandina serving as a back
drop for annual color bogs.
the next project phase will be the medians, where the
existing tuf will be removed and replaced with shrubbery and
ground covor. A cluster of large shrubbery will be planted
in the center of each median, transitioning to medium
shrubbery, ground cover and annual color beds moving toward
each end of the medians. Finally, the and sections of the
medians will be protected by a length of red brick.
i
~i N
p l Q Forrestrldge Beautification Project
~ I I--Entnnc~
1C~
~NUMIVI pW{II 4JJVp VW
Vy
'V
I;IFORRSSTIRIDGE,; ~.Na~cc.a~IN,M„r
Ji M1SOn ylON 4yN
1
DFSION FOR F.N'fRANCE SIGNS 6EA40NAL IAVpye Dwly r►now
? uuR
Ncl+srn
P_tuM tl - -t~t~N~Irn ept
f'R YI ~IEIQrE WICK /Aj'([QN[0 IONLIEfE ~IW~N,{iOiNA~ /N[Lltf e, SS[VEI1S NDUy N,s1U NJ. IOINA~ iA~(E¢N[D [dIC1EfE
JJuuNAL Ccmp,cl W'01NA (UMrACf OIAIIDUU euwR>
CQ cc pwARf [+t~DCV aa+.y pwle( eutfccD Ncuy
Iln
1') VM
IN~tU~
111t1~-:~ .~Zfi_-
a
Ag soda No
Apendaltemi,
Dale-"- Yilt_
Forrestridge Beautification Project
project Estimate
Phase I-Entrance and First Median
Sign Insets $1,600
Plant Material 11900
Sprinkler System 1,900
Electrician 700
Bricklayer 1,200
Shrub & Turf Removal 500
Brick and Concrete 1.200
Lighting 500
Sub-total Phase I $9,500
Phase II--Medians
Plant Material $5,000
Irrigation System 3,500
Brick 1,000
Sub-total Phase II $ 91500
Total Project Cost $19,000
=aaa=si
Ii
Forrestridge Beautification Project
Summary of Cash/In-Kind Services Donated
Cash Qonated
A cash total of $4,500 has been donated by the Forrestridge
Homeowners.
In-Kind Services Donated
Electrician s 700
Bricklayer 1,200
Shrub & Turf Removal 500
Brick and Concrete 1,200
Total $3,600
The Forrestridge Homeowners Association will maintain the
landscaping upon completion.
Committee members have spent approximately 500 hours in the
last 7 months working on this project.
I