HomeMy WebLinkAbout2019-11-04 Agenda with BackupCit of Denton City Hall
Y 215 E. McKinney St.
Denton, Texas 76201
www.cityofdenton.com
DENTON Meeting Agenda
City Council
Monday, November 4, 2019 12:00 PM Work Session Room
WORK SESSION BEGINS AT 12:00 P.M. IN THE WORK SESSION ROOM
After determining that a quorum is present, the City Council of the City of Denton, Texas will convene in a
Work Session on Monday, November 4, 2019, at 12:00 p.m. in the Council Work Session Room at City
Hall, 215 E. McKinney Street, Denton, Texas at which the following items will be considered:
WORK SESSION
1. Work Session Reports
A. ID 19-2240 Receive a report, hold a discussion and give staff direction regarding capital improvements
to downtown Mews Streets (Pecan, Austin, Walnut and Cedar).
Attachments: Exhibit 1 - Agenda Information Sheet
Exhibit 2 - Presentation
B. ID 19-2601 Receive a report and hold discussion regarding the Mayhill Road (Phase 2 - DCTA
bridge) from Colorado Boulevard to north of Quail Creek Road improvement project.
Attachments: Exhibit 1 - Agenda Information Sheet
Exhibit 2 - Presenation
NOTE: The City Council reserves the right to adjourn into a Closed Meeting on any item on its Open Meeting
agenda consistent with Chapter 551 of the Texas Government Code, as amended, or as otherwise allowed by
law.
CERTIFICATE
I certify that the above notice of meeting was posted on the bulletin board at the City Hall of the City of
Denton, Texas, on the day of , 2019 at o'clock (a.m.) (p.m.)
CITY SECRETARY
NOTE: THE CITY OF DENTON CITY COUNCIL WORK SESSION ROOM IS ACCESSIBLE IN
ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. THE CITY WILL PROVIDE
SIGN LANGUAGE INTERPRETERS FOR THE HEARING IMPAIRED IF REQUESTED AT LEAST 48
HOURS IN ADVANCE OF THE SCHEDULED MEETING. PLEASE CALL THE CITY
SECRETARY'S OFFICE AT 349-8309 OR USE TELECOMMUNICATIONS DEVICES FOR THE
DEAF (TDD) BY CALLING 1 -800 -RELAY -TX SO THAT A SIGN LANGUAGE INTERPRETER CAN
BE SCHEDULED THROUGH THE CITY SECRETARY'S OFFICE.
Page I Printed on 11/6/2019
City Hall
City of Denton 215 E. McKinney St.
Denton, Texas 76201
www.cityofdenton.com
DENTON
File #: ID 19-2240, Version: 1
Legislation Text
AGENDA CAPTION
Receive a report, hold a discussion and give staff direction regarding capital improvements to downtown Mews
Streets (Pecan, Austin, Walnut and Cedar).
City of Denton Page 1 of 1 Printed on 11/1/2019
powered by LegistarTM
City of Denton
City Hall
11,1114TO215 E. McKinney Street
DENTON Denton, Texas
www.cityofdenton.com
AGENDA INFORMATION SHEET
DEPARTMENT: Capital Projects
CM/DCM/ACM: Mario Canizares
DATE: November 4, 2019
SUBJECT
Receive a report, hold a discussion and give staff direction regarding capital improvements to downtown
Mews Streets (Pecan, Austin, Walnut and Cedar).
BACKGROUND
The "Mews Streets" were first identified in the Downtown Master Plan in 2002. They are the back streets located
off the Courthouse -On -The Square area (Pecan, Austin, Walnut, and Cedar). Improvements to these streets have
been discussed for many years. This project will develop the framework for a future CIP project. Current
conceptual design key scope tasks included:
Task 1— Project Initiation and Management: The engineer coordinated collaboration meetings with the City and
key stakeholders including: Engineering, Economic Development, Planning, Traffic, DME and Solid Waste
throughout the project duration to identify and develop main design elements/features of the street cross-sections
and horizontal geometry.
Task 2 — Public Engagement included Project Office Hours, Property Owner Meetings, Community Workshops
and a City Council workshop.
Task 3 — MEWs Street Plan Development: Engineer developed initial horizontal exhibits with several cross-
section alternatives. Engineer developed three (3) plan layouts and associated costs for a Basic, Enhanced and
Luxury Layout Options.
Once a conceptual plan for the enhancement of the Mews Streets is selected by the City Council, staff will
present the selected alternative to several committees to gain input and prepare a scope for developing the
schematic design (30% engineering plans). Based on the availability of funding, the design for the project will
be completed in approximately 10 months and the construction phase will require approximately 18 months.
OPTIONS
1. Basic Layout
2. Enhanced Layout
3. Luxury Layout
RECOMMENDATION
City staff recommends the Enhanced Layout as a beginning point. Furthermore, City staff recommends
gathering input from several committee's followed by engaging an engineering design firm to develop a
schematic design.
ESTIMATED SCHEDULE OF PROJECT
Schedule to be determined based on available funding and City Council direction.
EXHIBITS
1. Agenda Information Sheet
2. Presentation
Respectfully submitted:
Pritam Deshmukh, P.E.
Deputy City Engineer
Prepared by:
Michael D. Smith, P.E.
Senior Engineer — Engineering Services
Mews Street Improvements
November 4, 2019
Pritam Deshmukh - Capital Projects
IMPROVING
D�i� icc)r� 11,4,19 19=240
Overview
• Project Goals and Status
• Existing Conditions
•Planning Phase Timeline
• Public Feedback
•Solid Waste
Proposed Improvements and
Beautification Options
• Project Element Costs
IMPROVING
D L i \4 1 i IN 11/4/19 19-2240
2
Project Goals and Status
• Goal
• Develop options to improve the streets off the face of the
Square, focusing on pedestrian accessibility, ADA
compliance and aesthetics.
Status
• Completed public engagement and have developed 3
options for improving these streets
IMPROVING
D L N�
11/4/19 19-2240
Street Map
• Cedar Street
• Pecan Street
• Austin Street
• Walnut Street
IMPROVING
DLi\4 i N
wr
NNEY
1 - ti Y� 1 `` -__• —__—__ - - _ � __ a "- �_
0.1fr
Gf�AFE`!� t, •. ,F _ - -.. } I�
A1,-
-
- - � ��.. mac � l�Ecr .be .� �' �e � � --• . � �
ST
Ad-
' F 1 !' (FI�1�1
A�. r _ I -- -- h. `e�. I - Llln! L 5
f
{
- - n- I _� �a� w}tt 11A�tt�,,rr a u c +�� r _ • t.. n r 3r , 4
I _� � A "� ¢ ":+�►�.µ of � # �... 1
�11—
1r p
t.
I cT .- MV LJLNHY 'I
ok
MEWS STREETS UPROVEMENTS PROJECT AREA
11/4/19 19-2240
Cd
Meeting with
Downtown Group
Nov 19, 2018
Public Open
House
pec 13, 2018
2018 0�1r:
Office Hours
uvc 4, 2018
•
•
Online Survey
Jan 24 _ .._ 1 7, 2019
IMPRODLi\4iCC)r
Planning Phase Timeline
Solid Waste
Assessment and
Pilot Project
•
11/4/19 19-2240
City Council
Presentation
ri ov 4, 2019
�Ta• k, I*
Implement Trash Valet
(Downtown Square)
2019
Mews Street Public Feedback
• Parking, Roadway and Pedestrian Feedback
• Two -Way Streets
• Safety Improvements Needed
• Lighting
• Increased amount and width of sidewalks
• Solid Waste and Loading Zones
• Valet Service
IMPROVING
DL i'�4 i icc)r
11/4/19 19-2240
Valet Service - Downtown
• Valet Service rolled out in the
downtown area on September 9,
2019
• Most businesses are assigned 1-3
carts for trash use and 1-2 for
recycling.
• All dumpsters in the Mews Street
area have been removed as of
October 21,,2019
• Estimated gaining between 13-20
parking spaces
IMPROVING
DLi\4 I iCC)r 11/4/19 19-2240
P
V.
7
F
P
V.
7
Proposed Street Cross -Section
u
IMPROVING
DLN I (OLC)r
11/4/19 19-2240
Basic Layout Option
no
IMPROVING
DLN C)N
11/4/19 19-2240
0
III
01
Basic
Streetscap'i*ng
& Landscaping
• Bike Racks
• Trash Cans
• Illumination
is Street Trees
IMPROVING
DLi\4 I i C-C)r
7.j
11/4/19 19-2240
Enhanced Layout Option
CLL
IMPROVING
DLN C)N
11/4/19 19-2240
lnunc;eu
-
-'reetscap,i,ng..laturesj
Stamped/Stained
-L W ----I
1)[71\j 1 ((4
11 ^ 0 �;.-
ot1
nnuncec
:3ndscap
Paturps
1} "r
Luxury Layout Option
IMPROVING
DF-il�4 i ((
11/4/19 19-2240
Luxury
Streetscap'i'ng
Features
• Stamped/Stained Concrete
Parkway, Crosswalks, and
Parking Stalls
• String Lights
• Benches, Bike Racks, Trash
Cans, & Illumination
IMPROVING
DL1\4 I iCC)r
11/4/19 19-2240
Crosswalk
Options
Stamped/Stained
Concrete (Right)
• Stamped/Stained
Asphalt (Left Top
and Bottom)
IMPROVING
DLi\4 i N
11/4/19 19-2240
arlubt;uPirlc�
P_
n
f u
rp-
q -
MAIL
1)[71\j 1 ((4
Street Improvement Opinions of Costs
Cedar Street
Remain As -Is
Pecan Street $1.7M $1.9M $2.1M
Austin Street $1.9M $2.1M $2.6M
Walnut Street $1.8M $2.OM $2.3M
Total $5.4M $6M $7M
IMPROVING
DLi\4 I iCC)N
11/4/19 19-2240
Street Improvement Recommendations
• Enhanced Concept Option As Shown
• Include Elements of Luxury - If Funding is Available
• Could Include:
• Additional Tree
• Crosswalk Pavers
• Parking Pavers
• Additional Planter Pots
• String Lights or Other Decorative Elements
IMPROVING
DLi� i CIC)N
11/4/19 19-2240
Schedule
Design
10 months )
Utility Relocations -4 10 months
Bidding
Construction
lyll
2/2020
Design Contract
Execution
IMPROVING
DLi\4 I iCC)r
I
3 months
5/2021
Construction
2/2021
Bidding
11/4/19 19-2240
18 months
Potential Funding
• Potential Sources
• Certificate of Obligations (CO's) issuance
• Downtown Tax Increment Reinvestment Zone (TIRZ)
• Future Bond Program
• Phased Approach for Funding
• Phase 1: Fund Design - $1 M
• Fund schematic phase of the project - Approximately $350K
• Fund remaining design phase -Approximately $650K
• Phase 2: Fund Construction - $6M
IMPROVING
DL1\4 I iCC)r
11/4/19 19-2240
21
Next Steps
• Input from Committees
• Downtown TIRZ Board
• Downtown Mainstreet Association
• Downtown Economic Development Committee
• Parks, Recreation and Beautification Board
• Historic Landmark Committee
• Committee on Persons with Disabilities
• Planning and Zoning Commission
• Schematic Design
IMPROVING
D L: IN 11/4/19 19-2240 22
Questions ?
IMPROVING
DLN i N
�.� y D�ENTON
^E ,
WckiHrvEr ST
t SOLkik-
__ col 4U,
i _ i' � I • N �� i � -1 1 �/
41
urate
11 rr P.M t E IMF
..
�-{ p I
e
..IiY� wt.�
4
� � ' ` ` r �, • _ -r 1, I --' ,� � . rw
re
is' I e v
{ e
Vq
i r�Fhi
s o ,lh -A
Stl 44�.r sl� � �, Y� e � �C �I� � I I � ■ of Ic F rpt '. t _
eF 1 _r=cF�c 7
0 t.
� c
MEWS STREETS IMPROVEMEMTS PROJECT AREA KIm�CyH�fll
11/4/19 19-2240 23
City Hall
City of Denton 215 E. McKinney St.
Denton, Texas 76201
www.cityofdenton.com
DENTON
Legislation Text
File #: ID 19-2601, Version: 1
AGENDA CAPTION
Receive a report and hold discussion regarding the Mayhill Road (Phase 2 - DCTA bridge) from Colorado
Boulevard to north of Quail Creek Road improvement project.
City of Denton Page 1 of 1 Printed on 11/1/2019
powered by LegistarTM
City of Denton
City Hall
11"'t"Mmm215 E. McKinney Street
DENTON Denton, Texas
www.cityofdenton.com
AGENDA INFORMATION SHEET
DEPARTMENT: Capital Projects
CM/ DCM/ ACM: Mario Canizares
DATE: November 4, 2019
SUBJECT
Receive a report and hold discussion regarding the Mayhill Road (Phase 2 — DCTA bridge) from
Colorado Boulevard to north of Quail Creek Road improvement project.
BACKGROUND
The Mayhill Road corridor from University Drive to Colorado Boulevard has been under consideration for
capacity improvements with certain segments (section) in different phases from design, through
construction. The first phase of Mayhill Road from University Drive to just north of Quail Creek Road is
currently under construction and will be completed by February 2020. The second phase of the Mayhill
Road project extends from just north of Quail Creek Road to Colorado Boulevard which is currently under
design and scheduled to begin construction by next summer (May 2020).
The second phase of Mayhill Road is primarily a transportation corridor improvement project which also
includes considerable upgrades to the drainage system in this area. The existing segment of Mayhill Road
between Quail Creek Road and Colorado Boulevard will be realigned to eliminate the existing horizontal
curve which will improve the overall safety and mobility along this segment of the Mayhill Road corridor.
The proposed project will also grade separate the vehicular traffic along Mayhill Road from the commuter
DCTA rail line. The drainage system improvements would include two regional detention ponds with
various inlet and outlet structures that would potentially mitigate/reduce the existing downstream floodplain
impacts.
EXHIBITS
1. Agenda Information Sheet
2. Presentation
Respectfully submitted:
Todd Estes, P.E.
Director Capital Projects/City Engineer
Prepared by:
Tracy L. Beck, P.E.
Senior Engineer/Project Manager
COAD
[-O.SFP
..
L. rh*111 II
Phase 2
Phase 2
Extension over DCTA Rail
IMPROVING
DTENTON DIYNTEN
Purpose
• Improve Safety
• Eliminate at -grade
railroad crossing.
• Eliminate horizontal
curve
• True "Quiet Zone"
• Increase Mobility
• Direct connection to 1-
35E
• Reduce travel time
• Eliminate signalized
intersection
• Flood Control
IMPROVING
D L i \4 ii N�
/pq
11/4/19 ID19-2601
2
Project Map
• Phase 1: Mayhill Road currently under
construction
• Phase 2: Mayhill Extension over DCTA
Bridge to connect at existing
Mayhill/Colorado
IMPROVING
DLN I (C''C)N
11/4/19 ID19-2601
P l
3
Phase 2: Extension & Bridge over DCTA Rail
• Increases mobility with seamless
"straight" connection from IH 35 to
NEW Mayhill (no more turns at
Colorado to stay on Mayhill).
• Enhances safety by eliminating at -
grade railroad crossing.
IMPROVING
D L N
i
11/4/19 ID19-2601 4
•Iei•
L)[7i\j 14
•1•
r
I
�I!I! II
AI11Ili
4711 lri
1XI OF
d—aw-o.rz` 4!",
1p '
IN111l 16
w
lki
p ti
J!R �► i 7M illllkwo
II #Hllir4 —
I
m
Flood Control Concepts
!I
EXISTING CHANNELIZED CREEK
11/4/19
MA WE I I I NJ 1611 ael KIJ 2 1* LTiIVA we(*
Design
Real Estate Acquisition & Relocation
Construction Road & Bridge
Construction Pond
City Project Management / Const. Admin
Contingencies (Real Estate and Construction)
Total
1)[71\J 1 ((4
Cost
MAYHILL PROJECT - PHASE 2 (SCHEDULE)
1. Initiation
2. Design
3. Right of Way
4. Bid & Award
5. Construction
. Closeout
IMPROVING
DL N i (0,LC)r
2020 2021
11/4/19 ID19-2601
MAYHILL
CORRIDOR
TIMELINE
W
exas
)man's
9 Kwik Kar Lube & Tune
Q
O
k
Denton La dfill
0
Interchange Phase 2 —City
Project a Project Construction
BeginsConstruction May 2020 to July
May 2021 2021
IMPROVING
DLN(0,L,C),N
--
a
a
P
s
I11/4/19 I D19-2601 ���
IMPROVING
DLN I (OLC)r
Question.s?
11/4/19 ID19-2601
10