RESOLUTION NO. zO - 3
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DENTON, TEXAS, SETTING
A MAXIMUM EXPENDITURE LIMIT OF $720,814 FOR THE POLICE CITY HALL EAST
EXPANSION PROJECT; REQUIRING MONTHLY REPORTING TO THE CITY COUNCIL
OF THOSE FUNDS; AND PROVIDING AN EFFECTNE DATE.
WHEREAS, on March 4, 2008, the City Council of the City of Denton authorized the
expenditure of funds by Ordinance No. 2008-052 related to the renovation of space at the City of
Denton Police City Hall East Expansion Project ("Project") by the Facilities Department; and
WHEREAS, the City Council desires to set a limit of the amount of funds to be spent for
the Project; and
WHEREAS, the City Council requests that the Facilities Department provide a monthly
report of expenditures for the Project; NOW, THEREFORE;
THE COUNCIL OF THE CITY OF DENTON HEREBY RESOLVES:
SECTION 1. The City Council is setting a limit of $720,814 for expenditures related to
the renovation of space at the City of Denton Police City Hall East Expansion Project, as
referenced in Exhibit A, which is attached hereto and made a part hereof. The $700,000 will be
acquired from bond funding. The $20,000 for construction management will come out of the
Facilities Management 2007-2008 budget as shown in exhibit "A"
SECTION 2. The City Council is requiring that a report be provided to Council showing
the expenditures for the Project on a month-to-month basis, as referenced in the example Exhibit
B, which is attached hereto and made a part hereof. Exhibit "B" is an example report and its
contents and format may change at the City Council or City Managers request
SECTION 3. This Resolution shall become effective immediately upon its passage and
approval.
G
PASSED AND APPROVED this the ~`sy day of , 2008.
c~~
PERK R. McNEILL, MAYOR
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
BY:
s:\nur documents\resolmions\08\cap & mo rept police projccl.doc
APPROVED AS TO LEGAL FORM:
EDWIN M. SNYDER, CITY ATTORNEY
BY: ~ ~
Page 2
Exhibit A
BRUCE HENINGTON, CFM
EXECUTIVE DIRECTOR OF
FACILITIES MANAGEMENT & FLEET SERVICES
OFFICE: (940) 349-7200
940)349-8134
FAX : (940) 381-5401
EMAIL: brute.henington®cityofdenton.com
www.cityo/denton.com
60d E. HICKORY • DENTON, TEXAS • ]0205
lob Name: Police CHE Expansion April 2008
lob No.: 7777 Page 1 of 3
Date: March 14, 2008 Ref.owg.: MEP1A7777
Design by: David Robinson Chkd. By: bh~POIICe
1. NEW CONSTRUCTION INTERIOR SHELL FINISH-OUTTO INCLUDE (BASIC CONSTRUCTION):
YELLOW (#1) ON ATTACHED MAP (Estimated Cost: $276,182)
Hard the surface for Sft wide hallways emergency lighting
Paint, sand, light texture sheet rock metal stud finish; no insulation
Minimum of 4 electrical outlets in every office
2 New HVAC with 2 zones only for 13 new offices, radio room, squad room, and storage
Approximately 114 data/phone drops
Emergency exit lighting and electric to meet code
Solid wood core doors; not to match expensive existing
Permitting
All to meet Municipal Code
No plumbing (water, sewer, gas, waste lines)
No structural changes
Fire sprinklers new
No emergency generator
1)Ceiling 3,840 sq ft
2)Sprinkler 3,840 sq ft
3)Carpet 380 sq yds
4)10' Wall/9'6" Ceiling 1,150 Linear feet
5)Paint Texture 1,150 Linear feet
6)Electrical (Lighting, plug, exit) 3,840 sq ft
7)Data Ports 114 ea
8)New A/C 2 units/ 2 Tstats
9)16 Doors and Hardware 16 ea
10) Demo Equipment/Roof Repair
11)Ceramic Tile 1,200 sq ft
lA. NEW CONSTRUCTION OF FURTURE SPACE
ON ATTACHED MAP (Estimated Cost: $143,040)
Fire sprinklers New
Electric to meet code
Short 6'hallwaywalls
One office, storage closet, and conference room
One 40' x 72' room for future
1) Ceiling 3,840 sq ft
Exhibit A
2)Sprinkler 3,840 sq ft
3)Carpet 430 sq yds
4)10' Wall/9'6" Ceiling 350 Linear feet
Paint Texture 350 Linear feet
6)Electrical (Lighting, plug, exit) 3,840 sq ft
7)Data Ports 10 ea
8)New A/C 2 units/2 Tstats
9)Doors and Hardware 6 ea
10) Demo Equipment/Roof Repair
2. USED SPACE NEEDING REMODELED:
ON ATTACHED MAP (Estimated Cost: $87,397)
Traffic Room
New Traffic Sergeants Office
New Report Room
New Weight room
same as new construction using some existing walls)
1) Ceiling 1,500 sq ft
2) Rearranging Sprinkler 1,500 sq ft
3) Carpet 166 sq yds
4) 10' Wall/9'6" Ceiling 724 Linear feet
un-insulation
5) Paint Texture 724 Linear feet
6) Electrical (Lighting, plug, exit) 1,500 sq ft
7) 10 Data Ports
8) Rearrange A/C 5 ton
9) Move existing A/C from old report room to new report room
10) 6 Doors and Hardware 6 ea
11) Ceramic Tile 250 sq ft
3. OLD SPACE MINOR WORK BASIC /REFURBISH:
ON ATTACHED MAP (Estimated Cost: $19,695)
Change swing of one door
No wall movement
Paint
New carpet
Small amount of ceiling repair
1) Change swing of a door
2) Paint clean up 940 Linear feet
3) New carpet 200 sq ft
4) Ceiling repair 500 sq ft
Exhibit A
4. ~ . - (Estimated Cost: $134,500)
1) Architect or engineer fee (6% of Construction)
2) Sale of Bonds
3) Furniture
4) Move and clean up
5) Testing and balancing
6) Fire alarm security (per code)
City Hall East Police Department Renovations
Expenditures
Construction Estimate $660,814
Contingenty 40 000
Total Project Cost $700,814
Construction Mgmt $ 20,000
Resources
2008 COs $500,000 From Reimbursement Ordinances Approved 3-5-08
2007 COs $ 36,946 From account number 30-454-100120454
2000 COs 163 868 From account number 30-437-300001437
700,814
Construction Mgmt $ 20,000 (Not included in the total project cost)
NOte: Construction management is funded by 2007-08 Facilities Management budget.
Modified 3-10-OS
MONTHLY ExhibFt s
PROJECT REPORT
PROJECT NAME: City Hall East Police Renovation
RESOURCES:
2008 COs $ 500,000.00
2007 COs $ 36,946.00
2000 COs $ 163,868.00
Facilities Management 2007-2008 budget $ 20,000.00
Total $ 720,814.00
BUDGET:
Construction
Administration Cost
Construction Mgmt
Contingency
SCHEDULE/DATE:
Architect
Contract Mgmt
Bid Specs
Permitting
Asbestos
Construction
Plumbing
HVAC/test & balance
Electrical
Data
Fire Protection
Security
Roof
Flooring
Administrative
PROJECT MANAGER: Bruce Henington
Expended to
Prop osed eudeet Bud get to date date Differerice'
526,314.00 526,314.00 j
1 Y34,500.00 134,500.00
20,000.00 20,000.00
1$do';ooo.oo 40,000.00 S -11 -
4 ti Remaininw/Short S i11 I
j~1,. „
CHANGES or CHANGE ORDERS:
1 ~ I I!!
Amount
COMMENTS: ° ° °cx~ ra n n ~ n T. a n li s~i rt~ ~ .tea /~ rk~ aa. ~wi ~
U CGIIl~UU8611~J bVll(~IUIlC9J~l~tiltlll~.tlll6