HomeMy WebLinkAbout23-1686ORDINANCE NO. 23-1686 AN ORDINANCE BY THE CITY OF DENTON AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE AN INTERLOCAL COOPERATION AGREEMENT WITH DENTON COUNTY, TEXAS PROVIDING FOR REIMBURSEMENT FUNDING FOR THE CITY'S BONNIE BRAE PHASE 3 WIDENING AND RECONSTRUCTION PROJECT. IN AN AMOUNT NOT TO EXCEED TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND 00/100 ($2,851,785.00) DOLLARS; AUTHORIZING THE EXPENDITURE OF FUNDS NOT TO EXCEED TWO MILLION EIGHT nUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY- FIVE AND 00/100 ($2,851,785.00) DOLLARS THEREFOR; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the CITY and the COUNTY mutually desire to enter into this Interlocal Cooperation Agreement (ICA), attached hereto as “Exhibit A”, for the purpose of providing the engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening and reconstruction of Bonnie Brae Street between FM1515 and Roselawn Drive, located entirely in the City of Denton municipal limits and Denton County, hereinafter “the Project;” and WHEREAS, on March 17, 2020, the City authorized an Interlocal Cooperation Agreement, Ordinance No. 20-479, between the City of Denton and Denton County for the Bonnie Brae Street Phase 2 – Vintage Boulevard Project in the Not-to-Exceed amount of Five Million Seven Hundred Fifty Thousand and 00/100 ($5,750,000.00) Dollars toward the satisfactory completion of the Project; and upon achieving satisfactory completion and final closeout of said project, Eight Hundred Fifty-One Thousand Seven Hundred Eighty-Five and 00/100 ($851,785.00) Dollars was left remaining unused on the project; and WHEREAS, the City and County agree the unused funds from the Bonnie Brae Street Phase 2 – Vintage Boulevard Project in the Not-to-Exceed amount of Eight Hundred Fifty-One Thousand Seven Hundred Eighty-Five and 00/100 ($851,785.00) Dollars will be used toward the satisfactory completion of the Bonnie Brae Street Phase 3 Widening and Reconstruction Project; and WHEREAS, on November 8, 2022, voters approved the Denton County Transportation Road Improvement Bond Program Package (TRIP 2022), as shown on the attached Exhibit B, which includes project #88; Bonnie Brae Phase 4B Project from 1-35E to the Roundabout at Scripture with a bond contribution in the Not-to-Exceed amount of Seven Million One Hundred Thousand and 00/100 ($7, 100,000.00) Dollars toward the completion of the Project; and WHEREAS, the City’s Bonnie Brae Street Phase 3 Widening and Reconstruction Project construction contract exceeds the City’s remaining budget for the project causing the City to re- allocate the TRIP 2022 bond contribution in the Not-to-Exceed amount of Seven Million One Hundred Thousand and 00/100 ($7,100,000.00) Dollars from the Bonnie Brae Phase 4B project to Bonnie Brae Phase 3; and + • - . . f _ r I P n • - - - ' ' - - b J - ? • • I t q + re S a e ! • T t g H 7 a J r r ; H & • F Hb n - ' : b - ' - X 7 + - ' - ' - - tq fp - ' ' + ' . - F J = =+ • 1 4 a G / r : T • n : H • } a n = n } h & q I \ / I J L UP - : , i • hr I H •= r + th I ' ' aP b +F :’ ( • ! : P ! aI • rI : r ,• I + • B He + / { •.'\ 1= ' 1 P {I I r 1 I F + + I a 1 d + P : P r 1 • h g + r P n : f r• i F 1 a • t H H Hr r + n J r r • a • \ + F P r b + q I• b • h a 1 H 1 : 4q P a P . ; d. ' +: # 1 d I F • q r • H H r • • g gF = B 1 Fr n g H H F ; r B H + + 1 • q r \ J h • n • \ • r F • L b n 1 H F : • • P I r ,,' ; . - ’: ..:' - , .: i - -- . . . . - b \ P r I • WHEREAS, the estimated total cost of completion for the Project is FORTY MILLION THREE HUNDRED EIGHTEEN THOUSAND EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00); and WHEREAS, the County’s initial contribution toward satisfactory completion of the Project, based on current available funding, shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project; and WHEREAS, the City agrees to manage all engineering, right-of-way acquisition, utility relocations, inspections, and construction required for completion and maintenance of the Project. The City also agrees to provide the County with all invoices and requested documentation in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,85 1,785.00); and WHEREAS, The County will reimburse the City upon submittal of all invoices and requested documentation related to the Project; and WHEREAS, the City Council finds it in the public interest to authorize the City Manager, to execute the ICA for the project; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The findings and recitations contained in the preamble of this ordinance are incorporated herein by reference as true and as if fully set forth in the body of this ordinance. SECTION 2. The City Manager of the City of Denton, or designee, is hereby authorized to execute on behalf of the City, the Interlocal Cooperation Agreement (“ICA”), a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes. SECTION 3. The City Manager, or designee, is hereby authorized to expend funds in an amount not to exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,85 1 ,785.00). SECTION 4. The City Manager is further authorized to carry out all duties and agreements to be performed by the City under the ICA. SECTION 5. The City Manager, or designee, is the City’s designated, authorized official, with the power to authorize, accept, reject, alter or terminate the ICA on behalf of the City and act on behalf of the City of Denton in all matters related to the ICA and any subsequent agreements that may result. SECTION 6. This Ordinance shall become effective immediately upon its passage and approval. The motion to approve this Ordinance was seconded by 6 r\ A'\ Ball the following vote a m,d, by a._\ CAt\h,r m ' This Ordinance was passed and approved by *'1 Nay Abstain Absent Mayor Gerard Hudspeth: Vicki Byrd, District 1 : Brian Beck. District 2: Paul Meltzer. District 3 : Joe Holland. District 4: Brandon Chase McGee, At Large Place 5 : Chris Watts, At Large Place 6: 1/ / ,/’ V’I / PASSED AND APPROVED this the lqy'day of SteAM.b,J _, 2023. dKiTFAmMb ATTEST: JESUS SALAZ L\\\\\111111 APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY a$dHWT3ayA ff B:===BEe=TBY: St:-mfl Bonnie Brae Phase 3 – i)enroll Could}’ !uteri,)cal Cooperaiion Agreenrent – TRiP 2022 Initial Funding C'ontrlburial I + t. ) : : • Jr EXHIBIT A THE STATE OF TEXAS § § COUNTY OF DENTON § INTERLOCAL COOPERATION AGREEMENT BETWEEN DENTON COUNTY, TEXAS, AND THE CITY OF DENTON, TEXAS THIS AGREEMENT is made, entered into and executed by and between Denton County, Texas, a duly organized political subdivision of the State of Texas, hereinafter “the County”; and the City of Denton, Texas, a duly organized municipality, hereinafter “the City.” The County and the City are collectively referred to herein as “the Parties.” WHEREAS, the County and the City mutually desire to enter into this Agreement for the purpose of providing the engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, located entirely in the City of Denton municipal limits and Denton County Commissioner Precinct #4, hereinafter “the Project;” and WHEREAS, the estimated cost of completion for the Project is FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00), with the initial County contribution toward satisfactory completion of the Project, based on current available funding, which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project, and WHEREAS, the Interlocal Cooperation Act, Texas Government Code Chapter 791, hereinafter “the Act,” provides authorization for a local government to contract with one or more local governments to perform governmental functions and services under the terms of the Act, and the County and the City hereby mutually agree to be subject to the provisions of the Act; and WHEREAS, the County and the City value the timely completion of the Project which involves roads which are an integral part of the County’s road system, and the Parties are undertaking the Project to facilitate safe travel on an improved roadway; and NOW, THEREFORE, this Agreement is hereby made and entered into by the County and the City upon and for the mutual consideration stated herein: ICA, CRy of Denton – Bonnie Brae Phase 3 Page 1 of 7 WITNESSETH: I Pursuant to Texas Government Code §79 1.011, the County and the City hereby enter into this Agreement in order to perform certain governmental functions and services in the area of streets, roads, and drainage. The purpose of this Agreement is to provide a governmental function or service that each party is authorized to perform individually. 11 The County and the City hereby agree that the scope of the Project shall consist of engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, at an estimated cost of FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00), whereby the County agrees to make an initial contribution toward satisfactory completion of the Project, based on current available funding, which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project. The Project is located entirely within the municipal limits of the City of Denton and Denton County Commissioner Precinct #4. 111 The County hereby agrees to make an initial contribution toward satisfactory completion of the project in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), provided that any and all funding is approved by formal action of the Denton County Commissioners Court. IV The City agrees to manage all engineering, right-of-way acquisition, utility relocations, inspections, and construction required for completion and maintenance of the Project. The City shall timely provide the County with all invoices and requested documentation in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00). ICA, City of Denton – Bonnie Brae Phase 3 Page 2 of 7 V This exchange of in-kind services between the County and the City is deemed adequate consideration for the obligations exchanged by the Parties herein. VI As the City proceeds with the completion of the Project, the City shall submit all invoices for reimbursement to the Denton County Auditor, Mr. Jeff May, 1 Courthouse Drive, Suite 2000, Denton, Texas 76208, c/o Mr. John Polster, Innovative Transportation Solutions, Inc., 2701 Valley View Lane, Farmers Branch, Texas 75234. The City shall submit invoices on a monthly basis, and the County shall reimburse the City on a pro rata basis for all approved expenses related to the Project within thirty calendar days of receipt of an invoice from the City, provided that all expenditures are made in a manner which is consistent with the terms of this Agreement. Upon satisfactory completion of the Project, the County and the City shall prepare and complete a full audit of the Project . VII As required by Texas Transportation Code §25 1 .012 and as evidenced by the signature of the City’s representative below, the governing body of the City by the execution of and approval of this Agreement hereby approves of the expenditure of County money to finance the construction, improvement, maintenance, or repair of a street or alley in the County that is located in the City. VIII This agreement may be terminated in whole, or in part, by the County or the City upon thirty days written notice to the other party. In the event of termination by the County, the County shall pay all approved invoices submitted up to and including the date of termination. IX This Agreement represents the entire integrated agreement between the County and the City and supersedes all prior negotiations, representations, and agreements, either oral or written. This Agreement may be amended only by written instrument signed by both of the Parties. Notices shall be directed as follows: For City:Honorable Gerard Hudspeth, Mayor City of Denton, Texas 215 East McKinney Street Denton, Texas 76201 ICA. City of Denton – Bonnie Brae Phase 3 Page 3 of 7 Copy To:Jesus Salazar, City Secretary City of Denton, Texas 215 East McKinney Street Denton, Texas 76201 For County:Honorable Andy Eads, Denton County Judge 1 Courthouse Drive, Suite 3100 Denton, Texas 76208 andy .eads@dentoncounty .corn holly .sadlowski@dentoncounty .com Copy To:Denton County District Attorney’s Office - Civil Division 1450 East McKinney Street, Suite 3 100 Denton, Texas 76209 john.feldt@,dentoncounty .gov cio@,dentoncount)' .gov X The covenants, terms, and conditions herein are to be construed under the laws of the State of Texas and are performable by the Parties in Denton County, Texas. The Parties mutually agree that venue for any obligation arising from this Agreement shall lie in Denton County, Texas. XI The City agrees and understands that the City, its employees, servants, agents or representatives shall at no time represent themselves to be employees, servants, agents or representatives of the County. XII. The City agrees to accept full responsibility for the acts, negligence and omissions of all City employees, agents, subcontractors or contract laborers and for all other persons doing work under a contract or agreement with the City. XIII. This Agreement is not intended to extend the liability of the Parties beyond that provided for by law. Neither the County nor the City waive, nor shall be deemed to have hereby waived, any immunity or defense that would otherwise be available to it against claims made by third padres. XIV. In the event that any portion of this Agreement shall be found to be contrary to law, it is the intent of the Parties hereto that the remaining portions shall remain valid and in full force and effect to the fullest extent possible. ICA, City of Denton – Bonnie Brae Phase 3 Page 4 of 7 XV The undersigned officers or agents of the Parties hereto are the properly authorized officials and have the necessary authority to execute this Agreement on behalf of the Parties hereto, and each party hereby certifies to the other that any necessary resolutions extending said authority have been duly passed and are now in full force and effect. XVI. This Agreement becomes effective when signed by the last party whose signing makes the respective agreement fully executed, and the term of this Agreement is for the life of the Project beginning on the date of execution of this Agreement and continuing until the Project is completed. Executed this day of , 2023. DENTON COUNTY, TEXAS 1 Courthouse Drive, Suite 3 100 Denton, Texas 76209 CITY OF DENTON, TEXAS 601 East Hickory Street Denton, Texas 76205 By: Honorable Andy Eads Denton County Judge Acting by and on behalf of the authority of the Denton County Commissioners Court By By m Honorable Gerard Hudspeth Mayor of the City of Denton, Texas Acting by and on behalf of the authority of the City of Denton, Texas ATTEST:ATTEST: By: Denton County Clerk ICA, City of Denton – Bonnie Brae Phase 3 Page 5 of 7 COUNTY AUDITOR’S CERTIFICATE I hereby certify funds are available to accomplish and pay the obligation of Denton County, Texas, under this Agreement. Denton County Auditor ICA, City of Denton – Bonnie Brae Phase 3 Page 6 of 7 APPROVAL OF INTERLOC AL COOPERATION AGREEMENT Denton County, Texas, acting by and through the Denton County Commissioners Court, hereby gives its specific written approval to the following Project, prior to beginning of the Project in satisfaction of Texas Government Code §791.014. The scope of the Project shall consist of engineering, right-of-way acquisition, utility relocations, inspections, and construction for widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, with an estimated cost of completion of FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00). The Project shall be located entirely within the municipal limits of the City of Denton and Denton County Commissioner Precinct #4. The County hereby agrees to make an initial contribution toward satisfactory completion of the project in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00) provided that any and all funding is approved by formal action of the Denton County Commissioners Court. The local governments which requested the Project and with whom the Agreement is by and between are Denton County, Texas, and the City of Denton, Texas. By vote on the date below, the Denton County Commissioners Court has approved the project identified above and authorized execution of this document by the presiding officer of the Denton County Commissioners Court. Date : By: Presiding Officer of the Denton County Commissioners Court ICA. City of Denton – Bonnie Brae Phase 3 Page 7 of 7 .C 1g 8 ! W JgPi lg ISi Ii g t E > g ) B in ! ! ! 6 8 LA 2 1: a g I aa g b ! Jla g k e g i 2a g g IP +ve : 3 8e ;; 23 IIE ! } { g E all !!2 is 9 IS B -E ii E g g lg g ! !! i Iii !!! iIi) :3 ] i ]: ;3 g jb ! 2b i gg SgI j':1:aa = 1}; } i 5 i 'i J b Eu ! !!! El a aLl JEj 8 B li i } g g Jg g J:C g11 I & g rl i a i ;a 'b I ! q: ? g A ig liII. gg Eglab ! ! ;! i e & g : • Eg !S j gi gIRI gIg{1{liliEl : 1 : IF gM®MgTmTgilitgl£l i lglglil g Ii+1619'l 'n 1+1.dIa’I qi ;i g 11 a3 8 hi B 8 g ed Bg g , 1!iII 88 ! id: gigI I i gilg i Be13XI g !!giliE:==iI nEC I FI U'i g g i; iii= g.J 83 B6121 bIz 1 in }}:if g ,S ! 8 go g E .e a £ = ge -i He iiiu 1 S gig! gIgI iIE IiI:Ii E g gij Is i igiI IT: 8 : r£ 7) gIg $9 i ;1 g 18 18 g ] ; : ! g Jg iiiT jn IX idig!= a 3 5 a B 88 gLt E g 8 gll ; Ii EEIS& SId! I} : IE B i gIgIl gIgI jl:hI hI hI b 1IiI!! 3l5l5l31 : 13l5l31 , gIll :III ] Itlg III !1i 1 B 1 B 1 :i 1 B 1 1j 1 ) 1 j E i iII818 € 1 : ; IiI :SI _sI Ii 1 : n INtl in 1 n I fBI n ; 1 g 1 e 1 :i R Iii ! ! Td$ gg lg g g L g : ; UP { { {}g= gig g ;1 &i gIgI 1818181818 gIgI jg]E:l::Ii:lg dIgI I${1£jdjgl;i g 8 il§lilililgIgI i''I'”IT-IV'jq-ji'jq-I ~. i ni g g pHi g g g ig TggTTTgTgTg g: lglgjg]g:jg]g]g:lglg}}; ljlgl£lgl£ljlglgl€dtgtttgRLdglaRiij gfF;g g g lga I ig ! -IR IEe InIzIIB j El iS ! ! { {Be ! 1I UJ8 {}{ {}{} ii.{jg el aa lg i g i a g ! i ::a : 1 le $${ 1 ;1iI: ;ii I Ii!!!!!i IM ! !=:1 t: gIg lg€ I;@ L• : E E •: ! ii; tS:leg g g j 9 gI HD Ej: ;1; 1 ; !!iI,g ! l§l g B- il ;C BS tB .S 1} ii gE lili ia : gIg gIS 83 83 Iii Il@ C a g :I g lg gl:i igl: ggl§l;I!!!!II bE EII li IS ! lg ; .Ii ;lg! 1{ : T:gg 5 E i BIggl:1 1: g;;;!!:q a :S , Ii C } 6 } i i ; Ii : g !i g=g a C)8 I B !:IE;}ligig;ii E iiI;g]gJ4gg i ;li S !) : Eg S 5 !gI iII; €1 bE g 1 = 1 : 1:1 !IiI !g :B ! 8 1: : 1 IB a E 91 :IE [ ? a gjjgggl§ jg 1!1; 3 Bi IP FFFFFIBr•TanTnTa le [@ HI gIRl 81 Bl gIRl BI BIg bl 8 1 B 1 8 a: laI a 8:1:1:1:11IiI:1:1:1 !1II II II la ORDINANCE NO. 23-1686 AN ORDINANCE BY THE CITY OF DENTON AUTHORIZING THE CITY MANAGER, OR DESIGNEE, TO EXECUTE AN INTERLOCAL COOPERATION AGREEMENT WITH DENTON COUNTY, TEXAS PROVIDING FOR REIMBURSEMENT FUNDING FOR THE CITY'S BONNIE BRAE PHASE 3 WIDENING AND RECONSTRUCTION PROJECT, IN AN AMOUNT NOT TO EXCEED TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND 00/100 ($2,851,785.00) DOLLARS; AUTHORIZING THE EXPENDITURE OF FUNDS NOT TO EXCEED TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY- FIVE AND 00/100 ($2,851,785.00) DOLLARS THEREFOR; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the CITY and the COUNTY mutually desire to enter into this lnterlocal Cooperation Agreement (ICA), attached hereto as "Exhibit A", for the purpose of providing the engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening and reconstruction of Bonnie Brae Street between FM 1515 and Rose lawn Drive, located entirely in the City of Denton municipal limits and Denton County, hereinafter "the Project;" and WHEREAS, on March 17, 2020, the City authorized an Interlocal Cooperation Agreement, Ordinance No. 20-4 79, between the City of Denton and Denton County for the Bonnie Brae Street Phase 2 -Vintage Boulevard Project in the Not-to-Exceed amount of Five Million Seven Hundred Fifty Thousand and 00/100 ($5,750,000.00) Dollars toward the satisfactory completion of the Project; and upon achieving satisfactory completion and final closeout of said project, Eight Hundred Fifty-One Thousand Seven Hundred Eighty-Five and 00/100 ($851,785.00) Dollars was left remaining unused on the project; and WHEREAS, the City and County agree the unused funds from the Bonnie Brae Street Phase 2 -Vintage Boulevard Project in the Not-to-Exceed amount of Eight Hundred Fifty-One Thousand Seven Hundred Eighty-Five and 00/100 ($851,785.00) Dollars will be used toward the satisfactory completion of the Bonnie Brae Street Phase 3 Widening and Reconstruction Project; and WHEREAS, on November 8, 2022, voters approved the Denton County Transportation Road Improvement Bond Program Package (TRIP 2022), as shown on the attached Exhibit B, which includes project #88; Bonnie Brae Phase 4B Project from I-35E to the Roundabout at Scripture with a bond contribution in the Not-to-Exceed amount of Seven Million One Hundred Thousand and 00/100 ($7,100,000.00) Dollars toward the completion of the Project; and WHEREAS, the City's Bonnie Brae Street Phase 3 Widening and Reconstruction Project construction contract exceeds the City's remaining budget for the project causing the City to re- allocate the TRIP 2022 bond contribution in the Not-to-Exceed amount of Seven Million One Hundred Thousand and 00/100 ($7,100,000.00) Dollars from the Bonnie Brae Phase 4B project to Bonnie Brae Phase 3; and WHEREAS, the estimated total cost of completion for the Project is FORTY MILLION THREE HUNDRED EIGHTEEN THOUSAND EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00); and WHEREAS, the County's initial contribution toward satisfactory completion of the Project, based on current available funding, shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project; and WHEREAS, the City agrees to manage all engineering, right-of-way acquisition, utility relocations, inspections, and construction required for completion and maintenance of the Project. The City also agrees to provide the County with all invoices and requested documentation in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00); and WHEREAS, The County will reimburse the City upon submittal of all invoices and requested documentation related to the Project; and WHEREAS, the City Council finds it in the public interest to authorize the City Manager, to execute the ICA for the project; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The findings and recitations contained in the preamble of this ordinance are incorporated herein by reference as true and as if fully set forth in the body of this ordinance. SECTION 2. The City Manager of the City of Denton, or designee, is hereby authorized to execute on behalf of the City, the Interlocal Cooperation Agreement ("ICA"), a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes. SECTION 3. The City Manager, or designee, is hereby authorized to expend funds in an amount not to exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851 ,785.00). SECTION 4. The City Manager is further authorized to carry out all duties and agreements to be performed by the City under the ICA. SECTION 5. The City Manager, or designee, is the City's designated, authorized official, with the power to authorize, accept, reject, alter or terminate the ICA on behalf of the City and act on behalf of the City of Denton in all matters related to the ICA and any subsequent agreements that may result. SECTION 6. This Ordinance shall become effective immediately upon its passage and approval. The motion to approve this Ordinance was made by r~..., \ t'\t.\t1-c.l and seconded by 6 r, "'""' $t:L.k.. . This Ordinance was passed and approved by the following vote ~-~: Nay Abstain Mayor Gerard Hudspeth: Aye J Absent Vicki Byrd, District 1: Brian Beck, District 2: Paul Meltzer, District 3: Joe Holland, District 4: Brandon Chase McGee, At Large Place 5: Chris Watts, At Large Place 6: PASSED AND APPROVED this the l ~ t-, day of S r~~c.~kcJ , 2023. ATTEST: JESU ~TY SECRETARY BY: ~~ ~~--- APPROVED AS TO LEGAL FORM: MACK REINWAND, CITY ATTORNEY BY: ___ ., __ ~----=---... _____ ,....,_ ------------------- I' . j-lnt<'il atfub ~R utn I THE STATE OF TEXAS § § COUNTY OF DENTON § EXHIBIT A INTERLOCAL COOPERATION AGREEMENT BETWEEN DENTON COUNTY, TEXAS, AND THE CITY OF DENTON, TEXAS THIS AGREEMENT is made, entered into and executed by and between Denton County, Texas, a duly organized political subdivision of the State of Texas, hereinafter "the County"; and the City of Denton, Texas, a duly organized municipality, hereinafter "the City." The County and the City are collectively referred to herein as "the Parties." WHEREAS, the County and the City mutually desire to enter into this Agreement for the purpose of providing the engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, located entirely in the City of Denton municipal limits and Denton County Commissioner Precinct #4, hereinafter "the Project;" and WHEREAS, the estimated cost of completion for the Project is FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/I 00 DOLLARS ($40,318,845.00), with the initial County contribution toward satisfactory completion of the Project, based on current available funding, which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project, and WHEREAS, the Interlocal Cooperation Act, Texas Government Code Chapter 791, hereinafter "the Act," provides authorization for a local government to contract with one or more local governments to perform governmental functions and services under the terms of the Act, and the County and the City hereby mutually agree to be subject to the provisions of the Act; and WHEREAS, the County and the City value the timely completion of the Project which involves roads which are an integral part of the County's road system, and the Parties are undertaking the Project to facilitate safe travel on an improved roadway; and NOW, THEREFORE, this Agreement is hereby made and entered into by the County and the City upon and for the mutual consideration stated herein: !CA, City of Denton -Bonnie Brae Phase 3 Page 1 of7 WITNESSETH: I. Pursuant to Texas Government Code § 791 .011, the County and the City hereby enter into this Agreement in order to perform certain governmental functions and services in the area of streets, roads, and drainage. The purpose of this Agreement is to provide a governmental function or service that each party is authorized to perform individually. II. The County and the City hereby agree that the scope of the Project shall consist of engineering, right-of-way acquisition, utility relocations, inspections, and construction for the widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, at an estimated cost of FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00), whereby the County agrees to make an initial contribution toward satisfactory completion of the Project, based on current available funding, which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851 ,785.00), but upon issuance of additional bond funds, this Agreement is intended to be amended at a future date to increase the County commitment toward satisfactory completion of the Project. The Project is located entirely within the municipal limits of the City of Denton and Denton County Commissioner Precinct #4. III. The County hereby agrees to make an initial contribution toward satisfactory completion of the project in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851,785.00), provided that any and all funding is approved by formal action of the Denton County Commissioners Court. IV. The City agrees to manage all engineering, right-of-way acquisition, utility relocations, inspections, and construction required for completion and maintenance of the Project. The City shall timely provide the County with all invoices and requested documentation in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY-ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2,851 ,785.00). ICA, City of Denton -Bonnie Brae Phase 3 Page 2 of7 V. This exchange of in-kind services between the County and the City is deemed adequate consideration for the obligations exchanged by the Parties herein. VI. As the City proceeds with the completion of the Project, the City shall submit all invoices for reimbursement to the Denton County Auditor, Mr. Jeff May, 1 Courthouse Drive, Suite 2000, Denton, Texas 76208, c/o Mr. John Polster, Innovative Transportation Solutions, Inc., 2701 Valley View Lane, Farmers Branch, Texas 75234. The City shall submit invoices on a monthly basis, and the County shall reimburse the City on a pro rata basis for all approved expenses related to the Project within thirty calendar days of receipt of an invoice from the City, provided that all expenditures are made in a manner which is consistent with the terms of this Agreement. Upon satisfactory completion of the Project, the County and the City shall prepare and complete a full audit of the Project. VII. As required by Texas Transportation Code §251.012 and as evidenced by the signature of the City's representative below, the governing body of the City by the execution of and approval of this Agreement hereby approves of the expenditure of County money to finance the construction, improvement, maintenance, or repair of a street or alley in the County that is located in the City. VIII. This agreement may be terminated in whole, or in part, by the County or the City upon thirty days written notice to the other party. In the event of termination by the County, the County shall pay all approved invoices submitted up to and including the date of termination. IX. This Agreement represents the entire integrated agreement between the County and the City and supersedes all prior negotiations, representations, and agreements, either oral or written. This Agreement may be amended only by written instrument signed by both of the Parties. Notices shall be directed as follows: For City: Honorable Gerard Hudspeth, Mayor City of Denton, Texas 215 East McKinney Street Denton, Texas 76201 ICA, City of Denton -Bonnie Brae Phase 3 Page 3 of7 Copy To: For County: Copy To: Jesus Salazar, City Secretary City of Denton, Texas 215 East McKinney Street Denton, Texas 7620 l Honorable Andy Eads, Denton County Judge 1 Courthouse Drive, Suite 3100 Denton, Texas 76208 andy.eads@dentoncounty.com holly.sadlowski@dentoncounty.com Denton County District Attorney's Office~ Civil Division 1450 East McKinney Street, Suite 3100 Denton, Texas 76209 john.feldt@dentoncounty.gov cio@dentoncounty.gov X. The covenants, terms, and conditions herein are to be construed under the laws of the State of Texas and are performable by the Parties in Denton County, Texas. The Parties mutually agree that venue for any obligation arising from this Agreement shall lie in Denton County, Texas. XI. The City agrees and understands that the City, its employees, servants, agents or representatives shall at no time represent themselves to be employees, servants, agents or representatives of the County. XII. The City agrees to accept full responsibility for the acts, negligence and omissions of all City employees, agents, subcontractors or contract laborers and for all other persons doing work under a contract or agreement with the City. XIII. This Agreement is not intended to extend the liability of the Parties beyond that provided for by law. Neither the County nor the City waive, nor shall be deemed to have hereby waived, any immunity or defense that would otherwise be available to it against claims made by third parties. XIV. In the event that any portion of this Agreement shall be found to be contrary to law, it is the intent of the Parties hereto that the remaining portions shall remain valid and in full force and effect to the fullest extent possible. !CA, City of Denton -Bonnie Brae Phase 3 Page 4 of7 xv. • The undersigned officers or agents of the Parties hereto are the properly authorized officials and have the necessary authority to execute this Agreement on behalf of the Parties hereto, and each party hereby certifies to the other that any necessary resolutions extending said authority have been duly passed and are now in full force and effect. XVI. This Agreement becomes effective when signed by the last party whose signing makes the respective agreement fully executed, and the term of this Agreement is for the life of the Project beginning on the date of execution of this Agreement and continuing until the Project is completed. Executed this JJ\~'( DENTON COUNTY, TEXAS 1 Courthouse Drive, Suite 3100 ICA, City of Denton -Bonnie Brae Phase 3 , 2023. CITY OF DENTON, TEXAS 601 East Hickory Street Denton, Texas 76205 Honorable Gerard Hudspeth Mayor of the City of Denton, Texas Acting by and on behalf of the authority of the City of Denton, Texas Page 5 of7 Sundt Pay Applications & Proof of Payment (pages 16-226) COUNTY AUDITOR'S CERTIFICATE I hereby certify funds are available to accomplish and pay the obligation of Denton County, Texas, under this Agreement. ditor !CA, City of Denton -Bonnie Brae Phase 3 Page 6 of7 APPROVAL OF INTERLOCAL COOPERATION AGREEMENT Denton County, Texas, acting by and through the Denton County Commissioners Court, hereby gives its specific written approval to the following Project, prior to beginning of the Project in satisfaction of Texas Government Code §791.014. The scope of the Project shall consist of engineering, right-of-way acquisition, utility relocations, inspections, and construction .for widening of Bonnie Brae Street as a four-lane divided roadway between Roselawn Drive and FM 1515, with an estimated cost of completion of FORTY MILLION THREE HUNDRED EIGHTEEN EIGHT HUNDRED FORTY-FIVE AND NO/100 DOLLARS ($40,318,845.00). The Project shall be located entirely within the municipal limits of the City of Denton and Denton County Commissioner Precinct #4. The County hereby agrees to make an initial contribution toward satisfactory completion of the project in an amount which shall not exceed TWO MILLION EIGHT HUNDRED FIFTY- ONE THOUSAND SEVEN HUNDRED EIGHTY-FIVE AND NO/100 DOLLARS ($2 ,85 1,785.00) provided that any and all funding is approved by formal action of the Denton County Commissioners Court. The local governments which requested the Project and with whom the Agreement is by and between are Denton County, Texas, and the City of Denton, Texas. By vote on the date below, the Denton County Commissioners Court has approved the project identified above and authorized execution of this document by the presiding officer of the Denton County Commissioners Court. By: ____ ----1'---IFl'-""C#--..::...::::____;;: ___ _ Presiding Officer of e e ton County Commissioners Court !CA, City of Denton -BoMie Brae Phase 3 Page 7 of7 ,. u u .. 1S 16 " ,. ,. 20 21 22 " 2S 26 27 29 30 ., ,, ., 34 35 35 Denton County DentonCoun Denton County Oentan County Denton County Denton County OentMCOunt Den1on CO\lnty Dentcn Coun Aubrey Ci!Una CrcuRoads Cross Roads Cr1:1nRoad1 Denton Krugerville Ktugervflle Kill e.rwlle fM 1171We5t I•35WFronta1eMo.tas FM1515 FM1173 FM2931 FM Jl&S US3nNorth Outer Loo FM 1385/Gee Road Stn1tl!' Prn ectl frontier Pkwy.; Ike Byram Rd; From ►.35 to IH :ISW Ffgrn lt-1 !5 to US 380 E.st from l-35W 10 West of FM 156 from FM 1171 tti FM 407 hOffl Masch flnndl. Road to Bonnie B™!!st. F1om l-35EtoFM !.s& Fu;,m US 380 to FM 423 Frcm US 380 to FM .4SS From US 380 to Proposed Outer Loop Fre>ml•lStoOHT/C&.tn, line us 380 to FM 1m NA M<H.llt; Redfearn Rd.; &lac.k,itl Rd.; Various Rodhil Rd.; Ma1oolia Rd. Parvln/Frontlll!r Reid NtwHopll! Or. Gllffin Ro.ad Poue.r Silc:p Rold-North Fhht,-. Ro.id-East Ry.in Road P•rither Creek Parkway; Fields FM 1385'10L a Hom Sridle Rld&e Ranch R~ to fish Tr,.11R1:1,10 From New Ho e Road to US 3n From US 377 to US 380 from FM 414 to Or SaAd..-1, lllo,ad horn FM 2181 to FM 1830 Pkwv.; Lebanon Rd.; Kina Rd.; Virlous Le11cy: w. Fields Pkwy.; Stonebrook Pkwy.;Teel Pkwy,; lqacy Dr. lke8yrom Road New North/South Roadway lke B romltl»d SlJ? FrOITI Stew;irt Roid north to end of indtntritl rt ratUSl71 Lakewood Vllqe Eldorado Partway Within town lirnlts 1.itthc Elm Uttie£1m 1.ltUeElm Oak Point oak.Paint Oak Point Pllt;ilf'olnl Prns t!:r Providence VIiiage Providence Vllase H[UL;me MES Fload Connector M1lnSt1eetTr1fficSI ,..al OMI. Gr'O"e Parkway Extension tOylOl'/V.ichtOub Fload R!!habllitation McCormick Road Reh;;abilJtation Traffic Control Mart.op/FM no V.wlou1 Aoid5 on T • Pl.In hrtl rot1til!r ~o•d Liberty Rd mafnt~ance/thorouplfare plan Oak Grove F'Jrlcway to Oiclson Lane FM 720to Ry•n SpritiS Pkwy. Main St-'ldotado Pl US 380 to F[Shlrap Ro11d From Martop Rd to North Corinthians YathtOub 'rachtdub Rd.to FM 720 lnteructlon of FM 720 & Manop Road Various FM1l&'!i!olo!! I Hwy 3n to FM 2931 US 380 to liberty Rd O.ik Grove Rd to Brewer Rd EXHIBIT B Construct new 4-to 6-lane divided Conslruc;:1 'tloilnous Front,1 .o! Roads Widen and reconstruct to & lane divide urban factity Widen from 2-lane rural to 6-I,me urban (interim 4 lanes) Wlden from 2-lane rur1.t to 6-lane urban Re,Ollstruct and widen 2-lane undivided rural roadway to (rJane divided ufbtln arterial with raised median Conmua: 6-l.1ne controlled 1Ccen freeway Comvuct &-lane divided Urban Roadway St~t, 1cfuncun totp, ed..t. Reconstruct/upgrade wrdlln to 6-lanl!!s concrete Rc-construct1on•6(X)Qfeet Jl«o11Uruct1on • 3900 h:H ReCOl'IUr\Jrtion • 1200 hit fl•c.onctr~Jon -3900 Hol!t PIIECINCT1 W'>dt:n 11nd reconstruct to 3 lilnes and add sidC"Walks, l1&htinL and minor dt1ina1e UTlprovemenh Widen existlngfconstruct new loatlon Widening of road and .idd turn lane on Ike Byrom Road Creite Nt:Wth/South roadway from Stewart Ro.id North within lndui:triJI dev~o me11t Si I Installation lh Byr1:1m/ H 377 .iddlng turn Janes, sidewalks, stana1e, and a gateway fHture Rec,oMtr\Jct ellistin& roadway to provide 2-lane dMded e101.1•1ecd1J11 with underground drain11e system, enh1111c@d landsca In ,nd sldew;ilks. Conrnuct4-lane divided thoroughbre, sidewalks, and itreetH tlf\, lntld nef Ro!!<Unit1uc1 t:llf~ ro,ai:tway to provide 4--tane divided ao»-ittllon with r•1n-d median and 25' wide travel lanes Mvlch exIstm1 pavmt Concrete stab~zatfon, reconstruct HMAC surface and add pedestm1n racilltles; OWlr'l\ilte t4.2JS Im-Hr fee Mulch existing pavina. Concrete st•blllzation with HMAC lUJ!Jte; Approx[mately 4,800 llneu feet Traffk Control SipJ\ at FM 720 & Man:op Road Vulo1u 'Mde-11 flam H1ne to &-Un~ dfvldcd utba.n Recorutuct and Widen Reconstruct and Widen Reconstruct and Widen $106,000,000 s:1~.ooo.an $38,470,000 $-18,121,571 $96,500,000 $132.000.000 $115,000,000 $256,000,0IXI $18,000,000 $2S.llOQ,oo:J $20,000,000 !J,000,DOO $3,874,000 Sl,489,000 SJ:.941,,000 $10,449,959 $88,050,(XX) $1,000,000 $1,200.000 $1.000,axl $6,000,000 $5,234,000 $5,244,000 S594,ooo $5,825,000 $5,100.000 $1,600,000 $600,000 SSl.(XIOOOO $1,000,000 $1,500,000 $2,950,000 $10,000,000 ~15 000,000 55,449,'59 ssoo,ooo $600,000 s.soo.ooo $3,000,000 $2,912,500 S2,'!i50,000 $800,000 $300,000 $1S 000 $500,000 $7SO,OOO $1,475,000 $I.IXIOJJDO JIOW AFA, ponlble Ps&E, ;and Harmonson Road connection ($SOOK for Harmonson Road <ORMetlo,. Loe.al contribution to construction $2,Rl),DOD PS&E and ROW AfA ,500,0)0 PS&£~ ~loalnn~for ROW $4.0Q\ODO lndudt Ps&E ,1mount .and possibly additional funds $7,lOD,OOD lndllde Ps&E amount and DHib 1ddruoni1I flJnds $a,ODD,ODO lnciude PS&E amount and ROW AfA local match rnnt.J rulllftl for S,hematlc and t:nvtronmental Oearance $.S.alt.oaD ~1nvert ~ :•::=· Removed 1385 from Gee Road to us 330 Off Sy.t.t,:-m County SlO,Cll0,000 COuntyw111 P1rtjdpi,te on these anticipated projects at a rate ofup to 50% per pfOJKI no! to exceed $10,000,000 Participation°" crou Roads Projects may devtate from partidpallon polkles due to the k ,SCXI.DOD economic impacts auociated with thr wIdenln1 of US 380 to a fTol!eWilV, TxOOT needs au is Olla! to dose out 380 Feasibility. S.u.aio.oi» County wrn p;irtlclpite on these anticipated projecls ill ii rate of up to 50% per project no! to Vlltf.i!d $15,000,000 $!50D,000 - The Town of L•kewood VIiiage Is widening Eldorado Pukway from Garra lane to the Little Elm town llmits •nd adding turn lanes, sldewalk$, slgn,1ge, and a 11teway feature ;it town expen5e. Enalneerlng ~ design Is wmently underwiy. tn pirlner5hip wllh the Town, UtUe Elm ISO $J.000.0DO wil contribute to sI1nallnUon, school zone, and sidewalk construction. The Town's (OJ)structlon will allow for the exJnlnc center median 10 be widened, elevated, ll1hted and IJirM:iw;ipe!i tT¥ ~nton County. V11rlous repairs to the roadway will also be required and can be accomplished concurrently. $5,2M.OOG Priority #1 Hnl Lane 1, the boundary between precincts t & 2 and half is in eadi. $S,J44)XID Priority #3 Costs Include atilional wor'I; th;iit Is C\lrrentty lil"Jw.:Jed by Spirit.a, flanch Dew:I et ll'rlotil 14 $2',fll.500 ll'rlor/ty #5 $2,550.DDD Priority #1 $a.OOO Priority 112 $JDOJXID Priorit, #3 ll'llol Pouit 1wa hstol r!Hd~ lh•l •U" ,m oftheT·Pltn $1,m,OOO ., .. .,.., Ma:rionRcm;i E. Chapman Dr. to Lois Rd. Ftom Belz Rd-1-35 Service Rd/Metz Rd., .. sanaer Belz Road/Jennifer Cfrcle Jennifer Clrcle--Belz Rd. End of OJI-de- sK.. ~e location mtp. •• Denton county Outer loop From 1-35 to ONT/County line .. Oenton CounN Strar!llcProer:u .... ., C•uoUtcm He:txcin PiirlWa"" Hamiltoo OR to SH 121 ., Curt111ton Ht!b'Cm P.airtw,1y S,ti 121 to Old ~ton Rd ., curol'ton Hebron P¥kwav Old Denton lld 10 Jo:1~ Ln .. Cluollton HtbronPartww los~ lt'l 1D Mudow Or 45 2 Curort-on Frankford Road Bridgl'! tu Furne;au)( Creek west of Josey Lane .. Qfrallton FUni:lcird Road Commodore Or to Ek.anhow.r St ., C.1rroll1ewt frankfo,dRoad Okb~on Plriwv to Old Denton Rd .. , carrolJton Frankford Road Qd D911011 ltd 1osti1Jldnd -e Or .. Corinth w. Shady Shores Road froni, SoO fHt west of Swisher Rd to Fritiln .. Corinth S. Glrn5;011 Road F,oml-35EtoCiffOilbDr. SJ C,onlllo,ds MoieleYFload Fr0111'1 U:5 11wv JIO to T!pl)to Flo.lid 52 2 ClouRoads li:eyes Lane (Outside of Oak Shores) From Tipps Ro1d to MIiicreek Road S3 z CtcuRoadS EHi/West COiiector Road From Potters Shop to FM 720 .. 2 little Elm HIULane Olk Grove Pulr:way to Dickson Lane ss 2 LlttleElm Woodl.1ke Parkw,1y [11p,an1ilol\ Eidond.:, to FM 423 from Northbound SH 121 Frontage 54 2 The Colony North ramp connt!ction from SH 121 l\oad to Nebraska Mart Drive and South to Dlffll!l111 Diamond 1n1erch.1nge Colony Blvd. at Divergfna Diamond lflttl'dltn,:e. 51 2 Tl'le Colony Memori.alOriv• From east city limit to Standridge Drive .. 2 The Colonv Windhaven Partw.1y FrOffl. HS tern Qty limit to wutem dty llmlt. .. 2 The Colony Lebanon Rd. from City's NW city l!mlt Leb.1non Road Roadway Unestothewutendofthestreet .. 2 oen10ncounty Shady Shores Ro;id From W Shady Shor~ Road to Sllktree Coort ., Denton Countv S11a1elticPrni1:ct1 NA ., CoooerC1n-. EutalflDrlu@ itbrfdll'e .. rlCJwerMound l(Jrkp.trld Lane Extension From FM 1171 toeastofS. Guden Rid«e .. F"lawer Mo1,1nd U.kesidePukw,1· from f-M 209 t.o SH lll .. Hickory creek Ha,borL;ine From Strait Lan• to Harbor Grove Park .. Hidto,yCtffk Point\lista Koad from SOuth of stamfDfd Road to Point Vista Part entrance l!outh ., HirkaniCU·el: South Hook Street F",om Main Slfl!l!t tD Guth .. Hio:aryCteek Country lane From oak Street to Woodlake Road .. J HlghlandV!lla1e Hl&hl1nd VIUage RoMI Ff Om Bruos Blvd to KCS Rsdlrcad 10 Highland Village Hlgh\;ind Shores Blvd. Briar HIii to Twin CCN~ f"tom 350S. ShacfyShores Or. to 700N. n L.lkeDilflas Shady Shores ROM! S11.1dy Sl'lom Rd. and from 427 S. Shady 51:lcires Rd., to 409 S. Shady Shores Rd. 11 3 LlkeDallH Hundley Drive Fron, 200W. Himdley Dr. to 800 £. ~lundlrv Dr. 7J Li .. eD.ilo LakeOallnDrlve flOffl 101 S. Lili Dallas Dr. to 633 s. Llk111D~nor. 7f • t.1l.cOallH 5wl$~rRoad From 302 E. Swisher Rd., to 501 Swisher . •. 15 3 Llike:Oallas Car1151e Drive (LO & Hickory Creek From 100 Cllrllsle Dr. to 650 Carlisle Dr. ProJ~•l ...,;II, 13 Aebulld M;ulon ll~d 10 4·1•ne undivided roadway, ln~tall under•roond dralnue Rebtllld & stabilize road base, resurf;iice with a5,phalt Carrstruct 6-l1ne controlled Kcess frHway Strate le funclin1. for proltcU wfWn Pr«-dnr;~ 1 ,. ,.., ,,~,,, ( PIIECINCTZ Wfi&n from l-U11c U> l•litne lt!Momtruc:ti~ hl"l ReCOflruuclfon-3600 Feet Construction of an East/West Coltector r°'-ttw'IIV from Pon,mhop Jl:cml to FM 720 Fteum~fruct «>01tln1 r011tw'ay to provldll' :l•l111e divided t.rou.-tection with under1round dr.1!n1s• system, enhanced lind~aoin1 and tldewalb. 1M.cl1.1n, 25' wide tranl lanes Complctina: the final r.1mp cDllnection from the SH 121 1'-roM11e llo.d to Neb.-.skl furniture Mart Drive ind S. Colony &lvd.. and the divtrafn1 Diamond lnterdianae by adding a lane ramp and a connection lane. This project lndudes pavfnt. storm drainage, utlllty relocation,. a uaffk sil'lal, brld&c modifications, stdewalk, lar\dscape and frri11tlon system modifications. Widenln12.20 miles WJdenlna;1.7mUes Sice pr'fp.nuon, tufflc control, NII depth reconstruction of approx. 350-27'x15' panels indudlnc s~ thick flexible baseswbar•de Fleconstruct road to elevate out of flood pt.aln; draln•i~ (mmQ~OII Su11ettk tundin for DfDIC.Ct:I, \lr"lth!n PreQn~ 2 --II '_""ll ~-,--; .· PRECINCTS Brichiere IKl'men, Phase Ill utanslon Ci6odcitv Im fOVC'fl!CflU Reconstruction Reconstructfon RMDMtl"UctlOft Jteconstructlon Rec1C1nstructlon Reconstruct Reconstruction Reconstruction Reconstruction Reconnrualon R«omtn.lctlon liil' ' "'" $10,400,000 $S,200,000 $4,700,000 $2,350,000 $256,000.CXXI $10,(XX),OOO $1.700,.00'.J $4,350,lXXl s,.,oo.tm $4,!iSOOOO Sll,200.000 $9,100.000 S12.1SO,txD s,.ns..ooo $510,000 $255,000 S3,ooo,ooo Sl.500,000 $6,250,000 $3,115,000 s,.soo,ooo $3,250,000 $21,(X)Cl,000 $2,500,000 $.l,S00.000 $1,750,('0'J >41,•oo,ooo $2,700,000 $8,735,000 $5,234,000 Sll,lS7,000 SS,&11.SOO $5,400,000 $2,700,000 $19,SM.OOO S9,7SO.OOO $10,000,000 $5,000,000 $4,000,000 $2,(X)Cl,000 $5,000,000 $10.l)OQ,Ca> •I C, s1,200,ooo $250,000 $8,718,000 $3,475,000 $11,54Q..00D $4,270,000 l.140,000.00 $550,000 2,!00,000.00 ssso,ooo 4,290,000.00 SS!,o,ooo $970,000 $550,000 $2,600,000 $1,100,000 $9,320,000 $4,660,000 $11,C77,CO'.) $5,477,000 $7,044,000 $3,044,000 $S,900,000 $2,950,000 $610,(XXJ $3,186,CXX) $1,593,000 'j] ~ Ptiolity #1. Thi$ prlCljectwould allow for com:r.tein dtyllmlli.rid ilsplwk In county PDfCion. 1fcot11tructed. an concrt!e cDStl, 1001. $12 300.000 Sl..150.CDI Priority#2 SO ~lnal scope and fee have been I educed to $27 m.fi!on Prefect covered in Judie', C. -.o.U11J Deltlln,: Sl-S73..77S· Conmut:lion$74060X) D ........ : s.1.38337'·Constructlon $6 s1oca, $l55.JJDO =-=•trs l\eed,id based on T)OOT l115pKtion report; Oesla;n: $100,000; Construction: $1. b If lh,e--11 5eamenh: SJ.1.SQOPDD =-,'.'.::'-~;~ ~s; 52 rnlRIOn from Corinth. May be able to seek "Safe Routes to $1.m.aao lc:1 aid in reM1.1bhil'lment of~ Town·s Commercial Dtstnct after Ion or ROW With ,.onnructloo al US :UO, S5,m.,&IDD Pnortty 11 HII L.aoe ls tnc boundary between precirw:ts 1 I. 2 and hatf" In each. $5,17 .. $2,,100,000 Priority #1. Cty's submittal provides more Info on why this r, important to the city. SI.MQ.OOD Priority 12. City's ,ubmlttal provides more Info on why this Is import.nt to the city $5.acm.aao Pnarrty#S, See city', submittal for more info. $Ul0D,,DCID Pffonty 17. See city's submittil for more info. Heavy traffic and only entr.1nce to The Tribute and Old American Golf course where• nationally televised LPG.A. event ts hitld ilnnu•ll'f. $5,IIID.OOD Need additional construction fundln1 $5.Jill,IXG There 1testillfl.mds inTripOBforthls project .. ,-- $1.59D,OOO ~:-:~~tlector l•adir11 to Harbor Lillle f'.rk. tM1bof Lane P.1tt to h.-n new tr;iilhHd and SGD.IIOD Act~tv used by Deni on Water Department lo auen Lake Lewis vine pump station. Proposed road reconstruction to replace .1pproll. 4,CXX> IJnea, feet of a,phalt road with a $1.alD.DDD treated subbase, new wider width Hphalt road, Improvements to road aeomctry Within ROW, and dralnaae Improvements. En,ineertn, Is funded by the City of HV alMi Is cunenlly underwey. AntJdp1ted to be shovel ready with County bond funds are avall1bte. Propo1ed work to repl1ce ;ipprox. 4,000 lineu feet of divided concrete road with a treated ~~ :::::~~,:=:~~~:==~r::~::::·t~:..,~~=::~:=~~~:~:::~d~:::,i:.111t', un0erw1y. It's antfclp1ted to be shovel ready when Denton County bonds are ;ivailab1e. $6.a:D,,aOD E:adudlna brlds:cs project; Priority,n. $,1,am.aoo Priority 12 $2.IIWUIOD Prtorlty 15 "'10,DDII ·-·· 76 77 • ,. ,. "' ., • ., .. .. IJ5 • .. J ., .. .. 90 • ., 92 • .. • .. • .. • .. ., • ff • .. • 100 • 101 • 102 , .. . , .. • JOS l06 • 107 , .. , .. uo 111 JU • Jl3 • llf • ll5 • JJO • u, Ha LakeDalliH Dobbs Rci•d (LD, Corlnlh, Shldy 5hOlt!tPT&lt:(t1 Ltwts11Ule l-35E Jmprovemenu Lewisville Huffines Blvd. l.~isvnle Co,nor1te Drive Le'Nffvllle R.illro~Strtet Lew11vin@ VlllH Partwav/CMc C.-i;la L•wtMII• Wgt(ollc-e LewfMlle i. Ki!'ll-.ifi.v. Lewlslfil1e S-.Charles Lewisville McKenzle-tf.enhnl Denton Countv StrolU!idcP~ech Art~ Hickory Hill Dento,, Bonnie Brae Ph;ue 48 Canton Bonnie Brae Phase S Denton Westaate/Wlndsor/Bronco Way Ol!nlon Elm/l~ Dish Me:.tdow Ranch Road Dish Chisum t>ish Lcnp!(lrn Meadows South "'"' 01ru.1JrtleldRoad Dhh HovenUmp Lane Double oat Klnrs, Rold Flower Mound Denton Creek Blvd. at 1·35 W sieno1I Fklwer Moond OffltDl"I Creek 11.0u!C"Yard Flower Mound Ot!nton Creek Boulevard Br.file Flower Mound Mc:Makln/Shlloh Road Justin John Wiley Road Justin Bos.sllin•eM:o•II Krum HonltlnsRoad Fiom 100 Dobbs Rd. to 324 Dobbs Rd. Reconstruction "-1 Main Street, Corporate, and Business Corridor Improvements in con/unction with TxOOT 121 ornlert!. From Corporate Dttue to Ston-•I ti.111n to SH 111 ~fetv lnu:,rowmt!nt FMJ17ltoCOOru- $6,400,000 $6,000,00J S4.iuo.an SL2,000.()(I) S7.SOO.OOO s10.nm.ooo $7,7}0.000 $4,l'l0,000 ss,sm,ooo $6.500,000 NA Str•te-.i("-ndin for rolectswithinPreclnct3 )17.000.000 Nort.n. Gibban.1 to FM l&XI From l-3SE to Scripture From Scripture to US 380 Various From US 380 to Oak Street From Tim Donald Road to Western Me11dow ~Inch From FM 156~oChiwm Rold Within lonporn Meadows Subdivision within lon.ahorn Meadows From Tim Donald Road to Eakin From Eakin Cemetery Rind Sc11.1lh to Waketon to Shiklh/McMakln From l-3SW to Prairie Rid.A.-! Rd. A1 Graham Crossin& it Mc:Maldn/Shiloh Rd and H;iwl:/Klnp "' PRECINCT4 f .. rMO!'ISO"ud.lon IAPl>fDlL l mi .• Wide.n elristtng from 4-4anu undivided to 4-lanes dMded Wldt-n. from <1-11111!:5 to 4•l•ne.s dillllded, lntlud1111 dralnu:lf' Hnn•rv ~tr tnd utffl lhthtlnir; Wjden, reconstruct, and provide connectivity Reconstruct Fulfreconstructlon Full (ll!«wUUUCUOn Full recorutI1Jctfon and dralnaae Full recondructlon and dralnaae Ful reconstruction and dralna1e l.l mil~; remove exlst1n1 asphalt roadway & replace with reinfon;ed concrete pavin& with shoulders and bar d!tche,. Some ROW r~uired, alan1 with utility rrloat»oM. SltnJlinstalatlon Reali1n Intersection from TermlnllS of new FM 1171 to Boss Add fourth kme toexitina; 3-lane concrete r0c1d. Creatr,. Rtnp Road •n undivided four lime. Approx, 3100 feet S,,000,000 $11,214,336 $10,076,039 $8,200,000 $ll,000,(100 $190,000 $.330.000 $2,810,0CO $660,000 $1,550,000 $5,000,000 $1,000,000 $13.~000 $10,000,000 $1,000,000 $4,600,(lll0 FM 407 to Sam lite nold,; Wtden and lfflfltO\'e ro,dwa $,4,YIO,ax> S.l.32.S.000 S,6..000,000 $5,000,000 $2115,0,000 S1..17S,OOO Sl.JS0.000 Sl,300,000 , ... S>.ooo.ooo $4,114,336 $1,103,010 $4,100,000 S7.000,000 $250,000 S'l0,000 SEi,150,000 $5,000,000 $920,000 From FM 1173 to FM !~6 lflldtn Aoad Sl 6al.000 S260,000 $6.4DllDDII Thh. project 1, in 3 communities In both Prct, 2 and 3. ,,._, $17DJDtmn $7,UID.llllll $7 $J.ID)JJOD county to contribute 50 % match up to $3 mllhon S5aD.lm $SJXJQ,DDD SS0.,,000 commitmentfundsarefromTRIPOB tJ.aD,.oaD Al:11'1mentwlthFM1171 to tM counhl nn:tr:m Krum E'l,lilnSROtd Nortnlah Fi11111htR01d' Northl1.h Mulklho ⇒~~:;:===:m~~~=====:::/!'~•Dffl~IM~l1~H~IO~J•~<b~o~o~•o~•dt:==t==============t====S~lj,1~"1~,000@~==:}~S1~"1~.000~t:=====j <,;,':.OOO"""ij=======================:j From 04d JImIn Ro:ad 10 FM 407 Sb.Ol,JCl.000 $3,000,000 ~ FM 407 to Flirw•"C41 $1,750,000 S87S,000 Nort.hl1h McPh@rson Ro.aid fforthlillh Wh'l'l1t Ponder Hithschool Road Ro111ot.e Dorm.nRoilld illo1noke Howe Road Ra.anakt1 N.Oak5treet Roanoke N, Walnut Street Tro,,tlvCJub Tn1fflc Mftlgatlon In Trophy Cub, 11.oundabouu Trol)hyC1ub Tr•ffi~ Mitigation in Trophy Club, floundabouts Denton countv suade, llloikll oentontaunrv Stnleric Proue,cu IH 35W FR to Cleveland Gibbs S!,.050,(Dl S,4,02S.OOO IH35 loll sueet to Byron Nelson Hwy, 114 to Marshall Creek Road Byron Nelson to Dorman Street Bron N•1son to N, Oik Street Ell111ing 3•way lntersectfons of Trophy Oub Drive & Bobcat Blvd. Existing 3-way Intersections of Bobcat llo!vd. & Mks:hlll, 0-tt\ Flom ll!ObiOft R•nch R □lld to FM 15' NA Construct new routway Awai aou ~Ion Canaete curb & gutter itfNU to lndude sldewalks, w,te,, iewc, & drain1ge improveml!!,nls Conttele curb & gutter streets to In dude sidewalk.s, wuer. 5.'!Wer. & dr.1Inage Improvements COPCr~• curb & autter streets to Include s1dewi1lks, Wat~, sewer & drainage improvements Coner~• curb & sutter 1trffts to lndude sidewalks, w1ter, uwer, & drtlnage improvements Con1truct a roundabout at the existin& 3·way ln1er1ecU11ns of Trophy Club Orive & Bobcat Conrnuct roundabout at ~tersKUon of 6,c1;1cat Blvd & Mann.1110~ Job!-Ot!lermlned S1r1C1t I< fundln lor proittts within Prednct4 ,. " ... ROAD BOND TOTAL $4,000.000 S?,000.000 $f.,§OOJXQ $ l.S00.000 $1,sa>,000 $4,500,000 $3,600,000 $3,300,000 $3,600,000 $3,000,000 $9,200.000 $17,CIXI.ID) •l ,lo $2,338,034,405 $750,000 $2,250,000 $1,800,000 $1,GS0,000 $1,800,000 $1,500,000 $286,096.305 ~~ CcntribullnL eonstructicm funds and land donatioru... Run.I crou ,fflion $7SOPDO -•· $U50PQD Priotltyll2 $1.aJD.ODD Prlorlty#3 $Ul!O,OOO .......... See note on ritv s\lOffllml on ;intlfi~tJon. Both this and the other round1bout are prioritized '1,IDD.OOG as equally Important for hi&h school and middle sthool safety measures. Does not Ind. ROW costs. $1,500,000 Sime note as above . . ., ._ S570,79■,ooo J111' '':::i7 Denton County Dent1;1n County Unlnccrporated ltoadw• 1m...-o~emcnt~ Varlou1 Wlde:11, reconstruct, improve, convert, drainage prolKts for unincon>orated CO'INltl' ro.ads DENTON COUNTY UNINCORPORATED COUNTY ROAD CAPITAL IMPROVEMENT PROGRAM (CIP) TOTAL S79,202,000 1r.-.-1n..a\.1■■ 'J~•-•1.: 1■u•••-■!'l1'1l1t..-,~• 1:••!.11:11 • ... .-, 1•u •1 :J:'J.eu 1;;;11,•n;;;aa•■~:.il~.I lfe-l~Jr• .. ••••••!'.11~__.,mc,~Jr• .. ••• 1-■• ■••