Form ROW-U-COA
(Rev. 08/25)
Page 1 of 11
Standard Utility Agreement
Supplemental Agreement No. 3 to U Number N/A Utility ID U00008008
District: Dallas County: Denton
ROW Project ID: R00006793 Highway: IH 35E
ROW CSJ: 0196-01-114 From: South of Mayhill
Construction CSJ: 0196-01-106 To: South of SL 288
Proposed Highway Project Letting Date: 9/1/2023
THIS SUPPLEMENTAL AGREEMENT State City of Denton
UtilityState.
WHEREAS, the State and Utility executed a Standard Utility Agreement on June 30, 2024 concerning the
adjustment, relocation, or removal of certain of the facilities;
WHEREAS, said Standard Utility Agreement limits the required scope of work and/or the amount of eligible
reimbursement;
WHEREAS, due to newly discovered information by the Utility deemed sufficient by the State, the State and
Utility agree that supplementation to the Standard Utility Agreement is necessary; and
WHEREAS, the statement of work contained in the Standard Utility Agreement shall be supplemented to include
the reason the supplemental is needed and the change in cost: update city labor rates and easement costs, and
to include temporary signage, mobilization, site preparation, storm water pollution prevention device (installation &
removal) costs (cost estimate lines 1 through 5), which is more specifically shown in plans,
specifications, estimated costs, and schedule, which are attached to this supplemental agreement as Attachment
NOW, THEREFORE, BE IT AGREED:
The statement of work contained in the Standard Utility Agreement is supplemented to include the additional
adjustment, relocation,
The estimated cost of the adjustment, relocation, or removal is increased or decreased to a total of
$17,796,546.39, or no change to the Total Cost Estimate. The parties agree that the approval of estimated
costs in no way indicates the eligibility of said costs for reimbursement.
All conditions and agreements contained in the Standard Utility Agreement, except those specifically included in
this document, remain in effect.
The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the
party represented.
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 2of 11
UTILITY EXECUTION RECOMMENDED:
Utility: City of Denton
Director of TP&D (or designee), Dallas District
By: _______________________________________
Title:
THE STATE OF TEXAS
Executed and approved for the Texas Transportation
Date:
Commission for the purpose and effect of activating
and/or carrying out the orders, established policies or
work programs heretofore approved and authorized by
the Texas Transportation Commission.
By:
District Engineer (or designee)
Date:
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 3of 11
Plans, Specifications, and Estimated Costs
Not Applicable
All material items within the cost estimate that must meet Buy America or Steel and Iron
Preference Provision requirements must be indicated with an asterisk (*).
Currently, this project does not plan to use iron and steel subject to Buy America
requirements. In the event that Buy America regulated materials are used during the
construction of this project, compliance documentation will be provided.
There are non-domestic iron and steel materials in this project that fall under the De
Minimis equation. Calculations showing the total cost does not exceed one-tenth of one
percent (0.1 %) of the individual utility agreement amount or $2,500.00, whichever is
greater is required.
We understand the Buy America Compliance Requirements for iron and steel and will
supply the required documentation to TxDOT indicating compliance with this provision.
The following documents will be supplied prior to the installation of the materials:
1) Form 1818 - Material Statement
2) Material Test Reports or Certifications
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 4of 11
Plans, Specifications, and Estimated Costs
Not Applicable
All construction material and manufactured items within the cost estimate that must meet Build
America, Buy America (BABA) compliance must be indicated with a double asterisk ( ** ).
This is to acknowledge that the material(s) listed/marked in the cost estimate will be in
conformance with the governing specification(s) and that at least the final manufacturing
processes and the immediately preceding manufacturing stage for the manufactured and
construction material occurred in the United States of America. Alterations to this document by
any agency other than the Utility Company/Supplier will void the certification.
Per 2 CFR 184.3, manufactured products means:
(1) Articles, materials, or supplies that have been:
(i) Processed into a specific form and shape; or
(ii) Combined with other articles, materials, or supplies to create a product with
different properties than the individual articles, materials, or supplies.
(2) If an item is classified as an iron or steel product, a construction material, or a
section 70917(c) material under § 184.4(e) and the definitions set forth in this section,
then it is not a manufactured product. However, an article, material, or supply classified
as a manufactured product under § 184.4(e) and paragraph (1) of this definition may
include components that are construction materials, iron or steel products, or section
70917(c) materials.
Per 2 CFR 184.3 and 2 CFR 184.6, construction material includes:
Non-ferrous metals Fiber optic cable (including drop
cable)
Glass (including optic glass)
Plastic and polymer-based products
Optical fiber
(including polyvinylchloride, composite
Lumber
building materials, and polymers used
Engineered wood
in fiber optic cables)
Drywall
Authorized Utility Owner Representative:
Signature
Title
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 5of 11
Accounting Method
Not Applicable
Actual Cost Method of Accounting
The Utility accumulates cost under a work order accounting procedure prescribed by the
Federal or State regulatory body and proposes to request reimbursement for actual
direct and related indirect costs.
Lump Sum Method of Accounting
The Utility proposed to request reimbursement based on an agreed lump sum amount
supported by a detailed cost analysis.
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 6of 11
Schedule of Work
Not Applicable
Estimated Start Date (mm/dd/yyyy): , subject to physical work restrictions prior to
the issuance of environmental clearance as required by the provisions of this
agreement. (If construction will be joint bid and included in the highway contract, enter
the project let date.)
Estimated Duration (number of days):
Estimated Completion Date (mm/dd/yyyy):
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 7of 11
Statement Covering Contract Work
Not Applicable
Construction Contract: Complete form ROW-U-48 and ROW-U-48-1 if applicable.
The Utility will use its own personnel (supporting documentation will be required at the
time of billing, See ROW Utilities Manual, Chapter 11).
The Utility will use third party contractors to perform the adjustment and complete the
attached ROW-U-48 with ROW-U-48-1 (joint bid), if appropriate. (verification of
continuing contract rate sheets or copy of bid tabulation will be required at the time of
billing)
Engineering Contract:
The Utility will use its own personnel (supporting documentation will be required at the
time of billing, See ROW Utilities Manual, Chapter 11).
The Utility will use a consultant contract (verification of fee schedule is required).
TxDOT will procure a utility engineering consultant.
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 8of 11
Utility Joint Use Agreement (ROW-U-JUA) and/or
RULIS Permit
Not Applicable
Utility Joint Use Agreement (ROWUJUA)
Plans with joint use area highlighted are included.
RULIS Permit Number:
The utility should obtain an approved permit before the start of
construction inside of the highway right of way.
Quitclaim will be submitted at the Final Billing
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 9of 11
Eligibility Ratio
Not Applicable
Eligibility Ratio established: %
Non-interstate Highway (Calculations attached)
Interstate Highway
Toll Road (Minimum of 50%)
SP2125 Approved Application (100%)
Minute Order #:
Master Utility Agreement
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 10of 11
Betterment Calculation and Estimate
Not Applicable
Elective Betterment Ratio established: %
Calculation is attached and the justification is included below
A betterment and an in-kind estimate are included
Forced Betterment
To comply with regulated industry standards, laws, and
regulations. (Supporting documentation required)
To comply with published current design practice followed by the
utility in its own work. (Supporting documentation required)
Due to proposed roadway design. (Provide explanation below)
Not Applicable
A statement explaining Elective and/or Forced Betterment:
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility
Form ROW-U-COA (Rev. 08/25)
Page 11of 11
Attac
Proof of Property Interest
Not Applicable
Supporting documentation of compensable property interest that establishes
reimbursement eligibility as referenced in Texas Transportation Code §203.092.
Property interest is documented through applicable affidavits and required
attachments.
ROW-U-Affidavit (See ROW Utilities Manual, Chapter 9, Section 3)
The roadway improvement project is designated as an Interstate Highway project;
therefore, no supporting documentation for compensable interest is required.
Supporting documentation for existing easements is required for easement
replacement.
Toll Road (Supporting documentation of compensable property interest required if
more than 50% eligibility ratio is applied)
SP2125
Master Utility Agreement
______ __________ ______ __________
Initial Date Initial Date
TxDOT Utility