Loading...
HomeMy WebLinkAbout2006-165ORDINANCE NO. �2_�6 AN ORDINANCE ACCEPTING COMPETITIVE BIDS AND AWARDING AN ANNUAL CONTRACT FOR ELECTRICAL SUBSTATION CONNECTORS FOR THE HICKORY SUBSTATION; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND PROVIDING AN EFFECTIVE DATE (BID 3512—DEUTSCH CONNECTORS FOR HICKORY SUBSTATION 69KV BAY PROJECT AWARDED TO IRBY SUPPLY COMPANY IN THE ESTIMATED AMOUNT OF $34,718). WHEREAS, the City has solicited, received and tabulated competitive bids for the purchase of necessary materials, equipment, supplies or services in accordance with the procedures of State law and City ordinances; and WHEREAS, the City Manager or a designated employee has reviewed and recommended that the herein described bids are the lowest responsible bids for the materials, equipment, supplies or services as shown in the 'Bid Proposals" submitted therefor; and WHEREAS, the City Council has provided in the City Budget for the appropriation of funds to be used for the purchase of the materials, equipment, supplies or services approved and accepted herein; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. The numbered items in the following numbered bids for materials, equipment, supplies, or services, shown in the 'Bid Proposals" on file in the office of the City Purchasing Agent, are hereby accepted and approved as being the lowest responsible bids for such items: BID ITEM NUMBER NO VENDOR AMOUNT 3512 1-19 Irby Supply Company Exhibit A SECTION 2. By the acceptance and approval of the above numbered items of the submitted bids, the City accepts the offer of the persons submitting the bids for such items and agrees to pur- chase the materials, equipment, supplies or services in accordance with the terms, specifications, standards, quantities and for the specified sums contained in the Bid Invitations, Bid Proposals, and related documents. SECTION 3. Should the City and the winning bidder(s) wish to enter into a formal written agreement as a result of the acceptance, approval, and awarding of the bids, the City Manager or his designated representative is hereby authorized to execute a written contract in accordance with the terms, conditions, specifications, standards, quantities and specified sums contained in the Bid Proposal and related documents and to extend that contract as determined to be advantageous to the City of Denton. SECTION 4. By the acceptance and approval of the above enumerated bids, the City Council hereby authorizes the expenditure of funds therefor in the amount and in accordance with the approved bids. SECTION 5. This ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this 20"—day of 2006. 9)'n' 0�m`V PE R. McNEILL, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: APPROVED AS TO LEGAL FORM: EDWIN M. SNYDER, CITY ATTORNEY BY: 3-ORD Exhibit A BID # 3512 DATE: May 23, 2006 Deutsch Connectors for Hickory Substation 69kV Bav Proiect ITEM QTY. Catalog # DESCRIPTIONI VENDOR Irby Supplyco. Principle Place of Business: Fort Worth, TX Terminal, Compression, Offset Assembly, AL, Tin CPLK9442D Plated, 1590AAC Cable to Flat 4-Hole NEMA Pad, 1 64 15900T 4" Wide, 3/4" Thick Pad $46.20 Estimated Delivery Time: 6-8 weeks Connector, Swaged Expansion Terminal, Center - Formed Assembly, AL, Tin Plated, 3-1/2" S.P.S. AL 2 9 PLK260OD5 to Flat 4-Hole NEMA Pad, 4" Wide Pad, 3/4" Thick 6E1T Pad $497.55 Estimated Delivery Time: 6-8 weeks Connector, Swaged Expansion Terminal, For Tube to Flat, AL, Tin Plated, 3-1/2" S.P.S. AL to Flat 9" 3 9 PLK2601D5 Long 4-Hole NEMA Pad, 4" Wide Pad, 3/4" Thick 6E1T-9 Pad $497 55 Estimated Delivery Time: 10-12 weeks Connector, PowerLok NEMA Center -Formed Assembly Terminal, For Tube to Flat, AL, Tin 4 9 PLK1850D5 Plated, 3-1/2" S.P.S. AL to Flat 4-Hole NEMA Pad, 6BT 4" Wide Pad, 3/4" Thick Pad $g6.74 Estimated Delivery Time: 6-8 weeks Connector, PowerLok NEMA 90Degree Pad Angle Assembly Terminal, For Tube to Flat, AL, Tin 5 9 PLK1870D5 Plated, 3-1/2" S.P.S. AL to Flat 4-Hole 90Degree $104.34 6BT NEMA Pad, 4" Wide Pad, 3/4" Thick Pad Estimated Delivery Time: 6-8 weeks Connector, PowerLok Splice with 90Degree Transverse Adapter Tongue, AL, Tin Plated, 3-1/2" 6 6 PLK125OD5 S.P.S. AL to Flat 2-Hole NEMA Pad, 2" Wide Pad, 6E1T 3/4" Thick Pad $g6.20 Estimated Delivery Time: 6-8 weeks Connector, PowerLok, AL, Splice with 90Degree Transverse Adapter Tongue, Tin Plated, 3-1/2" AL 7 16 PLK1150D5 to Flat 4-Hale NEMA Pad, 4" Wide Pad, 3/4" Thick 6L2E2T Pad $103.80 Estimated Delivery Time: 6-8 weeks Page 1 of 3 Exhibit A ITEM QTY. Catalog # DESCRIPTION , VENDOR Irby SupplyCo. Principle Place of Business: Fort Worth, TX Connector, PowerLok, AL, Splice with Two Longtitudinal Adapter Pads, Tin Plated, 3-1/2" 8 7 PLK1120D5 S.P.S. AL Run to (2) 4-Hole NEMA Pads, 4" Wide, 6E2T 3/4" Thick Pad $139.68 Estimated Delivery Time:6-8 weeks Connector, PowerLok 90Degree Elbow, AL, 3-1/2" 9 22 PLK1400D5 S.P.S. AL $106.54 6E4 Estimated Delivery Time: 6-8 weeks Connector, PowerLok 45Degree Elbow, AL, 3-1/2" 10 8 PLK1400D5 S.P.S. AL $117.12 6E2 Estimated Delivery Time: 6-8 weeks Connector, PowerLok Reducer Splice, AL, Reduced PLK1010D4 from 3-1/2" S.P.S. AL to 3" S.P.S. AL PIPE 11 g 856 $106.25 Estimated Delivery Time: 6-8 weeks Bus Support, PowerLok Horiztonal Support, AL, 3- PLK2210D5 1/2" S.P.S. AL, 5" Bolt Circle, Slip or Rigid Fit 12 28 6E12 Applications, 3/4" Thick Base Plate $202.99 Estimated Delivery Time: 6-8 weeks Tee, Split Main Cable Run to 2" Wide 2-Hole Tap, CPLK9512D Compression,,AL, Tin Plated, 1590AAC Cable Flat 2 13 12 15900T Hale NEMA Pad, 2" Wide Pad, 3/4" Thick Pad $98.37 Estimated Delivery Time: 6-8 weeks Terminal, Compression, Offset Assembly, AL, Tin CPLK9202D Plated, 1/0ACSR Cable to Flat 2-Hole NEMA Pad, 14 34 00020T 3/8" Thick Pad $25.55 Estimated Delivery Time: 6-8 weeks Bus Support, PowerLok Horiztonal Support, AL, 2" PLK2210D3 S.P.S. AL, 5" Bolt Circle, Rigid Fit Application, 3/4" 15 10 2E12 Thick Base Plate $161.42 Estimated Delivery Time: 6-8 weeks Tee Connector, PowerLok, AL, TEE Configuration PLK1500D3 from 3-1/2" S.P.S. AL Main to (1) 2" S.P.S. AL 16 10 256E1 90Degree Tap $115.22 Estimated Delivery Time: 6-8 weeks Page 2 of 3 ti Exhibit A ITEM QTY. Catalog # DESCRIPTION VENDOR Irby supplyco. Principle Place of Business: Fort Worth, TX Terminal, Compression, Offset Assembly, AL, Tin CPLK9642D Plated, (2) 1590AAC Cable to Flat 4-Hole NEMA 17 28 159004T Pad, 4" Wide, 3/4" Thick Pad $75.82 Estimated Delivery Time: 6-8 weeks Connector, P6werLok NEMA Center -Formed Assembly Terminal, for Tube to Flat, AL, Tin 18 10 PLK1855D3 Plated, 2" S.P.S. AL to Flat 2-Hole NEMA Pad, 2" 2T Wide Pad, 1/2" Thick Pad $gg,46 Estimated Delivery Time: 6-8 weeks Connector, Power-ok 45 Degree Elbow, AL, 2" 19 8 PLK1400D3 S.P.S. AL $53.26 2E2 Estimated Delivery Time: 6-8 weeks Bidder is an authorized distributor, by the manufacturer, and is authorized to sell to the City yes of Denton? YES or NO or N/A �Pnces shall be bid F.O.B. Denton Page 3 of 3