Loading...
HomeMy WebLinkAbout2005-037FILE REFERENCE FORM 2005-037 X Additional File Exists Additional File Contains Records Not Public, According to the Public Records Act Other FILE(S) Date Initials Change Order One - Ordinance No. 2007-052 03/06/07 JR ORDINANCE NO. ADOS _037 AN ORDINANCE ACCEPTING COMPETITIVE BIDS AND AWARDING A CONTRACT FOR PURCHASE OF MEDIUM VOLTAGE SWITCHGEAR BUILDINGS FOR DENTON MUNICIPAL ELECTRIC; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING FOR AN EFFECTIVE DATE (BID 3282—THREE YEAR AGREEMENT FOR PURCHASE OF MEDIUM VOLTAGE S WITCHGEAR BUILDINGS AWARDED TO ABB, INC. IN THE ESTIMATED AMOUNT OF $1,482,021). WHEREAS, the City has solicited, received and tabulated competitive bids for the purchase of necessary materials, equipment, supplies or services in accordance with the procedures of State law and City ordinances; and WHEREAS, the City Manager or a designated employee has reviewed and recommended that the herein described bids are the lowest responsible bids for the materials, equipment, supplies or services as shown in the 'Bid Proposals" submitted therefore; and WHEREAS, the City Council has provided in the City Budget for the appropriation of funds to be used for the purchase of the materials, equipment, supplies or services approved and accepted herein; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION 1. That the numbered items in the following numbered bids for materials, equipment, supplies, or services, shown in the 'Bid Proposals" on file in the office of the City Purchasing Agent, are hereby accepted and approved as being the lowest responsible bids for such items: 3282 VENDOR EI-TI-julm Exhibit A SECTION 2. That by the acceptance and approval of the above numbered items of the submitted bids, the City accepts the offer of the persons submitting the bids for such items and agrees to purchase the materials, equipment, supplies or services in accordance with the terms, specifications, standards, quantities and for the specified sums contained in the Bid Invitations, Bid Proposals, and related documents. SECTION 3. That should the City and persons submitting approved and accepted items and of the submitted bids wish to enter into a formal written agreement as a result of the acceptance, approval, and awarding of the bids, the City Manager or his designated representative is hereby authorized to execute the written contract which shall be on file in the office of the Purchasing Agent; provided that the written contract is in accordance with the terms, conditions, specifications, standards, quantities and specified sums contained in the Bid Proposal and related documents herein approved and accepted. SECTION 4. That by the acceptance and approval of the above numbered items of the submitted bids, the City Council hereby authorizes the expenditure of funds therefor in the amount and in accordance with the approved bids or pursuant to a written contract made pursuant thereto as authorized herein. SECTION 5. That this ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this / ' day of CWW2005. 47 C!&ck— EULINE BROCK, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: APPROVED AS TO LEGAL FORM: HERBERT L. PROUTY, CITY ATTORNEY BY: 3-ORD-Bid 3282 Exhibit A Bid 3282 Three Year Agreement for Purchase of Medium Voltage Switchgear Buildings Unit Prices Bidder: ABB Manufacturer Information: Buildin manufacturer Metal Systems Switchgear manufacturer ABB Ship from Houston Dates: Approval drawings (weeks ARO) 4 Time allowed for owner's review (Days) 5 Shipment weeks ARO) 20-22 Unit Pricinu & Related Data: $392,628 Base price (excluding freight) Estimated freight $2,887 Maximum not -to -exceed amount for freight $4,125 Base building length 43 Increase building length by 2' $3,025 Maximum building length 60' Span breaker cost 2000 a (1 required each building) $8,006 11200amp $6,217 Add one feeder breaker section $35,613 Credit to delete one feeder section -$35,613 Increase length of marshalling cabinet by 6" $275 Spam input power bushing $470 Estimated building weight 65,800 Porcelain bus insulator upgrade $6,256 Participate m intergovernmental agency purchases Yes Participation in price escalation/de-escalation (after I st year) Yes Warranty 24/30 Can meetspecified first building delivery Yes Pronosed ABB nation costs *** Unit Price Arc detections stems for three buildings $25,000 Additiona cost for 22 circuit breakers all buildings) $1,100 Revised estimated total for ABB with options for three buildings $1,482,021 *** ABB proposed two options that were not required in the bid specification. The first is an am detection and high speed tripping system. The purpose of this system is to detect the presence of arcing faults inside the switchgear at a very early stage before the fault magnitude is high enough to be sensed by the other types of bus protection. The cyst is not a replacement for the standard types of bus protection. It is a complimentary enhancement to safety. The unit c is $25,000 for including this in the Switchgear. The second item is to substitute ABB's low maintenance circuit bmak in place of their standard breakers. The increase in unit cost per breaker would IM 100. The lifetime ownership cost of these breakers will offset the higher initial cost. The low maintenance design has one moving part and is lighter wei ht. DME proposes to accept both of these options. st