HomeMy WebLinkAbout2010-094ORDINANCE N0. 2010-094
AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER
NUMBER ONE TO THE CONTRACT BETWEEN THE CITY OF DENTON AND THATEN
CONSTRUCTION INC.; PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFOR; AND
PROVIDING AN EFFECTIVE DATE (BID 43 3 6-CHANGE ORDER NUMBER ONE TO FLEET
FUELING AND TRUCK WASH FACILITY IN THE AMOUNT OF $463027 FOR A TOTAL BID
AWARD OF $2,0939712).
WHEREAS, on December 15, 2009 by ordinance No. 2009--314, the City awarded a public
works contract to Thaten Construction Inc., in the amount of $2,047,685 for the construction of an
alternative fuel and truck wash facility; and
WHEREAS, the Staff having recommended, and the City Manager having recommended to
the Council that a change order be authorized to amend such contract agreement with respect to the
scope of work and an increase in the payment amount, and said change order fees under the proposed
contract are fair and reasonable and are consistent with and not higher than the recommended
practices and fees published by the professional associations applicable to the Provider's profession
and such fees do not exceed the maximum provided by law; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION 1. The Change Order No. One, increasing the amount of the contract between the
City and Thaten Construction, Inc., which is on file in the office of the Purchasing Agent, in the
amount of Forty Six Thousand Twenty Seven and 01100 ($46,027) Dollars, is hereby approved and
the expenditure of funds therefor is hereby authorized in accordance with said change order. The
total purchase order amount increases to $2,093,712.
SECTION 2. This ordinance shall become effective immediately upon its passage and
approval.
PASSED AND APPROVED this the � day of , 2010.
MARK A. BUTZRCyYJGUS, MAYOR
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
BY: 4
at
APPROVED AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
My
=tea 1 Document G701TM — 2001
Change Order
PROJECT (Arame and address): CHANGE ORDER NUMBER: 001 OWNER: �
City of Denton Fleet Fueling and Truck
Wash Facility
1251 South Mayhill Road
Denton, TX
TO CONTRACTOR (Marne and address);
THATEN CONST., INC.
PO BOX 909
SANGER., TX 76266
DATE: 031129110
ARCHITECT'$ PROJECT NUMBER: 08665
CONTRACT DATE: 12/15/09
CONTRACT FOR: NEW FUEL AND TRUCK
WASH FACILITY
ARCHITECT: 0
CONTRACTOR:
FIELD: El
OTHER: Z
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable topreviously executed Construction Change Directives)
1. Revise grading plan and loading pad details
1,536.00. ADD
2. Add two Fox BPT600 spill control sumps (Figure FS-7) to dispenser island areas under the canopy and plumb to the
Fox sump at the loading pad. Revise canopy downspouts for stormwater exclusion. (Refer to Sheet A 202).
17,229.00 ADD (2) SUMPS AND LINE
3. Revise electrical for existing transformer location and 208V service. Also revise for three separate meters fog- the truck
wash, car wash, and fueling systems (Refer to Sheets MEP- 101 and MEP 20 I).
29,717.04. ADD —-ELECTRICAL SERVICE TO EXISTING METER
4. Eliminate the sanitary sewer tap. All effluent will be routed to a treatment pond northwest of the site. The treatment
pond construction will not be part of this contract (Refer to Sheets C-23 M I ;P-101, and FS-3).
Delete, sewer tap, delete line, 200', delete Bore Add 340' of 6" SDR, to replace pipe eliminated above.
(1,860.00) CREDIT .
5. Omit Four light, (3) on building and (1) on canopy
(955.00) CREDIT
6. Move fire hydrant west to the west of the sidewalk (Refer to Sheet C2).
MOVE FIRE HYDRANT --CREDIT (2,640), ADD VALVE---1,200
(1,400) CREDIT
7. Additional City of Denton storm drain details (Refer to Sheet C-3).
MODIFY, REVISED STORM DRAIN-220', 30", eliminate culverts
(13,404.00). ASH- Q t- e.'D f P
8. Delete Car Wash Equipment, installation and Maintenance Agreement from the Contract. Car wash electrical panel
CW-1, car wash bay with trench drain, overhead doors, fire extinguisher, lighting, electrical outlets and unit heater shall
remain in the Contract.
"CARWASH EQUIPMENT AND ROUGH IN SERVICES WERE NOT ADDED TO THATEN CONTRACT"
17,477.00 ADD ---ELECTRICAL AND ADD ---ROUGH IN UTILITY
9. Relocate vacuums to Fueling Canopy islands; omit roof overhang and one (1) light fixture at previous vacuum location.
Refer to Drawings.
848.00 ADD-- RELOCATGE VACCUMS
10. CREDIT OVERHANG
(1,810.00) CREDIT
11. CREDIT ON OVERHEAD FUEL, 50 LF OF 6" SDR FROM OVERHEAD FUEL TO SANDTRAP
AIA Document G701 "' — 2001. Copyright O 1979, 1987, 2000 and 2001 by The American institute of Architects. All rights reserved. WARNING: This AIA
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this A19 Document, or any
portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent passible under the law. This document was
produced by AIA software at 10:21:13 on 03/30/2010 under Order No.0604538E52 1 which expires on 01/13/2011, and is not for resale.
User Notes: (1482306873)
(1,350.00) CREDIT
The original Contract Sum was $ 2,0479685.00
The net change by previously authorized Change Orders $ 0.00
The Contract Sum prior to this Change Order was $ 2,047,685.00
The Contract Sum will be increased by this Change Order in the amount of $ 469027.00
The new Contract Sum including this Change Order will be $ 29093,712.00
The Contract Time will be increased by Zero (15) days.
The date of Substantial Completion as of the date of this Change Order therefore is
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or
Guaranteed Maximum Price which have been authorized by Construction Change Directive until
the cost and time have been agreed upon by both the Owner and Contractor, in which case a
Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND DINNER.
TERRA -SOLVE, INC. TRATEN CONST., INC. CITY OF DENTON
ARCHITECT (Firm name)- CONTRACTOR (Firm name) OWNER (Firm name) - -
3216 Commander Dr., Ste 103,
CARROLLTON,TX 75006
ADD
..-7 ; -
(Si ureo
Peru Evans, PE, PG - _ • - _ -
(Iyped name)
-.� A 0�.�
DACE
PO BOX 909 1251 South Mayhill Road
SANGER, TX 76266 Denton, TX
WADDRS q(Sig�nakree)
SS
ature}
Linda Thaten
(Typed name)
03/29/10
DATE
(Typed name)
DATE
A1A Document G70170 -- 2001. Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: ThIs Ale
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Me Document, or any 2
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This documentwas
produced by AIA software at 10:21:13 on 03/30/2010 under Order No.0604538652 1 which expires on 01/13/2011, and is not for resale.
User Notes: (1482306873)
THATEN
CONSTRUCTION, INC.
PROJECT: COI
ATTACHMENT —CO1 ADDRESS. 1251 S. MAYHILL RD, DENTON, TX
DETAIL AND UNIT MESSURMENTS
#1 REVISED GRADING PLAN
LABOR AND MATERIALS
UNIT QTY PRICE
TOTAL
Excavation by Owner
Fine grade by Thaten to accommodate
Additional Concrete
SQ YD 474 $ 2.75
$ 1,304
SUBTOTAL $ 1,304
596 OVERHEAD
EACH
1
$ 65.18
$ 65
1096 PROFIT
EACH
1
$ 136.87
$ 137
BOND EXPENSE
EACH
1
$ 30.11
$ 30
$ 1,536
#2 ADD FOX 8PT 600 SPILL CONTROL SUMPS
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
SUMPS
EACH
2
$ 2,772.00
1
$ 5,544
Installation
EACH
2
$ 900.00
$ 1,800
260' - 6" SDR LINE
LIN FT
260
$ 28.00
$ 7,280
SUBTOTAL $ 140624
5% OVERHEAD
EACH
1
$ 731.20
$ 731
1096 PROFIT
EACH
1
$ 1,535.52
$ 1,536
BOND EXPENSE
EACH
1
$ 337.81
$ 338
$ 1�,z19
#3 REVISE ELECTRIC SERVICE (ROUGH IN) (3) METERS
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
ADD Z15' ELECTRIC RUN TO TRUCKWASH
1 Run.-.2" CONDUITS W/4# 3/0
LIN FT
215
$ 42.00
$ 9,030
1 Run ... 2" CONDUITS W/1#4 GROUND
LIN FT
215
$ 42.00
$ 9,030
ADD 215' ELECTRIC RUN TO C4RWASH
4-43/0 AND 1#4 GROUND CON DUTERS
LIN FT
215
$ 42.00
$ 9,030
ADD 215' ELECTRIC SECONDARY SERVICE TO FUEL
AND TEMP PANEL
DELETE. 860 LF #3/0 TRANSFORMER TO CW METER
LIN FT
860
$ (5.49)
$ 4,721)
DELETE 215 LF #4 GRNG. CONDUCTOR TRANS TO METER
LIN FT
215
$ (1.30)
$ (280
ADD (3) 85' XV CONDUIT/200 LB PULL STRING, PHONE
EACH
3
$ 595.00
$ 1,785
ADD (2)150'X 1-1/2" CONDUIT/OVERHEAD CANOPY
EACH
2
$ 750.00
$ 1,500
1 L" CONDUIT WITH 441/0 W/1# 6 GROUND
LIN FT
215
$ 25.00
$ 5,375
(CREDIT) 85 LF ELECTRC SECONDARY 1/4" CONDUIT
W 4# 500 KCM
LIN FT
85
$ (65.00)
$ (5,525)
SUBTOTAL $ 2S,224
5% OVERHEAD
EACH
1
$ 1,261.21
$ 1,261
10% PROFIT
EACH
1
$ 2,648.53
$ 2,649
BOND EXPEN5E
EACH
1
$ 582.68
$ 583
29,717
#4 DELETE BORE UNDER STREET
LABOR AND MATERIALS
CITY
PRICE
TOTAL
(CREDIT)DELETE 40' BORE
ffLlNFT
40
$ (126.00)
$ (51040)
(CREDIT)DELETE 200', 6" SDR 35 PIPE
200
$ (30.00)
$ (6,000)
ADD 340' OF 6" SDR35 REPLACE ABOVE PIPE PER
LIN FT
1 340
$ 27.00
$ 91180
REVISED PLAN, CARWASH TO POND
$ (1,860)
THATEN
Construction, Inc.
C0103 29 2010.xlsx
#5 OMITT THREE LIGHTS
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
(CREDIT) THREE LIGHTS BLDG,1 CANOPY
EACH
-4
$ 138.75
$
(555)
(CREDIT) LABOR & WIRE TO INSTALL ABOVE
EACH
-4
$ 100.00
$
(400)
#6 RELOCATE FIRE HYDRANT
$
(955)
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
(CREDIT) 130' - 6" C900
LIN FT
130
$ (20.00)
$
(2,600)
ADD 6" VALVE AND STAND FIRE CONNECTION
EACH
1
$ 1,200.00
$
1,200
#7 ADDITIONAL CITY OF DENTON STORM DRAIN
$
(1,400)
LABOR AND MATERIALS
UNIT
TOTAL
CREDIT 220 LF OF 30" RCP
LIN FT
(220)
$ 55.20
$
(12,144)
ADD 265 LF OF 21" RCP
EACH
265
$ 46.00
$
12,190
AD B'X4' ROCK RIP RAP PAD
UNIT
1
$ 1,550.00
$
1,55D
(CREDIT) ORIGINAL ALLOWANCE CULVERTS
UNIT
1
$ (15,000)
$
(15,000)
SUBTOTAL $ (13,4U4
#8 CAR WASH EQUIPMENT/MAINENANCE
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
CAR WASH EQUIP/MAIN, WAS NOT ADDED INTO
THATEN CONTRACT
ADD ELECTRICALTO FUTURE CARWASH EQUIP
UNIT
1
$ 4,500
$ 4,500
(PER ORIGINAL PLAN DETAIL)
ADD ROUGH IN PLUMBING TO FUTURE CARWASH
EQUIPMENT (PER ORIGINAL PLAN DETAIL)
UNIT
1
$ 10,335
$ 10,335
SUBTOTAL $ 24,835
596 OVERHEAD
EACH
1
$ 742
$ 742
Y096 PROFIT
EACH
1
$ 11558
$ 1,558
BOND EXPENSE
EACH
1
$ 342.69
$ 343
$ 17A77
#9 RELOCATE VACUUMS TO FUELING CANOPY
LABOR AND MATERIALS UNIT
QTY PRICE TOTAL
ADD ELECRICAL 120' LIN FT
120 $ 6.00 $ 720
SUBTOTAL $ 720
5% OVERHEAD
EACH
1
$ 36.00
$ 36
10% PROFIT
EACH
1
$ 75.60
$ 76
BOND EXPENSE
EACH
1
$ 16.63
$ 17
$ 848
#10 DELETE OVERHANG
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTA1(3000))
2 COLUMNS 1-201,1-14', EACH 4x4
LIN FT
34
$ (15.00)
$
2-4 X 8 BEAMS, TUBING HSS, 4X8X1/8=20'
LIN FT
20
$ (15.00)
$
Deck & Joist 10xx0
SQ FT
200
$ (5.00)
$
$
#11 CREDIT ON OVERHEAD FUEL
LABOR AND MATERIALS
UNIT
QTY
PRICE
TOTAL
CREDIT 50 LF OF 6" SDR FROM OVERHEAD FUEL
TO SAND OIL TRAP
UNIT
1
$ (11350)
$ (1,350)
$
$
SUBTOTAL
$ (1,350)
GRAND TOTALl $ 46,027
Page 2