ORDINANCE NO.2003-,,WA
AN ORDINANCE OF THE CITY OF DENTON, TEXAS AMENDING THE SCHEDULE OF
RATES CONTAINED IN ORDINANCE NO. 2002-267 FOR ELECTRIC SERVICE;
INCLUDING ALL PROVISIONS OF ORDINANCE NO. 2002-331 AS A PART OF THE RATE
ORDINANCE (SCHEDULE EP); PROVIDING FOR A REPEALER; PROVIDING FOR A
SEVERABILTTY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE.
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
CFCTT0N 1. That the Schedule of Rates for electrical services as provided for in Chapter
26 of the City of Denton Code of Ordinances, is amended to read as follows:
ELECTRIC RATE SCHEDULES
PAGE
R1
Residential Service Rate
2
R2
Residential Service Rate
4
TR
Residential Time of Use Rate
6
GSL
General Service Large
8
GSS
General Service Small
11
TGS
General Service Time of Use Rate
14
WK
Weekend Rate
18
Gl
Local Government Lighting & Power Service Rate
21
[City, County, Independent School District]
LS
Street Lighting
23
LT
Traffic Lighting
25
LO
Other Lighting
26
DD
Dusk -to -Dawn Lighting [Security Light]
27
DDL
Downtown Decorative Lighting
29
DGL
Decorative Ground Lighting
30
Tl
Temporary Service Schedule
32
PI
Interruptible Primary Service
34
ES
Standby, Supplementary and Maintenance Service
36
AF
Athletic Field
40
IDR
Industrial Development Rate
42
EP
EnergySave Program
43
MTR
Premium -Efficiency Motor Rebate
47
UPS
Uninterruptible Power Supply
49
ECA
Energy Cost Adjustment
51
Special Facilities Rider
52
Discount Rider for State Universities and Colleges
53
SCHEDULE RI
RF. IDENTTAL SE.R VICE RATE
(Effective 10/O1/03)
Applicable to all electric service used for residential purposes in a single family dwelling or an
individually metered apartment; supplied at one point of delivery and measured through one meter
where usage is not in excess of 700 KWH per 30-day month during the billing months of May
through O ctober. I f u sage i n any s uch m onth exceeds 700 KWH, billing will be rendered that
month under Rate Schedule R2 and thereafter for a period extending through the 12 billing months
of the next year ending with the October billing. Annually, in November, the customer may again
qualify for the Rl rate provided that consumption has not exceeded 700 KWH per 30-day month
during the previous six summer months.
Where individual dwelling units are being served through the same meter and the KWH in the
billing months of May through October exceed 700 KWH times the number of dwelling units, the
billing for that month and thereafter will be rendered under Rate Schedule R2.
(1) Facility Charge
(2) Energy Charge
(3) Energy Cost Adjustment
Facility Charge
$6.70 / 30 days
3.85¢ / KWH
Schedule ECA
The City will supply single-phase service at any standard voltages available from the City's
distribution system through one standard transformation.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
Ya
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for
longer or shorter billing periods using the following formula.
Formula:
Actual days in reading en .rind
x Customer Facility Charge
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
SCHEDULE R2
:7:G91�77t�YY/� :: a :� M-11
1 1 1
Applicable to any customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and
measured through one meter. Also applicable to any customer heating with electric energy,
resistance or heat pump. Not applicable to resale service in any event, nor to temporary, standby, or
supplementary service except in conjunction with the applicable rider.
(1) Facility Charge
Single -Phase
Three -Phase
(2) Energy Charge
First 1,000 KWH
Additional KWH
First 3,000 KWH
Additional KWH
(3) Energy Cost Adjustment
Single -Phase
Three -Phase
Billing months of
NOV. through APRIL
$ 7.73 / 30 days
$15.45 / 30 days
4.34¢ / KWH
3.94¢ / KWH
Schedule ECA
Facility Charge
Facility Charge
Billing months of
MAY through OCT.
$ 7.73 / 30 days
$15.45 / 30 days
5.61 ¢ / KWH
6.21 ¢ / KWH
Schedule ECA
0
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the C ity's distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may be required in advance.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the special facilities rider.
Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for
longer or shorter billing periods using the following formula:
Formula:
Actual days in reading period
x Customer Facility Charge
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
SCHEDULE TR
RF.STDEWTTAL TIME OF i TSF. R ATE
(Effective 10/O1/03)
Applicable to any customer for all electric service used for residential purposes in an individual
private dwelling or an individually metered apartment, supplied at one point of delivery and
measured through one meter. Customers applying for the TR rate must remain on this rate for
twelve (12) continuous billing periods. Not applicable to resale service in any event, nor to
temporary, standby, or supplementary service except in conjunction with the applicable rider.
(1) Facility Charge
Single -Phase $15.45 / 30 days
Three -Phase $20.60 / 30 days
(2) Energy Charge
On -Peak Hours 25.550 / KWH
Off -Peak Hours 1.410 / KWH
(3) Energy Cost Adjustment Schedule ECA
Facility Charge
Single-phase or three-phase at sixty (60) cycles at secondary distribution voltage. Where service of
the type desired by the customer is not already available at the point of service, special contract
arrangements between the City and the customer may first be required.
The City's on -peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday, starting on June 1 and continuing through
September 30 each year. The City's on -peak hours may be changed from time to time and the
customer will be notified twelve (12) months before such changes become effective.
The City's off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as
on -peak hours.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
Billing for the F acility C harge s hall b e b ased o n t welve (12) b illings annually and p rorated f or
longer or shorter periods using the following formula:
Actual dai c in reacting period
x Customer Facility Charge
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
SCHEDULE GSL
The GSL Rate is applicable to any commercial or industrial customer having a minimum actual
demand of 250 KVA or 225 KW for all electric service supplied at one point of delivery and
measured through one meter. Customers with an average actual demand equal to or greater than
200 KVA or 180 KW during the previous twelve month period may be allowed service under this
rate, subject to the minimum billing provision. Customers other than commercial and industrial
may be allowed service under this rate, subject to the minimum billing provision. Customers who
elect to discontinue service under this rate are ineligible for service under this rate for twelve
months. This rate is not applicable to resale service in any event, nor to temporary, standby, or
supplementary service except in conjunction with the applicable rider.
(1) Facility Charge $60.60 / 30 days
(2) Demand Charge $8.64 / KVA (Minimum of 250 KVA billed)
(3) Energy Charge (GL1) 1.41 ¢ / KWH
(4) Energy Cost Adjustment: Schedule ECA
An amount equal to the facility charge, plus a demand charge billed at the above KVA rate, where
demand is determined by whichever of the following methods yields the greatest result numerically:
(1) the actual monthly KVA demand; (2) 250 KVA; or (3) seventy percent (70%) of the maximum
monthly KW/KVA actual demand for any month during the previous billing months of May
through October in the twelve months ending with the current month.
Secondary or primary service available to commercial and industrial customers. Primary service is
rendered at one point on the customer's premises at a nominal voltage of 13,200 volts.
Customers who own, operate, and maintain all facilities necessary to receive three phase primary
voltage service and all transformation facilities required for conversion to utilization voltage shall
receive a discount of 0.3¢/KWH (GL3). Primary service customers utilizing City owned and
operated facility and transformation equipment necessary to receive primary voltage service shall
receive a discount of 0.1¢/KWH (GL2). The City shall own, operate and maintain all metering
facilities, either at primary or secondary voltage.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
The demand shall be determined by the KVA supplied during the fifteen (15)-minute period of
maximum use during the current month as determined by City's demand meter, but shall not be less
than 70% of the highest monthly KW/KVA actual demand determined during the billing months of
May through October in the twelve (12) months immediately preceding the current month. If the
current monthly demand is less than 250 KVA, and 70% of the actual demand determined during
the previous months of May through October is less than either 250 KVA or 225 KW, a minimum
of 250 KVA demand will be billed for the month. In all cases, 250 KVA is the minimum demand
billable under rate GSL.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
(a) Billing for the F acility c harge s hall b e b ased o n t welve (12) b illings a nnually a nd
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading period
x Customer Facility Charge
30 days
9
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading en ,rind x KVA Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
10
SCHEDULE GSS
G;F.NFRAT. SERVTCF. SMAT.T.
(Effective 10/01/03)
The GSS rate is applicable to any commercial or industrial customer having a maximum demand
less than 225 KW for all electric service supplied at one point of delivery and measured through
one meter. Not applicable to resale service in any event, nor to temporary, standby, or
supplementary service except in conjunction with the applicable rider.
(1)
(2)
(3)
(4)
Facility Charge
Single Phase
Three Phase
Demand Charge
Energy Charge (GS1)
Customer with 20 KW or below:
Block 1 - First 2,500 KWH
Block 2 - All Additional KWH
Customer above 20 KW:
Block 1 - First 2,500 KWH
Block 2 - Next 3,500 + B2T* KWH
Block 3 - All Additional KWH
$15.15 / 30 days
$20.20 / 30 days
$8.00 / KW
(First 20 KW not Billed)
6.750 / KWH
3.00¢ / KWH
6.75¢ / KWH
3.000 / KWH
2.65¢ / KWH
* The Block 2 Threshold (M) establishes the upper threshold for the Block 2 billing
rate above 6,000 KWH as a function of demand, and is determined by the following
formula:
B2T KWH = [(Actual KW Demand - 20) x 1901
No customer shall be billed for KWH not actually consumed.
Energy Cost Adjustment
Current ECA Schedule
11
An amount equal to the facility charge plus the greater of. (1) the actual monthly KW demand
charge, or (2) seventy percent (70%) of the maximum monthly actual demand charge for any month
during the previous billing months of May through October in the twelve (12) months ending with
the current month.
Secondary service available to commercial and industrial customers.
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at s ixty ( 60) c ycles and at any s tandard v oltages a vailable from t he C ity's distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may first be required.
Customers who own, operate, and maintain all facilities necessary to receive three-phase primary
voltage service and all transformation facilities required for conversion to utilization voltage shall
receive a discount of 0.3¢/KWH (GS3). Primary service customers utilizing City owned and
operated facility and transformation equipment necessary to receive primary voltage service shall
receive a discount of 0.1 ¢/KWH (GS2). The City shall own, operate and maintain all metering
facilities, either at primary or secondary voltage.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
The demand shall be determined by the KW supplied during the fifteen (15)-minute period of
maximum use during the current month as determined by City s demand meter, but shall not be less
than 70% of the highest monthly actual demand determned during the billing months of May
through October in the twelve (12) months immediately preceding the current month. Billing
demand shall be based on an adjusted KW demand which is the highest of the actual -monthly
demand, less 20 KW or 70% of the maximum monthly actual demand during the preceding months
of May through October, less 20 KW. In no case, shall billed demand be less than 0 KW.
In cases where the connected load is constant, the City may, at its option, estimate the KW demand.
For neon signs, one volt ampere shall be considered the equivalent of 3/4 watt.
12
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
(a) Billing for the F acility c harge s hall b e b ased o n t welve (12) b illings a nnually a nd
prorated for longer or shorter periods using the following formula:
Formula:
Aetna] days in reading period x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading period x Adjusted KW Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
13
SCHEDULE TGS
C>F.NFR AT. SF.R VTCF. TIME OF T NE R ATF
(Effective 10/01/03)
Applicable to any customer having a minimum demand of 250 KVA for all electric service
supplied at one point of delivery and measured through one meter, with the City providing all
facilities necessary to receive primary voltage service. S upplementary service will be available
subject to the applicable rider. Not applicable to resale or temporary service. Customers electing
this rate must remain on this rate for a minimum of twelve (12) continuous billing months.
(1) Facility Charge
(2) On -Peak Demand Charge
(3) Off -Peak (System) Demand
(4) Energy Charge
(5) Energy Cost Adjustment:
$70.70 / 30 days
$10.98 / KVA On -Peak Demand
$ 2.16 / KVA System Demand Charge
0.510 / KWH
Per Schedule ECA
The minimum monthly bill shall be the sum of the Customer Facility Charge, the Off -Peak Demand
Charge, and the On -Peak Demand Charge. The October through May demand charge shall be the
measured system demand, plus not less than 100% of the actual maximum monthly on -peak
demand for any month during the months of June through September in the twelve (12) months
immediately preceding the current month.
Secondary or primary service available to commercial and industrial customers. Primary service is
rendered at one point on the customer's premises at a nominal voltage of 13,200 volts.
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the C ity s distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may be required.
14
Customers who own, operate and maintain all facilities necessary to receive three-phase primary
voltage service and all transformation facilities required for conversion to utilization voltage shall
receive a discount of 0.301KWH (TG5 and TG6). If primary service is provided and the City owns
and operates all facilities and transformation equipment necessary to receive primary voltage
service, a discount of 0.1¢/KWH will be applied to the customer's bill (TG3 and TG4). The City
shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the
City's option.
The City's on -peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September. The
City's on -peak hours may be changed from time to time and the customer will be notified twelve
(12) months before such changes become effective.
The City's system ( off-peak) hours, for the purpose oft his r ate schedule, shall be all hours not
designated as on -peak hours.
The on -peak demand shall be determined by the KVA actual demand supplied during the fifteen
(15) minute period of maximum use each month during on -peak hours as recorded by the Citys
demand meter, but not less than one hundred percent (100%) of the actual maximum on -peak
demand similarly determined during the billing months of June through September in the twelve
(12) months immediately preceding the current month.
DF.TFRMTNATTON OF OFF-PEAK (SYSTEM) DEMAND
The off-peak demand shall be determined by the maximum KVA actual demand supplied during
the fifteen (15) minute period of maximum use during off-peak hours each month as recorded by
the City's demand meter. The off-peak demand will be billed every month.
DF.TERMTNATTON OF DEMAND RIT.T.TNO FOR CTTSTOMFRS WITH NO PEAK
DEMAND HTSTORY DI TRTNCT OFF-PEAK MONTHS
If the customer is new or does not have a history of on -peak use for June through September, and
elects to come on the TGS rate, the customer's billed demand shall be the off-peak demand billed at
the GSL demand rate. The off-peak demand will be billed every month at the GSL rate until the
customer establishes a separate on -peak and off-peak demand during an on -peak month. At this
time, both on -peak and off-peak demand will then begin billing at the TGS rate.
15
Customers requesting standby or supplementary power shall be allowed service under this rate
schedule; however, the determination of off-peak demand shall be adjusted to read:
The off-peak demand shall be the sum of the maximum KVA demand supplied during the fifteen
(15) minute period of maximum use as recorded by the Citys demand meter plus the KVA
nameplate rating(s) of the customer's generator(s). In the event the customer's generator(s) is/are
off-line at the time of the establishment of the maximum off-peak demand, the KVA nameplate
rating of the generator(s) unavailable for service shall be removed from the determination of the
off-peak demand.
All services which require special facilities in order to meet the customer's service requirements
shall be provided subject to the Special Facilities Rider.
(a) Billing for the Facility Charge shall be based on twelve (12) billings annually and
prorated for longer or shorter periods using the following formula:
Actual days in reading z .rind
x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30)-day-per-month basis and
prorated for longer or shorter billing periods using the following formula:
Actual days in reading period x KVA Billed Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
PIP
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
17
�14W11JgAVM
WFF.KF.ND R ATE
(EFFECTIVE 10/01/03)
Applicable to any commercial and industrial user whose maximum demand load occurs during the
period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a
demand load during the period from Sunday 12 midnight through Thursday 12 midnight that
exceeds 80% of the maximum demand load. Customers who violate the 80% requirement more
than four (4) times during the month, or more than twice on the same day of the week, during the
months of June through September, are ineligible for service under this rate for twelve (12) months.
Not applicable to resale service in any event, nor to temporary, standby or supplementary service
except in conjunction with applicable rider.
(1)
(2)
(3)
(4)
Facility Charge
Single -Phase $20.00 / 30 days
Three -Phase $25.00 / 30 days
Demand Charge $ 6.40 / KW
(First 20 KW not Billed)
Energy Charge (GS 1)
Customer with 20 KW or below:
Block 1 - First 2,500 KWH 6.75¢ / KWH
Block 2 - All Additional KWH 3.00¢ / KWH
Customer above 20 KW:
Block 1 - First 2,500 KWH 6.750 / KWH
Block 2 - Next 3,500 + B2T* KWH 3.00¢ / KWH
Block 3 - All Additional KWH 2.650 / KWH
* The Block 2 Threshold (132T) establishes the upper threshold for the Block 2 billing
rate above 6,000 KWH as a function of demand, and is determined by the following
formula:
B2T KWH = [(Actual KW Demand - 20) x 190]
No customer shall be billed for KWH not actually consumed.
Energy Cost Adjustment
Per Schedule ECA
Ell
An amount equal to the demand charge as calculated below plus $20.00/month for single -phase
service or $25.00/month for three-phase service, per thirty (30) day billing.
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the C ity's distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may be required.
Bills are due when rendered and become past due if not paid within fifteen (15) calendar days from
date of issuance.
The demand shall be determined by the KW supplied during the fifteen (15) minute period of
maximum use during the current month as determined by the City's demand meter. Billing shall be
based on an adjusted KW demand, which is the actual demand less 20 KW. The adjusted KW
demand will subsequently be used for billing the demand portion of the utility bill. hi no case, shall
billed demand be less than 0 KW.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
Billing for customer facility charge and demand shall be calculated on a thirty (30) day basis and
prorated for longer or shorter billing periods using the following formula:
(a) Billing - Customer Facility Charge shall be based on twelve (12) billings annually.
Formula:
Achial days in reading p rind
x Customer Facility Charge
30 days
19
(b) Billing - Demand Charge shall be based on twelve (12) billings annually.
Formula:
Actual days in reading nerinrl
'`— x Adjusted KW Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
20
SCHEDULE G1
• • I ' ►lu I a ►Y 10 ' • A 'WMEW
11 1
Applicable to any local City, County or School District for all electric service supplied at one point
of delivery and measured through one meter.
Not nnnlicahle to resale service in any event, nor to temporary, standby or supplementary service
except in conjunction with applicable rider.
NET MO
TH1.Y RATE
Facility Charge
(1)
Single -Phase
Three -Phase
(2)
Demand Charge
(3)
Energy Charge
(4)
MTNiMl TM
Energy Cost Adjustment
BIT IJNC;
$15.15 / 30 days
$20.20 / 30 days
$6.31 / KW
3.03¢ / KWH
Current ECA Schedule
An amount equal to the demand charge as calculated below, but not less than fifty percent (50%) of
the maximum monthly demand charge for any month during the previous billing months of May
through October in the twelve (12) months ending with the current month, plus the applicable
facility charge per thirty (30) day billing period.
The City will supply single-phase service (or three-phase service if available at the point of
delivery) a t s ixty ( 60) c ycles a nd a t a ny s tandard v oltages a vailable from t he C ity s distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may be required.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
21
The demand shall be determined by the KW supplied during the fifteen (15)-minute period of
maximum use during the current month as determined by City's demand meter, but not less than
50% of the highest monthly actual demand determined during the billing months of May through
October in the twelve (12) months immediately preceding the current month.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
(a) Billing for the F acility c harge s hall b e b ased o n twelve (12) b illings annually and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading} erind x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading en .rind x KW Billed Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
22
SCHEDULE LS
STRF.F.T T JC;HTTNt r
(Effective 10/01/03)
Applicable to all street lighting owned and maintained by the City of Denton.
(1) Facility Charge
RMTROMEN 111-1
WN
LSA
100 W Sodium Vapor
LSB
250 W Sodium Vapor
LSC
400 W Sodium Vapor
u
See table
Current ECA x Monthly Bulb Wattage Factor
$ 4.90 / 30 Days 48 KWH
$ 6.95 / 30 Days 105 KWH
$ 8.75 / 30 Days 159 KWH
LMA 175 W Mercury Vapor $5.65 / 30 Days 70 KWH
LMB 250 W Mercury Vapor $6.70 / 30 Days 98 KWH
LMC 400 W Mercury Vapor $8.50 / 30 Days 153 KWH
LMD 1,000 W Mercury Vapor $15.45 / 30 Days/380 KWH
The City will supply single-phase service (or three-phase service if available at the point of
delivery) at sixty (60) cycles and at any standard voltages available from the C ity's distribution
system through one standard transformation. Where service of the type desired by the customer is
not already available at the point of service, special contract arrangements between the City and the
customer may first be required.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
0491
a) Billing for the Facility Charge shall be based on twelve (12) billings annually and
prorated for longer or shorter periods using the following formula:
Actual days in reading period
x # of lights per type x
30 days Customer Facilities Charge
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
`�!
SCHEDULE LT
TR AFFTC I JGHTTNC
(Effective 10/01/03)
Applicable t o S tate and L ocal G ovemment a gencies t hat o perate and m aintain t heir o wn traffic
signals.
All KWH
5.30¢ / KWH
At the City's available secondary voltage and phase.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
Maintenance expenses billed at cost.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
25
SCHEDULE LO
OTHER I JCT14TTNCi
(Effective 10/01/03)
LOA
APPT.TCATTON
Applicable to State and Local Government agencies that install and maintain their own street lights,
other than the City of Denton.
LS1
250 W Sodium Vapor
LS2
400 W Sodium Vapor
LMl
400 W Mercury Vapor
LM2
1,000 W Mercury Vapor
Applicable to other unmetered lighting services.
NFT MONTHT.Y RATE.
5.300 / KWH
5.300 / KWH
5.300 / KWH
5.300 / KWH
Total Watts x Hours used per Month x KWH Rate
1,000
At the City s available secondary voltage and phase.
BULB WATTAGE
FACTOR
105 KWH
159 KWH
153 KWH
380 KWH
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
Maintenance expenses billed at cost.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
A charge per KWH of energy taken for fuel cost calculated in accord with Schedule ECA.
26
SCHEDULE DD
TH ISK TO DAWN T .Tt THTTNC,
[SECURITY LIGHT]
(Effective 10/01/03)
Applicable to any customer within the area s erved b y the C ity's a lectric d istribution s ystem for
outdoor area lighting when such lighting facilities are operated as an extension of the City s
distribution system.
DIE a .- -M
DJEW
If ni
DSA
100 W Sodium Vapor
DSB
250 W Sodium Vapor
DSC
400 W Sodium Vapor
DHA
250 W Metal Halide
DHB
400 W Metal Halide
Restricted 10/1/97:
DMA 175 W Mercury Vapor
DMB 250 W Mercury Vapor
DMC 400 W Mercury Vapor
See table
Current ECA x Monthly Bulb Wattage Factor
$7.75 / 30 Days
$10.05 / 30 Days
$12.35 / 30 Days
$12.05 / 30 Days
$14.35 / 30 Days
$6.45 / 30 Days
$7.50 / 30 Days
$8.35 / 30 Days
48 KWH
105 KWH
159 KWH
105 KWH
159 KWH
70 KWH
98 KWH
153 KWH
The City shall fiunish, install, maintain and deliver electric service to automatically controlled,
mercury or sodium vapor 1 ighting f ixtures c onforming t o t he C ity's s tandards a nd s ubj ect t o i is
published rules and regulations.
Where necessary for proper illumination or where existing poles are inadequate, the City will install
or cause to be installed, one (1) pole for each installed light, at a distance not to exceed eighty (80)
feet from said existing lines, at no charge to the customer. Each additional pole span shall not
exceed a span spacing of one hundred (100) feet. Additional poles required to install a light in a
customer's specifically desired location, and not having a light installed on same, shall bear the cost.
27
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
A two (2) year contract shall be agreed to and signed by each customer desiring Dusk -to -Dawn
Lighting Service authorizing fixed monthly charges, which may be reviewed annually, and to be
applied to the monthly municipal utilities bill. In the event that a customer desired the removal of
the unit or discontinuance of the service prior to completion of two (2) years, the remainder of the
contract period shall become due and payable. After the end of the initial two (2) year contract,
service shall continue on a month- to -month basis and may be canceled by either party upon thirty
(30) days notice.
All service which requires special facilities in order to meet the customer's service requirements
shall be provided subject to the Special Facilities Rider.
Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for
longer or shorter billing periods using the following formula:
Formula:
Achial days in reading period
x Customer Facility Charge
30 days
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
iiW
F.Y•111 s1111L O2137I
1 1 1
Applicable to any customer on the perimeter of the square served by the City s electric distribution
system for outdoor area lighting when such lighting facilities are operated as an extension of the
City's distribution system.
NET MONTHLY R ATE
(1) Facility Charge
(2) Energy Cost Adjustment
$3.85 / 30 Days
Current ECA x Monthly Bulb Wattage Factor,
based on 415 KWH per Customer
The City shall famish, install, maintain and deliver electric service to automatically controlled
lighting fixtures conforming to the City's standards and subject to its published rules and
regulations. The service is provided between dusk and midnight.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
All service which requires special facilities in order to meet the customer's service requirements
shall be provided subject to Special Facilities Rider.
Billing for the F acility C harge s hall b e b ased o n t welve (12) b illings a nnually a nd p rorated for
longer or shorter billing periods using the following formula:
Formula:
Actual days in reading period x Facility Charge
30 days
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
29
SCHEDULE DGL
► Uwe] :_ ► ► :• of.iIII e. W I ON
Applicable to any customer using ground lighting served by the City's electric distribution system
for outdoor area lighting. The customer owns, operates, and maintains the decorative ground
lighting upon installation by the City of Denton.
(1) Facility Charge (Meter) $6.70 / 30 Days
Facility Charge (Per Light)
50 W Sodium Vapor Beacon $2.15 / 30 Days
50 W Spot $1.70 / 30 Days
70 W Sodium Vapor Ballard $4.50 / 30 Days
100 W Sodium Vapor Ballard $4.50 / 30 Days
(2) Energy Charge 3.79 cents / KWH
The City shall furnish and install light fixtures, and deliver electric service to automatically
controlled lighting fixtures conforming to the City of Denton's standards and subject to its
published rules and regulations. The service is provided between dusk and dawn.
At the end of ten (10) years, the facility charges per light will be discontinued.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
The installation costs will be calculated by the City. The customer is responsible for installation
costs at the City's discretion.
me
All service which requires special facilities in order to meet the customer's service requirements
shall be provided subject to the Special Facilities Rider.
A ten (10) year contract shall be agreed to and signed by the customer desiring Decorative Ground
Lighting Service authorizing fixed monthly meter charges, which may be reviewed annually, and to
be applied to the monthly municipal utilities bill. The monthly per light facility charge will not
change during the ten (10) year contract period. In the event that a customer desired the removal of
the unit or discontinuance of the service prior to completion of ten (10) years, the remainder of the
contract period shall become due and payable. After the end of the initial ten (10) year contract,
service shall continue on a month- to -month basis and may be canceled by either party upon thirty
(30) days notice.
Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for
longer or shorter billing periods using the following formula:
Formula:
Actual days in reading peTiod
x Customer Facility Charge
30 days
31
SCHEDULE T1
KVIATA WAVAJ��
Applicable when a customer requests electric service on a short term or temporary basis where a
customer has received a permit from the City of Denton's Building hispections Department. This
rate is not applicable after the certificate of occupancy has been issued.
NET MONTHLY R ATE
(1) Facility Charge
Single -Phase
Three -Phase
(2) Energy Charge
(3) Energy Cost Adjustment
MTNTMT TM RTT.T.TNC;
Facility Charge.
TYPE. OF SF.RVTCE.
At the City s available secondary supply.
ADDITIONAL TEMPORARY SERVICE. CHARGES
$15.15 / 30 days
$20.20 / 30 days
6.77¢ / KWH
Current ECA Schedule
Labor (Regular Time) $60.00 minimum up to 1 hour. $60.00 for each additional hour
(to be measured to the nearest one -quarter hour).
Labor (Overtime) $75.00 minimum up to 1 hour. $75.00 for each additional hour
(to be measured to the nearest one -quarter hour).
Premium time to be added where applicable.
Transportation To be billed by hours or miles, as applicable, according to the
estimated cost of operating the equipment.
32
Material Material that cannot be salvaged to be billed at stores cost plus
25% plus applicable sales tax. At the time a temporary service is
removed or converted, any loss in t he in aterial i nstalled d ue t o
negligence or willful action by the customer will be billed
separately to the customer at replacement cost plus 25% and sales
tax.
All services which require special facilities in order to meet the customer's service requirements
shall be provided subject to the Special Facilities Rider. See Section 25-23(e) for the standard
requirements.
Applicable to new construction of underground residential electric service only.
Rate: A flat fee of $195 per lot payable when the customer applies for temporary service.
Billing for the Facility charge shall be based on twelve (12) billings annually and prorated for
longer or shorter periods using the following formula:
IVOTMOOMPI
Actual days in reading period
x Customer Facility Charge
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
33
SCHEDULE P1
Applicable to all c ustomers t aking p rimary s ervice a t a firm p ower 1 oad a xceeding 1,000 KVA
during the months of June, July, August and September and is, by contract, provided service subject
to load interruptions. The City retains the right to limit the number of customers on this rate if the
City's load reduction goals are met.
NF.T MQ' rTH V Cat,*ARGF (Estimated Transmission Firm)
(1) Facility Charge
(2) Energy Charge
(3) Demand Charge
(4) Energy Cost Adjustment
$70.70 / 30 days
0.200 / KWH
$3.78 / KVA
Current ECA Schedule
An amount equal to the demand charge as calculated below but not less than one hundred percent
(100%) of the maximum monthly KVA similarly determined during the previous billing months of
May t hrough O ctober i n t he t welve months ending with the current month, nor less than 1,000
KVA.
Interruptible primary voltage service (transformation equipment owned by customer) is available to
any customer with a twelve (12)-month minimum monthly demand of 1,000 KVA or greater.
Interruptible primary service rendered at one point on the customer's premises at a nominal voltage
of 13,200 volts or 69,000 volts three-phase at the option of the utility.
The primary voltage service customer shall own, operate, and maintain all facilities necessary to
receive three-phase primary voltage service and all transformation facilities required for conversion
to utilization voltage. The City shall own, operate and maintain all metering facilities, either at
primary or secondary voltage, at the City's option. Where the City elects to meter at secondary
voltage, two percent shall be added to the demand charge, the energy charge, and the energy cost
adjustment charge to account for transformer losses.
34
The demand shall be determined by the KVA supplied during the fifteen (15) minute period of
maximum use during the current month as determined by City's demand meter, but not less than
100% of the maximum monthly KVA similarly determined during the billing months of May
through October in the twelve months immediately preceding the current month, nor less than 1,000
KVA.
All service which requires special facilities in order to meet the customer's service requirements
shall be provided subject to the Special Facilities Rider.
(a) Billing for the F acility c harge s hall b e b ased o n t welve (12) b illings annually a nd
prorated for longer or shorter billing periods using the following formula:
Formula:
Aetnal days in reading period
x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
1010MMO
Actual da)m in reading elL rind x KVA Demand x KVA Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH x KWH Rate
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
35
SCHEDULE ES
►IY : 1' ' u ►Y :: : ►IY u : 1►Y ► : ►
1 1 1 Mn
Applicable in all areas served by the City to customers who:
(1) Own and/or operate an electric power generation facility mainly used for non -
emergency uses and which has a total nameplate or effective capacity (whichever is
lesser) of fifty (50) KVA or more in parallel with the City's electric system for the
purpose of generating power for the customer's own consumption, and
(2) Employ equipment which is compatible with the City's electric system at the
customer's delivery point and which will cause no damage to the City's electric system
or equipment or present undue hazards to City personnel, and
(3) Own and/or operate an electrical generating facility which has been certified annually
by a registered professional engineer practicing in the utility or Independent Power
Production Industry to be a functioning and reliable generating facility.
(4) Operate an electrical power generating system at least 6,500 hours annually.
(5) Execute an agreement for interconnection and parallel operation with the City.
The customer shall reimburse the City for any equipment or facilities required as a result of the
installation by the customer of generation in parallel with the City's electric system.
The customer shall pay all costs of the City to extend its facilities or modify them at the time of
interconnection, or at some fixture time in order to permit parallel operation of the customer's
facility.
The City shall supply alternating current at sixty (60) cycles and at the voltage and phase of the
City's electric system most available to the location of the customer. The primary voltage customer
shall own, operate and maintain all facilities necessary to receive three-phase primary voltage
service and all transformation facilities required for conversion to utilization voltage. The City
shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the
City's option. Where the City elects to meter at secondary voltage, the secondary energy and on -
peak demand charges shall apply.
NEM
Primary
SPNice
(1) Facility Charge $60.60 / 30 days
(2) Demand Charges:
On -Peak Demand $10.30 / KVA
Off -Peak Demand $3.80 / KVA
(3) Energy Charges:
Non -Emergency Energy 0.20¢ / KWH
Emergency Energy 5.250 / KWH
(5) Energy Cost Adjustment Current ECA
Secondary
Servine,
$25.25 / 30 days
$10.30 / KVA
$3.80 / KVA
0.51¢ / KWH
5.35¢ / KWH
Current ECA
If the sum of the Customer Facility Charge, the On -Peak Demand Charge, and the Off -Peak
Demand Charge is less than $1.00 per KVA of installed transformer capacity, $1.00 per KVA of
installed transformer capacity will be the monthly charge.
The minimum monthly billing shall be the higher of the following:
(1) The sum of the Customer Facility Charge, the On -Peak Demand Charge, and the Off -
Peak Demand Charge; or
(2) A charge of $1.00 per KVA of installed transformer capacity.
The on -peak demand shall be determined by the KW demand supplied by the City during the
fifteen (15) m inute p eriod o f m aximum u se d uring t he o n-peak hours as recorded by the City's
demand meter, but not less than one hundred percent (100%) of the maximum on -peak demand
which occurred during the billing months of June through September in the twelve (12) months
immediately preceding the current month.
37
If a customer's cogeneration unit(s) is/are off during peak hours, and the customer's peak did not
contribute to the City's annual off-peak demand, and the cogeneration unit is one (1) MW or larger,
then the nameplate rating of the customer's unit(s) shall be deducted from the peak demand.
The customer shall be charged the appropriate on -peak demand charges for the KW supplied by the
City for the succeeding twelve (12) months.
The off-peak demand shall be determined by the sum of the KW demand supplied during the fifteen
(15) minute period of maximum use as recorded by the Citys demand meter, plus the KW
nameplate rating(s) of the customers generator(s). In no event shall the off-peak demand be less
than seventy percent (70%) of the maximum on -peak demand similarly determined during the
billing months of June through September in the twelve (12) months immediately preceding the
current month.
All energy supplied to customers whose generating units are less than one (1) MW capacity.
Emergency energy is all energy supplied by the City during peak hours of operation to displace
energy normally supplied by the customer's one (1) MW or larger unit.
The City's on -peak hours, for the purpose of this rate schedule, are designated as being from 2:00
P.M. to 7:00 P.M. each Monday through Friday.
The City's off-peak hours, for the purpose of this rate schedule, shall be all hours not designated as
on -peak hours.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
NE
(a) Billing for demand shall be calculated on a 30 day per month basis and prorated for
longer or shorter billing periods using the following formula:
Actual . days in readings x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
Actual days in readings rind x KW Billing Demand x Rate
30 days
Billing for energy shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
If Customer -produced energy is fed back into the City's system during on -peak hours, an amount
equal to fuel cost calculated in accordance with Schedule ECA, as applicable to such energy is
credited monthly, provided that Customer has paid the City for necessary added metering,
protective and other equipment as determined by the City.
If Customer -produced energy is fed back into the City's system during off-peak hours, an amount
equal to 70% of the billed ECA charge per KWH (for each KWH delivered back into the City's
system) will be credited monthly, provided that Customer has paid the City for necessary added
metering, protective and other equipment as determined by the City.
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
39
SCHEDULE AF
AT14T.ETTC FIELD
(Effective 10/01/03)
APPT.TCATTnN
Applicable to all electric service metered at one point for use to light specified areas for athletic
events where such electrical use will not occur between the hours of 2:00 P.M. and 7:00 P.M. for
the months of June through September.
NET MONTHT .Y RATE
(1) Facility Charge
Single -Phase
Three -Phase
(2) Energy Charge
$20.20 / 30 days
$30.30 / 30 days
Rilling months of June through September-
2:00 PM to 7:00 PM (Peak) 7.580 / KWH
All Other Hours (Off Peak) 3.790 / KWH
Billing months of October throe May:
All hours 3.79¢ / KWH
(3) Demand Charge
Billing months of hme through September -
Peak (2:00 PM - 7:00 PM) $4.70 / KW
All Other Hours (Off Peak) $1.11 / KW
Riles months of October through Mav
All hours $1.11 / KW
(4) Energy Cost Adjustment Current ECA Schedule
W
MTNIMI lu BIT LIN Facility Charge
At the City s available secondary voltage and available phase. For use only between the hours of
7:00 P.M. and 2:00 P.M. from June through September and all hours from October through May.
All services which require special facilities in order to meet customer's service requirements shall
be provided subject to the Special Facilities Rider.
(a) Billing for the F acility c harge s hall b e b ased o n t welve (12) b illings annually and
prorated for longer or shorter periods using the following formula:
Formula:
Actual days in reading en .rind
x Customer Facility Charge
30 days
(b) Billing for demand shall be calculated on a thirty (30) day per month basis and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading} rind x KW Demand x Rate
30 days
Billing for the energy charge shall be based on actual KWH consumption during the billing period.
Formula:
KWH in rate block x Rate per KWH in rate block
A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA.
41
SCHEDULE IDR
104I0MORMAZIRGUILMIMOMMA-11
MAlm WAI^F,
This rider is available to the customers who receive service from Rate Schedules GSS, GSL, or
TGS.
This rider is available to electric service supplied at any one location. It is for firm electric service
applicable to new and existing customers as described below, over a five-(5) year period. This rider
is available to the following classes of customers:
(1) New customers whose electric service represents demand not previously served by
the City at any location in the City's service area in the last twelve (12) months, where
such metered demand will be in excess of 225 KVA or 200 KW, as estimated and
mutually agreed upon by the Director of Electric Utilities and the customer.
(2) Existing customers served under Rate S chedules G SS, G SL o r T GS w ho i ncrease
their prior existing metered demand by 225 KVA or 200 KW. This increase shall be
verified by comparing a three-month rolling average of the new level of demand to
the prior demand averaged for corresponding months. During periods in which this
verification method cannot be applied, the Director of Electric Utilities and the
customer may develop a mutually agreed -upon formula to estimate the base and
additional demand levels.
The customer shall be charged under the appropriate applicable rate schedules with the exception
that the monthly billing demand (For GSS and GSL) or system demand and on -peak demand (for
TGS) will be adjusted in accordance with the following table:
Time Perind
Reduction to Billing
Demand or System Demand
First Year
50%
Second Year
40%
Third Year
30%
Fourth Year
20%
Fifth Year
10%
The term of the contract will be for five (5) years.
42
SCHEDULE EP
F.NFR GYS A VF PR OC;R M
(Effective 10/O1/03)
Denton Municipal Electric ("DME") through this program, called "EnergySave", is offering cash
payments as incentives in the form of rebates to customers who purchase and install high -efficiency
air conditioners or heat pumps for existing residential or commercial facilities. This program will
also provide structure incentives in the form of rebates, in the amount of $2,000 per qualifying
structure, to residential builders of single-family residences for meeting specific DME structure
requirements. Satisfying these construction requirements will improve a residential structure's
heating and cooling systems' operating efficiency. Apartments and multiple unit residential
structures will qualify for the air conditioner rebates, but will not qualify for the structure incentive,
if they meet the applicable EnergySave Program Guidelines.
The EnergySave Program's objectives are primarily to reduce energy demand and consumption,
thereby allowing the customers of DME to save dollars on their utility bills, reducing the peak load
of the City of Denton's electric system, and promoting energy efficient heating and cooling. The
EnergySave Program will be in effect each fiscal year beginning on October 1, until the allotted
funding is depleted. At the time the funds are depleted, no additional applications for participation
will be accepted until the next fiscal year.
A. All installations must be for accounts served by the DME and must meet all applicable
national, local, and manufacturers' codes and specifications.
B. To qualify for the equipment incentive, the equipment must be new when installed.
C. All equipment must be purchased. No leased or lease/purchased equipment will
qualify for a cash rebate.
D. Installations must be made by licensed contractors and/or dealers.
E. No rebate will be paid on a partial replacement of an air conditioner. The condenser
unit and the evaporator coil must be replaced to qualify for a rebate.
F. Requests for payment must be received by DME within thirty (30) days of installation.
G. Equipment and installation must be permitted and inspected by the City's Building
Inspection Department before final approval for payment is issued.
43
H. The EnergySave Program guidelines and payments are subject to change by DME
without prior notice.
I. DME may, at any time, discontinue the EnergySave Program without prior notice.
J. Payments shall be credited to the recipients' utility account with DME.
11MLgTM[11TMnGWM= mr4NW&Tu =
A. $2,000.00 per qualifying structure is offered to a builder or authorized agent.
B. Builder, or authorized agent, must be enrolled in the Denton Municipal Electric
EnergySave Program (EnergySave).
C. Each home participating in the EnergySave program must be registered with DME prior
to construction and must also comply with the 2000 IECC requirements relating to
residential structures.
D. Install a 1.5-ton or above central air conditioner or heat pump having a minimum
efficiency rating of 14 SEER.
E. Install minimum insulation of
R49 — ceiling (uniform application)
R30 — under decking
R30 — cathedral or vaulted ceiling
R30 — floor
R13 — wall cavity
Insulation should not contact radiant barrier roof decking.
F. Exterior glass must meet minimum high efficiency standards
0.4 or below — solar heat -gain coefficient
0.4 or below — U-factor
G. Programmable Thermostat — EnergyStar approved
H. Radiant Barrier Decking
Must maintain air gap between insulation and decking
I. Acceptable attic ventilation
One square inch of ventilation per square foot of attic floor, or rate of air exchange
of entire volume of attic air once at per minute
m
J. Structure Incentives for new homebuilders must also comply with the respective
restrictions and guidelines set forth by the International Residential Code (IRC).
KNOMMMMUMMOR
A. Application
1. Equipment:
An application for equipment incentive must be completed and sent to Denton
Municipal Electric within sixty (60) days of installation of new or replacement
equipment. Participating dealers have application forms and will complete
these forms for the purchaser. It is the purchaser's responsibility to see that
the dealer completes the form and submits it to DME. All submissions are
subject to lawful verification of identification and entitlement to the
EnergySave credit by Denton Municipal Electric.
2. Structure Incentive:
To qualify for residential structure incentives, a builder/developer or authorized
agent must be registered as an authorized Denton Municipal Electric
EnergySave Authorized Builder. To become a recognized EnergySave builder,
applicant must complete and submit a Denton Municipal Electric EnergySave
Builder Application form to the Director of Electric Utilities. Applicant must
also meet the requirements listed in the IECC and EnergySave guidelines.
B. Inspections
Installations of central air-conditioning systems must be permitted and will be
inspected by the City's Building Inspection Department, and must be approved before
rebates will be processed. All submissions are subject to lawful verification of
identification and entitlement to the EnergySave credit by Denton Municipal Electric.
New structures will be randomly audited to insure adherence to the required energy
efficient construction specifications.
C. Payments to Participants
Equipment Retrofit (Existing residences)
Cash payments will b e m ade t o t he p urchaser o f t he q ualifying r eplacement
equipment. Participating retail equipment dealers will receive a cash payment
of $20 per unit for the sale of window units, central air conditioning systems, or
heat pumps to offset their cost for properly filling out the applications for
purchasers of retrofit equipment. All submissions are subject to lawful
verification of identification and entitlement to the EnergySave credit by
Denton Municipal Electric.
45
2. New equipment and structure incentive
Program participants are responsible for submitting the correct information.
DME will not issue any additional payment unless the payment was incorrect
due to a mistake in processing by a City employee. The twenty -dollar ($20.00)
payments to dealers will be made only if they supply the qualifying equipment
to the customer or builder who is paying for the installation of the equipment.
Dealers and purchasers may be denied payment for failure to follow program
guidelines such as: failing to supply correct SEER/EER figures; installing
equipment which is not new; replacing part of a split system; or failure to fill
out rebate forms properly. All submissions are subject to lawful verification of
identification and entitlement to the EnergySave credit by DME. Payments
will be made to customers who purchase and install new qualifying equipment.
If a tenant purchases and installs qualifying equipment, the payment is made to
the t enant. I f t he o wner o f r ental p roperty p urchases a nd i nstalls qualifying
equipment, the payment is made to the owner.
'.. s WMI - I
Central Air Conditioning
Central Heat Pumps
Geothermal Heat Pump
Room Air Conditioners
Room Heat Pumps
SEER/EER
Rating
14.0 +
14.0 +
14.0 +
12.0 +
12.0 +
TnrentivP
$600/unit
$700/unit
$700/unit
$50/unit
$50/unit
m
SCHEDULE MTR
77�ullu :� �I�►� u• •: �i:
1 1 1
The City of Denton Utility Department is offering cash payments to customers who purchase and
install premium -efficiency motors and adjustable speed drives in facilities serviced by Denton
Electric Utility.
The program's objective is to reduce energy demand and consumption, thereby saving customers
dollars on their utility bills and reducing the peak load of the City of Denton's electric system, thereby
conserving energy and improving the power factor.
1. All installations must be for accounts served by the City of Denton Electric Utility
and must meet all applicable national, local, and manufacturers' codes and
specifications.
2. To qualify for a rebate, equipment must be new when installed. All equipment must
be purchased. No leased or lease/purchased equipment will qualify for a cash rebate.
Removed motors must be properly disposed of after inspection and not re -used with
the Denton Electric Utility system. Method of disposal must be stated.
3. The City will pay the rebate to the purchaser of the qualifying equipment upon
verification of compliance with program guidelines.
4. Equipment and installation are subject to inspection by the City's Electric Utility
before final approval for payment is issued.
Replacement motors must be the same horsepower or lower than the original motor.
Exceptions must be approved in writing by the Citys Electric Utility. Only motors 20
horsepower and above are eligible for the program.
6. All information must be complete on the Motor Rebate Application in order for a
rebate to be issued (see Motor Rebate Application).
The Premium -Efficiency Motor Rebate program guidelines and payments are subject
to change without notice. This program may be discontinued with prior notice, at any
time by the City of Denton Electric Utility.
47
Rebates for the Premium -Efficiency Motor Rebate Program will be based on the following
methodology:
REPLACEMENT MOTORS:
1. The Denton Electric Utility staff will visit the site to determine the existing motor's
efficiency. If the existing motor is non -operational, an estimate will be made.
2. The customer must provide all information on the rebate application concerning the
proposed motor purchase.
3. A new motor must not exceed the horsepower of the existing motor without express
written consent by the Denton Electric Utility, which consent shall be given only if
the utility finds an increased efficiency.
4. The information concerning the existing and the proposed motors will be entered into
the Motor Master software program to calculate the kilowatt (KW) or kilovolt
amperes (KVA) savings yield. The calculation is based on horsepower, efficiency,
RPM, and load information.
5. The KW or KVA yield will be multiplied times the rebate incentive amount of
$100/KW or $90/KVA:
KW yield x $100 / KW
or KVA yield x $ 90 / KVA
6. The Denton Electric Utility will to the site to verify installation, and following
successful installation, a rebate check will be mailed to the customer.
NEW MOTORS:
New motors will follow the procedure outlined above for replacement motors but the
efficiency comparison will be made against a standard new motor, to be determined by the
Motor Master software program used by the City, Department of Energy standards, or the
Denton Electric Utility.
ADJUSTABLE SPEED DRIVES:
The Denton Electric Utility will visit the customer site to determine KW/KVA savings from
the proposed Adjustable/Variable Speed Drive. Those savings will be awarded on a
$100/KW or $90/KVA basis. A watt -meter will be used before and after installation.
KW / KVA SAVINGS:
Rebates in excess of $1,000.00 require advance approval of the Director of Electric Utilities.
M
SCHEDULE UPS
1 1 1
Applicable to any customer who, by written agreement, receives service for an uninterruptible power
supply for a computer or other electrical equipment. Uninterruptible Power Supplies provided by the
City of Denton are of the standby type.
(1) Facility Charge:
0 - 300 Watts Uninterruptible Power Supply $7.80 / 30 days
301 - 700 Watts Uninterruptible Power Supply $14.90 / 30 days
701 - 1,200 Watts Uninterruptible Power Supply $31.85 / 30 days
(2) Installation Charge $25.75
For any Uninterruptible Power Supply other than above, the monthly customer charge will be
based on the following formula:
(1) Monthly Charge:
Annual Maintenance
12 months
8% Interest on a 5 Year Life
The City shall furnish, install, maintain an automatically controlled alternating current power backup
unit conforming to the City's standards and subject to its published rules and regulations.
Bills are due when rendered, and become past due if not paid within fifteen (15) calendar days from
date of issuance.
GN
All services which require special facilities in order to meet customer's service requirements shall be
provided subject to the Special Facilities Rider.
(a) Billings for the Facility charge shall be based on twelve (12) billings annually and
prorated for longer or shorter billing periods using the following formula:
Formula:
Actual days in reading_period x Customer Facility Charge
30 days
-M
SCHEDULE ECA
All m onthly K WH c barges s hall b e i ncreased o r decreased by an amount equal to "X" cents per
KWH, to be known as the energy cost adjustment (ECA). The ECA shall be computed during the
last month of each fiscal year quarter (December, March, June and September) to be applied to the
quarter immediately following. The City shall in no case change the energy cost adjustment more
than once in any three (3) month period. The ECA shall be calculated using the following formula:
WMrzarzrl ff9Irz?M_VWI'M N
Projected KWH sales for next quarter
In the event that actual plus estimated cumulative costs of fuel, variable costs of Texas Municipal
Power Agency (TMPA) energy and purchased energy (excluding TMPA's fixed charges) are greater
than or less than the actual and projected ECA revenues by $500,000 or more during the next quarter,
the Director of Electric Utilities or her designate shall recompute the Energy Cost Adjustment and,
with Public Utilities Board approval, may establish an ECA that collects or returns such difference
over the next three month period. Such change in ECA shall be applied evenly to each month during
the three-month period.
51
SPECIAL FACILITIES RTDF.R
(Effective 10/01/03)
(1) All service shall be offered from available facilities. If a customer service
characteristic requires facilities and devices which are not normally and readily
available at the location which the customer requests service, then the City shall
provide the service subject to paragraph (2) of this rider.
(2) The total cost of all facilities reburied to meet the customer's load characteristics
which are incurred by the City shall be subject to a special contract entered into
between the Utility and the customer. This contract shall be signed by both parties
prior to the City providing service to the customer.
52
1] 6YK1] Il►`Y 11;717�a31 :
1►t I : : ► 1 /
1 1 1
Service provided herein is applicable to electric service billed under the otherwise applicable tariffed
rate for service supplied to a facility of a "four year state university upper level institution, the
University of North Texas, Texas Woman's University or college" as provided in Section 2.2141,
under Subtitle E, Title H, Public Utility Regulatory Act of 1995.
Customer's monthly bill and/or monthly rate shall be in accordance with the applicable rate
schedule(s) in effect on July 1, 1997, shall be reduced by 20%.
"Base Rates" are defined as the sum of the following charges: the Facility Charge, the Demand
Charge, the Energy Charge and/or the adjustment for short/extended read cycles of the applicable rate
schedules. Base rates do not include recovery of fuel and purchased energy costs, including, without
limitation, energy cost adjustments (the ECA rate or its successors).
All other charges and calculations in the rate schedule are unchanged.
The rates initially established on July 1, 1997 by this Discount Rider shall be the maximum or ceiling
rate charged to the University of North Texas ("UNT") and Texas Woman's University ("TWU")
during the term of the seven (7) year power supply agreement. If during the term of the power supply
agreement any applicable tariffed "Base Rates" are reduced by more than 10%, the discounted rates
for UNT and TWU will be reduced such that the discounted "Base Rates" are always at least 10%
below any tariffs that will otherwise be applicable to the universities. At no time shall tariffed base
rate decrease cause the rate discount to the two (2) universities to decrease by more than 50% over
the term of the power supply agreement.
53
SECTION 2. That the Assistant City Manager for Utilities is hereby authorized to expend
funds to issue rebates to electric utility customers in the form and type set forth in Schedules EP and
MTR, as the use of more efficient air conditioning compressors, heat pumps, motors, and thermal
storage is in the best interest of the City of Denton, as such will reduce the peak -load and conserve
energy, which are public purposes of the City.
SFCTION I. That all ordinances or parts of ordinances in force when the provisions of
this ordinance became effective which are inconsistent, or in conflict with the terms or provisions
contained in this ordinance are hereby repealed to the extent of any such conflict.
SECTION 4. That if any section, subsection, paragraph, sentence, clause, phrase or word in
this ordinance, or application thereof to any person or circumstances is held invalid by any court of
competent jurisdiction, such holding shall not affect the validity of the remaining portions of this
ordinance, and the City Council of the City of Denton, Texas, hereby declares it would have enacted
such remaining portions despite any such invalidity.
SECTION 5- That this ordinance and the rates herein adopted shall become effective,
charged, and applied to all electric services rendered by Denton Municipal Electric, and all energy
usage by customers of Denton Municipal Electric on and after October 1, 2003; and a copy of said
rates shall be maintained on file in the Office of the City Secretary.
PASSED AND APPROVED this the day of 46 2003.
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
By:
APPROVED AS TO LEGAL FORM:
HERBERT L. PROUTY, CITY ATTORNEY
By:�
SAOur Documents\Ordinances\030ectric Rate Ordinance 2003.doc
G A 4
EULINE BROCK, MAYOR
6701