HomeMy WebLinkAbout2002-191ORDINANCE NO. OD 'l _/ I
AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS TO THE
CONTRACT BETWEEN THE CITY OF DENTON AND PHARLAP CONSTRUCTION INC.;
PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING AN EFFECTIVE
DATE; (CHANGE ORDER NUMBER ONE IN THE AMOUNT OF $139,613, CHANGE ORDER TWO IN
THE AMOUNT OF $3,058 AND CHANGE ORDER THREE IN THE AMOUNT OF $4,392).
WHEREAS, on March 26, 2002 by Ordinance No. 2002-079, the City awarded a public works
contract to Pharlap Construction, Inc., in the amount of $2,610,600 for the Denton Solid Waste Facility;
WHEREAS, the Staff having recommended, and the City Manager having recommended to the
Council that a change order be authorized to amend such contract agreement with respect to the scope of
work and an increase in the payment amount, and said change order fees under the proposed contract are fair
and reasonable and are consistent with and not higher than the recommended practices and fees published by
the professional associations applicable to the Provider's profession and such fees do not exceed the
maximum provided by law; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION 1. The Change Order Nos. One, Two and Three, increasing the amount of the
contract between the City and Pharlap Construction, hic., which is on file in the office of the Purchasing
Agent, in the amount of One Hundred Forty Seven Thousand Sixty Three and 0/100 ($147,063) Dollars, is
hereby approved and the expenditure of funds therefore is hereby authorized in accordance with said change
order. The total purchase order amount increases to $2,757,663.
SECTION 2. That this ordinance shall become effective immediately upon its passage and
approval. PASSED AND APPROVED this the � 7`/ //yy, 1 day of , 2002
f /CSC IiL - &IL
EULINE BROCK, MAYOR
ATTEST:
JENNIFER WALTERS, CITX SECRETARY
API,B$OVED AS -TO LEGAL FORM:
HERBERT L. PROUTY, CITY ATTORNEY
/ (4ZL BY: C�L�
3-ORD-Bid 2791 Change Order One, Two Three
Attachment I
CHANGE ORDER
Deft" sand waft 8AMW
TO CONTRACTOR
Phujw CawatreedM
c% maeoiw=wUMMjb7 1(levhN9)
IIAM "-M
Aoj=[TRCM MOMCM NOa Ira OWL
COI!ITIiACl FOIL: $610,f00A0
COMMWIL nAT6: bUffWXX6XW
The c:ontiars» abmgird aus sbuowa:
Phaw m ausaw ebaupe order requeab b= RA. berebp wny Im for d owgn in ntft won: ■s requft L
L Chauge pipe in RCP ebse M Add
1d%overhead&wvl t
2. Cbugeror=*emjxft @o - &ah Add
18% overhead & VNW
7. ChwP Mr tack embodOM d raNbrcYxrar Add
10% overhead & prom
a bftRw w & bacm
xarcbmw
The (oontn
The Cane,
Add
105E overhead & prom
OWW Otdaa......
The Cw&aet lime vfU be
7k daft of BubstmWwlas
NMI TM SV)& XV NM w
7-MOW-17-y-
_+,'.Siam
stioatwoo
d132.2MM
........................ S I39.dla �+ t
naga Oslo �d)�� $22L1,�n1��_
&o dsto Offs& Cbasnnga Order" fl Is.— ..... o%
;T INIMIblI18ACI CON AACrTMCRGUARw=
+A+JTfRRIO �l9YL7Rk7ClCtd/il1>lfv8
sacae.�ea.eadm.. �ir�i evt
amrsthdoetisn' s.w rac sot-BTm.aus.
HY SY
5 3 Q7— tam
CHANGE ORDER
but" SON Wash Fancily
4MVader Bmd
Dau%v. TV 76201
TO CG[7ri &Mlt
pwwbp Conobm om
C1rAKC'80*=MNU&%=IL• 2
DATE: Ml-MM
AVjaWBCrS FROJEC2' NO.: Bld la971
CONTRACT FOR: 2,61QAWA0
LONKRACTDATE: Mmoh26XW
the Canbad Is eheaged as
Please on attached ehauga order ngombs by R.A. Davabpmeak I0a for chaag" In adlby work as regmteA
To lowxwaterum b way of Steam Dralu
1. 4KY of8- Dit.14 at3MA0 perft Leo ah
2. 4 coal at; 8" 45 Bmd at $12160 each S600.Ip
12 mah of P repair Were AS200A0 amh S408d10
4. 12 rich 0f V Mega Lugat S75.00 each b�aOAe
Nor dung
7bw Caz&aGt Timm wtll
The date 0fgabstaa8al
MOM TMSihaenas
Add SZ7h0.00
107f. overhead & pro0e
S005B.00
1 HY 17M, OVVbliA. ASCMTBCr AtVO CON
.WY NIYi MY L... ,F W.................................r
I;hpW Orders.. ...................... ..................
ehmm Prim) prior to this ti17 mlp oAhw vra.............
Idmlm PAM) w01 ba (dWA=Wd)
d) (duu d)
asofthedabl
...... . $ arae_0e
ChmpOrders Mba.-S2M-U9A0
I
by.................................
oldw *Mfote is. ............
aft
CHANGE ORDER
rl"MCIY
Dmbm Solid waetaVaeft
4V2PF O'r2wA
D mftw, TX 78201
GRATME ORDRR N'DMPRIL. 3
DATE: 0531-2=
ARCNi'I'.SCf'S PBMGT M; Bed #V"
COIVTBAcr FOB:2,61o,E00.00
CONTFIAcri)ATIl, Marob26, M
The Cmnbnct is chmpWd m fogoww
Mears sm slmdied cheap order requM by R.A. DevWRpmDt, M& lbr th IN 9 wart ss mgoom&
Lavoles#224% BoddmaBl WlYofDmtam 53=00
invoice# 22r99 I UMM 509VU0 R[DmboR 3 9moo
AM somiw
10% overhead & groat 3 s94 00
s439 "
Tho mlginel (conned sono towummmu umdmum YAca) was ................................ . 3MIRAmm
NA cl=v by ptrA%Wy wdhwfaed Q=jF Ordma................................................. 0 141417 M
'17�e ((CmdYsat gum) (C�mvaYaead Meximmn Prim) Pridrm ]lY1s ChaYge (Aden ............ S acs�nn
The (C *vct Bm* (Cidmurtaed l xxkw,= Tlee) WMbe QggYmed] (docrowd)
(umhowmU by Obis Cheap Order to Wa amome oL...................................
-. $ 639Z00
'Ihe new (r]Innsact Nmn) (lio>e�ed Neszhomn Prlae)lncludin6 R.ie C7eu�ge Oder vrill ba- ea'fcr oL1.m
The Coomad Thom wfll be (hex moo (dflmwod)
The date of Subabmttel C=Pld[on ae ofthe date 1
-NOira-- 7HIa B[MrA fAIIYiRYfaZMLBIiFi..�^'r"'�
AfAXDAtM M CE MUM HAVE a= ADM
.......................
Dd