HomeMy WebLinkAbout2002-240ORDINANCE NO. aw—'Rik
AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NUMBER
TWO TO THE CONTRACT BETWEEN THE CITY OF DENTON AND TIM BEATY BUILDERS, INC.;
PROVIDING FOR THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING AN EFFECTIVE
DATE (BID 2749-NEW CENTRAL FIRE STATION CHANGE ORDER NUMBER TWO IN THE
AMOUNT OF $68,286).
WHEREAS, on March 5, 2002 by Ordinance No. 2002-063, the City awarded a public works
contract to Tim Beaty Builders, hic., in the amount of $3,138,000 for the New Central Fire Station;
WHEREAS, the Staff having recommended, and the City Manager having recommended to the
Council that a change order be authorized to amend such contract agreement with respect to the scope of
work and an increase in the payment amount, and said change order fees under the proposed contract are fair
and reasonable and are consistent with and not higher than the recommended practices and fees published by
the professional associations applicable to the Provider's profession and such fees do not exceed the
maximum provided by law; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION I . The Change Order No. Two, increasing the amount of the contract between the
City and Tim Beaty Builders, Inc., which is on file in the office of the Purchasing Agent, in the amount of
Sixty Eight Thousand Two Hundred Eighty Six and 0/100 ($68,286) Dollars, is hereby approved and the
expenditure of funds therefore is hereby authorized in accordance with said change order. The total purchase
order amount increases to $3,231,070.
SECTION 2. That this ordinance shall become effective immediately upon its passage and
approval. `C7L
PASSED AND APPROVED this the — day of Jaa_1jZr 2002
1--e- &,O� —
EULINE BROCK, MAYOR
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
AMOVED AS TO LEGAL FORM:
HERBERT L. P DUTY, TY ATTORNEY
BY:
-Bid 3-6RD 2749 Ch Re Or T o
Attachment l
604 E. Hickory Street Denton, Texas 76205 (940) 349-7200
FAX (940) 349-8242
FACILITIES MANAGEMENT DEPAR
MEMO
TO: Denise Harpool, Senior Buyer
FROM: Bruce Henington, Director of Facilities Management
DATE: July 19, 2002
SUBJECT: New Fire Central Change Order 42
Attached you will find a change order # 2 for the amount of $68,286.00. Funding for this
change order will come out of the approved budgeted account #10001500.
As I have previously indicated we have had a prior change order. It did not reach dollar amount
requiring City Council approval. However change order # 2 pushes our accumulative total up
over the amount where we need to have City Council approval. All changes to date including
this change order do not exceed the 25% of the total construction dollar limit. The initial
construction amount was $3,138,000.00. Including all changes and adding this change order
will bring the total construction amount to $3,231,070.00.
Please submit change order #2 to the City Council on August e, 2002.
Thank you for help, if you need more information please call me at 349-8134.
Sincerely,
Bruce
New Fire Centel Change order 2.doc
Attachment 2
2000 Edition - Electronic Format
AIA Document G701— 2000
Change Order
PROJECT: CHANGE ORDER NUMBER:2
OWNER
(Xiastandawlib6) DATE: 19 July 2002
Central Fire Station
ARCHITECT
326 East McKinney Street ARCHITECT'S PROJECT NUMBER:
CONTRACTOR a
Denton, Texas 78201
TO CONTRACTOR: CONTRACT DATE: 5 March, 2002
FIELD ❑
fNameamyaddssJ CONTRACT FOR:General Construction
OTHER
Tim Beaty Builders, Inc.
421 fast Hickory Street
Denton, Texas 76201
THE CONTRACT IS CHANGED AS FOLLOWS:
17ndu&whem4WAxhk,anyun&Wedemount sudbuishk loprdou*y tedCoaancfian Charge a6rcti AJ
AUTTENTICATION OF THS
ELEC17IONICALLY DR4MD NA
0017IRIEN7 MAY BE Manic BY IMM
1. Provide and install insulated exterior metal panels
AIADOCUtK DOI.
In lieu of specified material per revised elevations Add $62,690.00
2. Provide and install 1u-gauge steel studs in lieu of
I"auge as required for installation of insulated panels
per manufacturer's recommendation Add $ 1,950.00
3. Provide lightening protection per Owner Request Add $13,645.00
The o Contract um was s 3,138,000.00
IMBIBE!
The net change by previously authorized Change Orders s24,784.00
The (Contract Sum) (6eareateea A4a>a PHee) prior to this Change Order was s
,
3,152,784.00
The (Contract Sum) (6uairenteed Niam ma n Ptvee) will be (increased) (
aa�
bythis Change Order in the amount of s$88,280.00
The new (Contract Sum) (Qreranteed-Mseixawm-Peise)-including this Change Order will be s
m tom AIA®
3,231,070.00
AIA DOCUMENT G701-200D
The Contract Time will be (inemased) (desEmed) (unchanged) by zero ( 0 ) days.
CHANGE ORDER
Institute of
The date of Substantial Completion as of the date of this Change Order therefore is03 March
Arcchite�ctsian
2DO3
1735 New York Avenue, N.W.
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or
Washington, D.C. 20006-5292
Guaranteed Maximum Price which have been authorized by Construction Change Directive for
which the cost or time are in dispute as described in Subparagraph 7.18 of AiA Document A2ot.
American institute of Architects. Reproduction of the material re n or su slant a ciuotat on
Its provisions without written permission of the AIA violates the copyright laws of the United States and will
subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and
will subject the violator to legal prosecution. This document was electronically produced with permission of the
AIA and can he reproduced in accordance with your license without violation until the date of expiration as
noted below. expiration as noted below. expiration as noted below. User Document: city of dentorK.o —
WIM002. AIA Licanse Number 1013778, which expires on 21292003.