Loading...
1457543504 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Denison Street(University to W. Sherman Dr.) 2. Proposed Date of Construction: February 5, 2018 3. Proposed Date of Completion: March 16, 2018 4. Brief Description of the Project: Denison Street is a reconstruction project from University to W Sherman Dr. This project will include: • Utility line location to verify depth of utility lines • Damaged concrete replacement (curb, valley gutters, driveways, etc.) • Removal of ten inches of asphalt(milling process) • Stabilization of subgrade and ten inch asphalt installation Denison Street project is part of our bond program and is being contracted out to Jagoe Public. Due to deteriorating condition of the asphalt and subgrade the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. Also any sod that is laid is the homeowner's responsibility to irrigate. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2012 Bond Program 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989