Loading...
1471623858 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Egan Street (Amarillo St. to Malone St.) 2. Proposed Date of Construction: February 5, 2018 3. Proposed Date of Completion: May 7, 2018 4. Brief Description of the Project: Egan Street is a reconstruction project from Amarillo St to Malone St. This project will include: • Utility line location to verify depth of utility lines • Damaged concrete replacement (curb, valley gutters, driveways, etc.) • Removal of ten inches of asphalt(milling process) • Stabilization of subgrade and ten inch asphalt installation The Egan Street project is part of our bond program and is being contracted out to Jagoe Public. Due to the deteriorating condition of the asphalt and subgrade, the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2014 Bond Program& O&M Budget 7. Council District: District 2 & 3 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989