Loading...
1517949335 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Osage Lane (Lake Fork Circle To Wind River Lane) 2. Proposed Date of Construction: February 12, 2018 3. Proposed Date of Completion: March 5, 2018 4. Brief Description of the Project: Concrete street panel repair. The process starts with barricading the failed sections of concrete pavement, remove the pavement and subgrade, and install new concrete pavement. The new concrete has to cure for period of 7 days before it can be opened up to traffic. This is done to allow the concrete to reach sufficient strength to support traffic. 5. Special Requirements: During this time, there will be no parking on the street and there will be limited access to driveways while crews are present. A door hanger will be placed on your front door to notify you prior to your driveway being blocked. If your driveway is blocked and you need temporary access in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch at (940) 349-7000 (choose option 3) to have someone notify the crews. Detours will be provided when necessary. As part of the project, replacement sod maybe placed in your yard and is the homeowner's responsibility to irrigate. 6. Funding Source: O & M 7. Council District: District 4 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989