1. Location: Brandywine Street (Briarwood Street to Brandywine Court Dead End)
2. Proposed Date of Construction: February 20, 2018
3. Proposed Date of Completion: April 9, 2018
4. Brief Description of the Project:
Brandywine Street is a reconstruction project from Briarwood Street to the dead end of
Brandywine Court.
This project will include:
• Utility line location to verify depth of utility lines
• Failed concrete replacement (curb, valley gutters, driveways, etc...)
• Removal of seven inches of asphalt and base material (milling process)
• Stabilization of subgrade
• Seven inch asphalt installation
The project is part of our 2012 Bond Program and is being contracted out to Jagoe-Public
Co. due to deteriorating condition of the asphalt and subgrade.
5. Special Requirements: During this time, there will be no parking on the street and there
will be limited access to driveways while crews are present. A door hanger will be placed
on your front door to notify you prior to your driveway being blocked. If your driveway
is blocked and you need temporary access in or out, you can speak with an on-site crew
member directly, or call Utilities Dispatch at (940) 349-7000 (choose option 3) to have
someone notify the crews. Detours will be provided when necessary. As part of the
project, replacement sod may be placed in your yard and is the homeowner's
responsibility to irrigate.
6. Funding Source:
2012 Bond Program/Estimated Cost for Project - $340,000
7. Council District: District 2
8. Public Outreach: Public Outreach: Door hangers and Street Construction Report.
9. Map: Attached
10. Contact Information: Streets Manager. Robbin Webber 940-349-7146