1457543294 01 Y Street Department P DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Brandywine Street (Briarwood Street to Brandywine Court Dead End) 2. Proposed Date of Construction: February 20, 2018 3. Proposed Date of Completion: April 9, 2018 4. Brief Description of the Project: Brandywine Street is a reconstruction project from Briarwood Street to the dead end of Brandywine Court. This project will include: • Utility line location to verify depth of utility lines • Failed concrete replacement (curb, valley gutters, driveways, etc...) • Removal of seven inches of asphalt and base material (milling process) • Stabilization of subgrade • Seven inch asphalt installation The project is part of our 2012 Bond Program and is being contracted out to Jagoe-Public Co. due to deteriorating condition of the asphalt and subgrade. 5. Special Requirements: During this time, there will be no parking on the street and there will be limited access to driveways while crews are present. A door hanger will be placed on your front door to notify you prior to your driveway being blocked. If your driveway is blocked and you need temporary access in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch at (940) 349-7000 (choose option 3) to have someone notify the crews. Detours will be provided when necessary. As part of the project, replacement sod may be placed in your yard and is the homeowner's responsibility to irrigate. 6. Funding Source: 2012 Bond Program/Estimated Cost for Project - $340,000 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity• Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989