Loading...
2018.02.22_COD_Inspection i Gas Well Inspection Type 2017 Annual �oF I n s p e ct i o n s Inspection Cycle 2nd Half _ DENTOR 24hr Phone 1-800-214-2154 Well Operator Devon Inspection Date 11-22-17 Record Close Date 12-22-17 Active Padsite Name 97 Biltmore South 8 Jurisdiction CoD Re-Inspection Date 12-22-17 Site Address 11223 H.Lively Rd. Padsite Type Multi Well Rt 11 2nd Follow-up Inspection Ordinance Reg 2010-196 Inspected by Rod Weatherby Inspection Status Closed Plat/Site Permit No Plan No Lease Name _ RRC Id Aoi No. Spud Date Imoact 1111-0048 GWSP11 Biltmore 7H 269318 12133963 2/17/2012 3 Urban 1111-0052 GWSP11 Biltmore 8H 267502 12133964 3/8/2012 3 Urban INSPECTION CHECK LIST Signs General Location I Operator Name x Good Need Resolved Fencing x Good Need Resolved Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved Well Name x Good Need Resolved Site Surface x Good Need Resolved 24hr. Phone No x Good Need Resolved Stains x Good Need Resolved RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved No Smoking x Good Need Resolved Weeds/Brush x Good Need Resolved Reflective/Lighting x Good Need Resolved Oders/Fumes/Dust x Good Need Resolved Site Lighting x Good Need Resolved Facility Equipment Landscaping x Good Need Resolved Wellhead Paint x Good Need Resolved Wellhead Leaks Good Need x Resolved Miscellaneous Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved Equip Height x Good Need Resolved Layout per Site Plan x Good Need Resolved No Wells Approved 5 Db Level @Inspection Erosion Control Referred Fire Dept. Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred Inspection Comments #8 WH reg feeding Kimray SMT venting needs repair,#7 Sep Dv controller venting needs repair. On 12/22/17, RW conducted_ a follow-up inspection of the well site. All items requiring further attention from the Operator were resolved.