Loading...
1519419105 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Shady Oaks Turn Lane @ Woodrow 2. Proposed Date of Construction: March 12, 2018 3. Proposed Date of Completion: April 13, 2018 4. Brief Description of the Project: The City of Denton will be installing a turn lane at the intersection of Shady Oaks Drive and S. Woodrow Ln. This project will include: • Utility line location to verify depth of utility lines • New concrete sidewalk and turn lane installation The project is being done to help relieve traffic delays at the intersection of Shady Oaks Drive and S. Woodrow Ln. This work will be performed nightly between the hours of 88pm and 6am. 5. Special Requirements: During this time, there will be no parking on the street and there will be limited access to driveways while crews are present. A door hanger will be placed on your front door to notify you prior to your driveway being blocked. If your driveway is blocked and you need temporary access in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch at(940) 349-7000 (choose option 3) to have someone notify the crews. Detours will be provided when necessary. As part of the project, replacement sod may be placed in your yard and is the property owner's responsibility to irrigate. 6. Funding Source: O &M Budget/Estimated Cost for Project- $80,000 7. Council District: District 1 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989