Public Works Information Sheet
1. Location: Gober Street (Scripture Street to Panhandle Street)
2. Proposed Date of Construction: April 22, 2018
3. Proposed Date of Completion: May 28, 2018
4. Brief Description of the Project: The scope of work includes: the replacement of failed
curb and gutter, driveway, radius, and valley gutter. Street Resurfacing: The process
starts with the milling of the old asphalt surface and then a new asphalt surface is applied.
5. Special Requirements: During this time, there will be no parking on the street and there
will be limited access to driveways while crews are present. A door hanger will be placed
on your front door to notify you prior to your driveway being blocked. If your driveway
is blocked and you need temporary access in or out, you can speak with an on-site crew
member directly, or call Utilities Dispatch at(940) 349-7000 to have someone notify the
crews. Detours will be provided when necessary. As part of the project, replacement sod
may be placed in your yard and is the homeowner's responsibility to irrigate.
6. Funding Source: O&M
7. Council District: District 3
8. Public Outreach: Public Outreach: Door hangers and Street Construction Report.
9. Map: See Attached
10. Contact Information: Streets Manager. Robbin Webber 940-349-7146