Loading...
1508935116 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Sagebrush Street(Kings Row to Retama Street) Retama Street (Sagebrush Street to Huisache Street) Huisache Street(Yucca Dr to Retama Street) 2. Proposed Date of Construction: May 21, 2018 3. Proposed Date of Completion: July 20, 2018 4. Brief Description of the Project: These streets are reconstruction projects being done as one complete project. This project will include: • Utility line location to verify depth of utility lines • Damaged concrete replacement (curb, valley gutters, driveways, etc.) • Removal of seven inches of asphalt(milling process) • Stabilization of subgrade • Seven inch asphalt installation The Sagebrush Street project is a combination of our bond program and O&M program. The work is being completed by City of Denton Street department crews. Due to the deteriorating condition of the asphalt and subgrade, the streets are in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re- painting addresses or logos on curbs within the right of way. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2014 Bond Program & O&M Budget/Estimated Cost for Project - $292,506.24 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989