Loading...
1498567714 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Edwards Road(Camino Real Trail to Swisher Road) 2. Proposed Date of Construction: June 4,2018 3. Proposed Date of Completion: September 28, 2018 4. Brief Description of the Project: • Utility line location to verify depth of utility lines • Drainage pipe upgrades • Damaged concrete replacement (curb,valley gutters, driveways, etc.) • Removal of nine inches of asphalt (milling process) • Stabilization of subgrade • Nine inch asphalt installation The Edwards road project is part of our bond program and is being contracted out to Jagoe-Public, with the drainage portion being done by the City of Denton Drainage Department. Due to the deteriorating condition of the asphalt and subgrade, the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2014 Bond Program/Estimated Cost for Project - $613.667.93 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers, message boards, and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989