1525373749 o i Street Department
DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160
Public Works Information Sheet
1. Location: Hollow Ridge Drive (Paint Drive to Big Horn Trail)
2. Proposed Date of Construction: May 14, 2018
3. Proposed Date of Completion: June 29, 2018
4. Brief Description of the Project: Concrete street panel repair. The process starts with
barricading the failed sections of concrete pavement, remove the pavement and subgrade,
and install new concrete pavement. The new concrete has to cure for period of 7 days
before it can be opened up to traffic. This is done to allow the concrete to reach
sufficient strength to support traffic.
5. Special Requirements: During this time, there will be no parking on the street and there
will be limited access to driveways while crews are present. A door hanger will be placed
on your front door to notify you prior to your driveway being blocked. If your driveway
is blocked and you need temporary access in or out, you can speak with an on-site crew
member directly, or call Utilities Dispatch at(940) 349-7000 to have someone notify the
crews. Detours will be provided when necessary. As part of the project, replacement sod
may be placed in your yard and is the homeowner's responsibility to irrigate. The City of
Denton will not be responsible for re-painting addresses or logos on curbs within the right
of way.
6. Funding Source: O & M
7. Council District: District 4
8. Public Outreach: Public Outreach: Door hangers and Street Construction Report.
9. Map: Attached
10. Contact Information: Streets Manager. Robbin Webber 940-349-7146
OUR CORE VALUES
Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service
ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989