Loading...
1490790175 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Highland Street (Carroll Blvd. —IOOF) 2. Proposed Date of Construction: June 11, 2018 3. Proposed Date of Completion: July 2, 2018 4. Brief Description of the Project: The scope of work includes: the replacement of failed curb and gutter, driveway, radius, and valley gutter. Street Resurfacing: The process starts with the milling of the old asphalt surface and then a new asphalt surface is applied. 5. Special Requirements: During this time, there will be no parking on the street and there will be limited access to driveways while crews are present. A door hanger will be placed on your front door to notify you prior to your driveway being blocked. If your driveway is blocked and you need temporary access in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch at(940) 349-7000 to have someone notify the crews. Detours will be provided when necessary. As part of the project, replacement sod may be placed in your yard and is the homeowner's responsibility to irrigate. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. 6. Funding Source: O&M 7. Council District: District 3 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: See Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989