2018.06.01_COD_FollowUp Gas Well Inspection Type 2018 Annual
�oF I n s p e ct i o n s Inspection Cycle 1st Half
_ DENTOR
24hr Phone 817-588-0372 Well Operator Enervest Inspection Date 4-30-18
Record Active Padsite Name 8 BAKER 1 Close Date 5-31-18
Jurisdiction CoD Lnc Re-Inspection Date 5-31-18
Site Address 4302 Hampton Rd.
Padsite Type Single Well Rt 03 2nd Follow-up Inspection
Ordinance Reg 2001-465 Rod Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Imoact
1108-0305 No Record BAKER 1 190295 12131380 1/30/2002 Moderate
INSPECTION CHECK LIST
Signs General Location
Operator Name x Good Need Resolved Fencing x Good Need Resolved
Site Address x Good Need Resolved Entry Gate Locked x Good Need Resolved
Well Name x Good Need Resolved
Site Surface x Good Need Resolved
24hr. Phone No x Good Need Resolved
Stains x Good Need Resolved
RRC&Api No x Good Need Resolved Trash/Debris x Good Need Resolved
No Smoking x Good Need Resolved
Weeds/Brush x Good Need Resolved
Reflective/Lighting x Good Need Resolved
Oders/Fumes/Dust x Good Need Resolved
Site Lighting x Good Need Resolved
Facility Equipment I Landscaping x Good Need Resolved
Wellhead Paint x Good Need Resolved
Miscellaneous
Wellhead Leaks x Good Need Resolved
Tank Battery Paint x Good Need Resolved Electric Lines Safe x Good Need Resolved
Tank Battery Leaks Good Need x Resolved Pipeline Markers x Good Need Resolved
Equip Height x Good Need Resolved
Layout per Site Plan x Good Need Resolved No Wells Approved Db Level @Inspection
Erosion Control Referred
Fire Dept. I
Fire Lane Access Referred Tank Integrity Referred Foam Lines Referred
Auto Safety Valve Referred Containment Integrity Referred Lightning Arresting Referred
Tank Level Activated Referred Drip Pots @ Disconnects Referred Pit Fencing Referred
Accessible ESD Referred Storage Tank Labels Referred Pit Liner Integrity Referred
Inspection Comments
B5h North Tank has holes in Top, Needs repair, 132H Sep DV controller needs repair(red flag), recommend DV Controller maint.._
On 5/31/18, RW conducted a follow-up inspection of the well site. Operator resolved all items requiring further
attention.