Loading...
1496332273 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Cobblestone Row (N Locust to Evers Pkwy) 2. Proposed Date of Construction: June 11, 2018 3. Proposed Date of Completion: August 9, 2018 4. Brief Description of the Project: • Utility line location to verify depth of utility lines • Damaged concrete replacement (curb, valley gutters, driveways, etc.) • Removal of nine inches of asphalt(milling process) • Stabilization of subgrade nine inch asphalt installation The Cobblestone project is part of our bond program and is being contracted out to Jagoe Public. Due to the deteriorating condition of the asphalt and subgrade, the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2014 Bond Program/Estimated Cost for Project - $323,067.55 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989