Loading...
1516391203 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Malone Street (Scripture St. to W. University Dr.) 2. Proposed Date of Construction: July 9, 2018 3. Proposed Date of Completion: August 24, 2018 4. Brief Description of the Project: • Utility line location to verify depth of utility lines • Valley Gutter replacement when needed • Base failure repair • Removal of three inches of asphalt(milling process) • Three inch asphalt installation The Malone Street project is part of our O&M Program and is being contracted out to Jagoe-Public. Due to the deteriorating condition of the asphalt and new utility line installation, the street is in need of maintenance. This project is a series of temporary lane closures in which traffic will be reduced to one lane traffic in each direction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. Please report all irrigation issues within 60 days of the project's completion. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: O&M Budget/Estimated Cost for Project - $571,765.45 7. Council District: District 3 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989