Loading...
15338355227 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Bay Meadow (Prescott Downs Dr. to Fairmount Park Dr.) 2. Proposed Date of Construction: August 27, 2018 3. Proposed Date of Completion: September 10, 2018 4. Brief Description of the Project: Concrete street panel repair. The process starts with barricading the failed sections of concrete pavement, remove the pavement and subgrade, and install new concrete pavement. The new concrete has to cure for period of 7 days before it can be opened up to traffic. This is done to allow the concrete to reach sufficient strength to support traffic. 5. Special Requirements: During this time, there will be no parking on the street and there will be limited access to driveways while crews are present. A door hanger will be placed on your front door to notify you prior to your driveway being blocked. If your driveway is blocked and you need temporary access in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch at (940) 349-7000 to have someone notify the crews. Detours will be provided when necessary. As part of the project, replacement sod may be placed in your yard and is the homeowner's responsibility to irrigate. To prevent unnecessary damage to your irrigation system,please locate sprinkler heads within the street right of way. The right of way usually goes back at least one to two feet behind the sidewalk. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. 6. Funding Source: O & M 7. Council District: 4 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989