Loading...
1536678955 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Wellington Drive (Stratford Lane to Heather Lane) 2. Proposed Date of Construction: September 26, 2018 3. Proposed Date of Completion: November 1, 2018 4. Brief Description of the Project: • Utility line location to verify depth of utility lines • Removal of 4-inch asphalt • Subgrade stabilization • Replacement of 4-inch asphalt The Wellington Drive Project is part of our O&M Program and is being done by our in- house construction crew. Due to the deteriorating condition of the asphalt and subgrade, the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re-painting addresses or logos on curbs within the right of way. As part of the project, replacement sod may be placed in your yard and is the homeowner's responsibility to irrigate. Please report all irrigation issues within 60 days of the project's completion. 5. Special Requirements: "No Parking" on street. Detours will be provided. 6. Funding Source: O&M Budget/Estimated Cost for Project- $74,195.74 7. Council District: District 2 8. Public Outreach: Public Outreach: Door hangers and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989