Loading...
1542139677 o i Street Department DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160 Public Works Information Sheet 1. Location: Sierra Drive (Yellowstone Pl. — Sherman Dr.) 2. Proposed Date of Construction: November 26, 2018 3. Proposed Date of Completion: March 29, 2019 4. Brief Description of the Project: • Utility line location to verify depth of utility lines • Concrete removal and replacement(curb, ADA ramps, driveways, sidewalk) • Removal of seven inches of asphalt(milling process) • Stabilization of subgrade and install seven inches of asphalt Due to the deteriorating condition of the asphalt and subgrade, the street is in need of reconstruction. Residents are advised to refrain from parking in the street while workers are present unless otherwise advised. The City of Denton will not be responsible for re- painting addresses or logos on curbs within the right of way. Please report all irrigation issues within 60 days of the project's completion. 5. Special Requirements: "No Parking" on street. Detours will be provided. Sod is the homeowner's responsibility to irrigate. 6. Funding Source: 2014 Bond Program 7. Council District: District 2 8. Public Outreach: Door hangers, Message Boards, and Street Construction Report. 9. Map: Attached 10. Contact Information: Streets Manager. Robbin Webber 940-349-7146 OUR CORE VALUES Integrity•Fiscal Responsibility•Transparency• Outstanding Customer Service ADA/EOE/ADEA www.cityofdenton.com TDD(800)735-2989