1542139677 o i Street Department
DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160
Public Works Information Sheet
1. Location: Sierra Drive (Yellowstone Pl. — Sherman Dr.)
2. Proposed Date of Construction: November 26, 2018
3. Proposed Date of Completion: March 29, 2019
4. Brief Description of the Project:
• Utility line location to verify depth of utility lines
• Concrete removal and replacement(curb, ADA ramps, driveways, sidewalk)
• Removal of seven inches of asphalt(milling process)
• Stabilization of subgrade and install seven inches of asphalt
Due to the deteriorating condition of the asphalt and subgrade, the street is in need of
reconstruction. Residents are advised to refrain from parking in the street while workers
are present unless otherwise advised. The City of Denton will not be responsible for re-
painting addresses or logos on curbs within the right of way. Please report all irrigation
issues within 60 days of the project's completion.
5. Special Requirements: "No Parking" on street. Detours will be provided.
Sod is the homeowner's responsibility to irrigate.
6. Funding Source:
2014 Bond Program
7. Council District: District 2
8. Public Outreach: Door hangers, Message Boards, and Street Construction Report.
9. Map: Attached
10. Contact Information: Streets Manager. Robbin Webber 940-349-7146