1534355512 o i Street Department
DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160
Public Works Information Sheet
1. Location: Bell Ave (Roberson to Sycamore) & (Sycamore to Hickory)
2. Proposed Date of Construction: October 10, 2018
3. Proposed Date of Completion: November 16, 2018
4. Brief Description of the Project: Concrete street panel repair. The process starts with
barricading the failed sections of concrete pavement, remove the pavement and subgrade,
and install new concrete pavement. The new concrete has to cure for period of 7 days
before it can be opened up to traffic. This is done to allow the concrete to reach
sufficient strength to support traffic.
5. Special Requirements: During this time, there will be limited access to driveways while
crews are present. A door hanger will be placed on your front door to notify you prior to
your driveway being blocked. If your driveway is blocked and you need temporary access
in or out, you can speak with an on-site crew member directly, or call Utilities Dispatch
at(940) 349-7000 to have someone notify the crews. Detours will be provided when
necessary. As part of the project, replacement sod may be placed in your yard and is the
homeowner's responsibility to irrigate. To prevent unnecessary damage to your irrigation
system, please locate sprinkler heads within the street right of way. The right of way
usually goes back at least one to two feet behind the sidewalk. The City of Denton will
not be responsible for re-painting addresses or logos on curbs within the right of way.
6. Funding Source: O & M
7. Council District: 1
8. Public Outreach: Public Outreach: Door hangers and Street Construction Report.
9. Map: Attached
10. Contact Information: Streets Manager. Robbin Webber 940-349-7146