1537556544 o i Street Department
DENTON 901-A Texas Street, Denton, TX 76209 • (940) 349-7160
Public Works Information Sheet
• Location: * Kingswood Court (Londonderry Lane to South Dead End) Phase I
October 1, 2018—January 18, 2018
* Camden Court(Londonderry Lane—South Dead End) Phase II
October 1, 2018—January 18, 2019
* Londonderry Lane (Teasley Lane—Hollyhill Lane) Phase III
November 12, 2018—January 18, 2019
• Brief Description of the Project:
• Utility line location to verify depth of utility lines
• Damaged concrete replacement (curb, valley gutters, driveways, etc.)
• Removal of seven inches of asphalt(milling process)
• Stabilization of seven inches of subgrade and install seven inches of asphalt
The Londonderry Lane Project is part of our bond program and is being contracted out to
Jagoe-Public Co. Due to the deteriorating condition of the asphalt and subgrade and with
new utility line upgrades, the street is in need of reconstruction. Residents are advised to
refrain from parking in the street while workers are present unless otherwise advised. The
City of Denton will not be responsible for re-painting addresses or logos on curbs within
the right of way. Please report all irrigation issues within 60 days of the project's
completion.
• Special Requirements: "No Parking" on street. Detours will be provided.
Sod is the homeowner's responsibility to irrigate.
• Funding Source:
2012 Bond Program/Estimated Cost for Project - $420,044.00
• Council District: District 4
• Public Outreach: Public Outreach: Door hangers and Street Construction Report.
• Map: Attached
• Contact Information: Streets Manager. Robbin Webber 940-349-7146