2020.04.22_COD_Inspection Gas Well Inspection Type 2020 Annual
�oF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone Inspection Date 4-21-20
817-841-8885 Well Operator Bedrock
Record Active Padsite Name 52 LINT 1 Close Date 4-21-20
Jurisdiction CoD Lnc Re-Inspection Date
Site Address 2650 Tom Cole Rd.
Padsite Type Single Well Rt 13 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1111-0079 No Record LINT 1 190908 12131442 4/15/2002 Moderate
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve) Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve) Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolve) Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolve) Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve) Tank Integrity • Good Need Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolve) Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolve) Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolve) Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve) Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolve) Erosion • Good Need Resolve INO Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolve) Layout • Good Need Resolve)
Markers per Site
Inspection Comments
Compliant
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-26-20 COD Follow Up Date: 4-21-20
Compliant Compliant
p %Va
1
❑ so—
w
• •• AST
• • - ® Upwr,E At Sa PWV Part
I �
•• a • ® D•w .,d Ar Sanorg Pant
•• 44 V*%d D ecbw flu 1
a PMIA•IM Sawn V AbWn l
pPdit