24hr Phone 817-841-8885 Well Operator Bedrock Inspection Date 4-20-20
Record Active Padsite Name 8 BAKER 1 Close Date 4-28-20
Jurisdiction CoD Lnc Re-Inspection Date 4-28-20
Site Address 4302 Hampton Rd.
Padsite Type Single Well Rt 03 2nd Re-Inspection Date
Ordinance Reg 2001-465 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact
1108-0305 No Record BAKER 1 190295 12131380 1/30/2002 Moderate
MPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve
RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
IInspection Comments I
Meco Regulator at suction controller to Compressor venting -needs repair(red flagged). Thief Hatch on Tank 583-2 (C)venting-needs
repair. On 4/28/20, RW conducted a followup inspection. Operator resolved issues
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-25-20 COD Follow Up Date: 4-20-20
Leaks:AST A thief hatch, _ Leaks at thief hatches on
AST C thief hatch,AST E Lywnd: Tanks A,E,G were tested
thief hatch,AST G thief A Q w.1 and found working
hatch and enardo valve, C seoo.,ot properly. Thief Hatch at
AST H enardo valve,AST 1 Tank C was found venting,
enardo valve,and AST J AST 4/28/20 Thief hatch C was
enardo valve C °oiWe"°" repaired and working
!� AndtaryEwp"M properly
® Upw 0 A.Sampanq Purl
'® D—..d A.Sampung Pont
8 --■.-r * V11nd DNNLdI 1101
c D E p a A •• iencel—Saeemnp Mgt ce t
C E
A O A■ OCservaean Pam
E D f N A E Q Padsd.
® a Deem Cwmy Pycets
•. I