2020.05.11_COD_FollowUp _-IM000 Gas Well Inspection Type 2020 Annual
`OF Inspections Inspection Cycle 1st Half
_ DENTOR
24hr Phone Inspection Date 4-20-20
817-841-8885 Well Operator Bedrock
Record Close Date 5-8-20
Active Padsite Name 10 Baker-Ranch Estates Pad
Jurisdiction COD Lnc Re-Inspection Date 5-8-20
Site Address 2052 N. Masch Branch Rd
Padsite Type Multi Well Rt 02 2nd Re-Inspection Date
Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed
Plat/Site
Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact
1109-0296 GWP04-0006 COLE"B"2H 2O2729 12131426 12/20/2003 High
1408-0122 AGDP14 Baker-Ranch Estates(SA)8H 277067 12134459 8/10/2014 High
1408-0124 AGDP14 Baker-Ranch Estates(SA)9H 278675 12134460 8/9/2014 High
1408-0125 AGDP14 Baker-Ranch Estates(SA)10H 278077 12134462 8/8/2014 High
1408-0126 AGDP14 Baker-Ranch Estates(SA)11 H 278079 12134461 8/7/2014 High
1408-0127 AGDP14 Cole B 3H 276174 12134463 8/4/2014 High
1408-0128 AGDP14 Cole B(SA)4H 277069 12134464 8/6/2014 High
INSPECTION CHECK LIST
Signs/Labels General Location Facility Equipment
Operator • Good Need Resolve Wellhead Paint • Good Need Resolve
p Fencing • Good Need Resolve
Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve
Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve
24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve
RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve
p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve
No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve
Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve
Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve
• Good Need Resolve Equip Height • Good Need Resolve
Tank Battery Landscaping • Good Need Resolve
Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level
Miscellaneous
Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves
Markers per Site
Inspection Comments
Cole B2 Tank Battery,Thief hatches venting on both tanks(A&B). At the main tank battery, all thief hatches are venting, however,they
appear to be working per design. On 5/8/20, RW conducted a follow-up inspection of the well site.Operator resolved all items
requiring further attention.
Inspections Conducted by Third Party and COD Follow Up
Third Party Inspection Date: 3-26-20 COD Follow Up Date: 5-8-20
Leaks:AST B thief hatch, Issues resolved
AST C thief hatch,and AST
X thief hatch
■ A • ❑J J�A�&.� 9apr.w
■ A19�■
SL_•-� O AST
•a c o E -■
•cToTE ^" �........ Q An YEW m.m
F G N ■ .......... WNq
N
Nr S�mgn•POrt
J
■ L i M .® Dw.iwM A.SampYy Pant
o P o ■
• R s'T
V ■ SWAG Sa�lrg Part
u W,
F G N ■
sc FenoYn Sawnnp AN,yimsN
.■ 5���
■A S^'.�10■..nM■•n 1P.M
Gas Well Inspection Type 2020 Annual
- 1 Inspections Inspection Cycle CITY - Jy 1st Half
_ DENTO J