Loading...
2020.05.11_COD_FollowUp _-IM000 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-20-20 817-841-8885 Well Operator Bedrock Record Close Date 5-8-20 Active Padsite Name 10 Baker-Ranch Estates Pad Jurisdiction COD Lnc Re-Inspection Date 5-8-20 Site Address 2052 N. Masch Branch Rd Padsite Type Multi Well Rt 02 2nd Re-Inspection Date Ordinance Reg 2002-040 R Weatherby Inspected by y Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Avi No. Spud Date Impact 1109-0296 GWP04-0006 COLE"B"2H 2O2729 12131426 12/20/2003 High 1408-0122 AGDP14 Baker-Ranch Estates(SA)8H 277067 12134459 8/10/2014 High 1408-0124 AGDP14 Baker-Ranch Estates(SA)9H 278675 12134460 8/9/2014 High 1408-0125 AGDP14 Baker-Ranch Estates(SA)10H 278077 12134462 8/8/2014 High 1408-0126 AGDP14 Baker-Ranch Estates(SA)11 H 278079 12134461 8/7/2014 High 1408-0127 AGDP14 Cole B 3H 276174 12134463 8/4/2014 High 1408-0128 AGDP14 Cole B(SA)4H 277069 12134464 8/6/2014 High INSPECTION CHECK LIST Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint • Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks • Good Need Resolve Well Name • Good Need Resolve Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks • Good Need Resolve RRC/A i# • Good Need Resolve Tank Integrity Good Need • Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus • Good Need Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead • Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve No Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site Inspection Comments Cole B2 Tank Battery,Thief hatches venting on both tanks(A&B). At the main tank battery, all thief hatches are venting, however,they appear to be working per design. On 5/8/20, RW conducted a follow-up inspection of the well site.Operator resolved all items requiring further attention. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-26-20 COD Follow Up Date: 5-8-20 Leaks:AST B thief hatch, Issues resolved AST C thief hatch,and AST X thief hatch ■ A • ❑J J�A�&.� 9apr.w ■ A19�■ SL_•-� O AST •a c o E -■ •cToTE ^" �........ Q An YEW m.m F G N ■ .......... WNq N Nr S�mgn•POrt J ■ L i M .® Dw.iwM A.SampYy Pant o P o ■ • R s'T V ■ SWAG Sa�lrg Part u W, F G N ■ sc FenoYn Sawnnp AN,yimsN .■ 5��� ■A S^'.�10■..nM■•n 1P.M Gas Well Inspection Type 2020 Annual - 1 Inspections Inspection Cycle CITY - Jy 1st Half _ DENTO J