Loading...
2020.05.26_COD_Inspection _-IM000 Gas Well Inspection Type 2020 Annual `OF Inspections Inspection Cycle 1st Half _ DENTOR 24hr Phone Inspection Date 4-23-20 817-841-8885 Well Operator Bedrock Record Close Date 5-15-20 Active Padsite Name 156 Robson Ranch CTB Jurisdiction COD Re-Inspection Date 5-15-20 Site Address 12886 Robson Rd. Padsite Type CTB Rt 21 2nd Re-Inspection Date Ordinance Reg Inspected by R Weatherby Inspection Status Closed Plat/Site Permit No Plan No Lease Name .RRC Id Ali No. Spud Date Impact 1110-0183 Robson Ranch CTB High INSPECTION CHECK Signs/Labels General Location Facility Equipment Operator • Good Need Resolve Wellhead Paint Good Need Resolve p Fencing • Good Need Resolve Site Address • Good Need Resolve Wellhead Leaks Good Need Resolve Well Name Good Need Resolves Entry Gate • Good Need Resolve Site • Good Need Resolve T Battery Paint • Good Need Resolve 24hr. Phone • Good Need Resolves Stains • Good Need Resolve T Battery Leaks Good Need • Resolve RRC/A i# • Good Need Resolve Tank Integrity • Good Need Resolve p� Trash/Debris • Good Need Resolve Containment • Good Need Resolve No Smoking • Good Need Resolves Weeds/Brus Good Need • Resolve Reflective • Good Need Resolves Oders/Fumes/Dus • Good Need Resolve Drip Pots • Good Need Resolve Wellhead Good Need Resolves Site Lighting • Good Need Resolve Lightning • Good Need Resolve • Good Need Resolve Equip Height • Good Need Resolve Tank Battery Landscaping • Good Need Resolve Tank Labels • Good Need Resolves Erosion • Good Need Resolve INO Wells Approved Db Level Miscellaneous Electric Lines • Good Need Resolve Pipeline • Good Need Resolves Layout • Good Need Resolves Markers per Site IInspection Comments I @ Compressor 1 - DV controllers venting needs repair(red flagged). @ Compressor 2-DV controllers venting needs repair(red flagged), Regulator venting needs repair(red flag). Weed control needed. On 4/30/20, RW conducted a follow-up to check venting issues. Operator addressed the venting issues at the Compressors. Weed Control issue remaining. On 5/15/20, RW conducted a follow-up inspection of the well site. Operator addressed weed issue. Inspections Conducted by Third Party and COD Follow Up Third Party Inspection Date: 3-26-20 COD Follow Up Date: 4-23-20 Leaks:Separator A Reported issues were actuator,Separator B tested and found working actuator and kimray valve, properly AST A enardo valve,AST B enardo valve,and AST E enardo valve