Loading...
COD-2015-Residential-Energy-Compliance-Path-Plan-Review-Certificate Rev. 4/28/17 Department of Development Services Building Safety City of Denton Texas 2015 IECC Residential Energy Compliance Certificate Path PROVIDE THIS FORM AT PERMIT SUBMITTAL Permit Address: __________________________________________ Permit #: ____________ Testing Company:_________________________________________ Phone #: ____________ Testing Company:_________________________________________ Phone #: ____________ R401.2 – Projects shall comply with one of the following. All mandatory provisions apply:  Option 1A – Prescriptive: Sections R401 through R404: R402 Building Thermal Envelope [Using table R402.1.2) Insulation and Fenestration requirements by component] R403 Systems R404 Electrical Power and Lighting Systems (Mandatory)  Option 1B – Prescriptive Using REScheck UA Approach Only: Sections R401 through R404 R402 Building Thermal Envelope R403 Systems R404 Electrical Power and Lighting Systems (Mandatory)  Option 2 – Performance Approach: Section R405 As-Built Report Required (Attach to final testing report)  Option 3 – ENERGY STAR Certified Home (attach certificate to final testing report)  Option 4 – Energy Rating Index Compliance Alternative: Section R406 Minimum envelope requirements > Table R402.1.1 or R402.1.3 –2015 IECC Option 5 – ESL 4ACH Tradeoff Code Equivalency Compliance* Envelope Component  Option 5A  Option 5B Air Leakage <4ACH <4ACH Wall Insulation Value** R13 + R3 R13 + R3 Fenestration U-factor < 0.32/0.25 < 0.32/0.25 Ceiling R-value < R49 < R49 Duct Insulation R8 R6 Radiant Barrier Required No Yes *Except for the values listed in the table, all other mandatory code provisions are applicable. **First value is cavity insulation, second is continuous insulation or insulated siding. I certify that I have reviewed the construction documents including, but not necessarily limited to, insulation materials and R-values; fenestration U-factors and SHGC values; area-weighted average U-factor and SHGC calculations; mechanical system design criteria; mechanical and service water heating system and equipment types, sizes and efficiencies; equipment and systems controls; duct sealing, duct and piping insulation and location; and air sealing details; and that the project as designed satisfies the minimum requirements for the compliance approach selected above. Print Name: ______________________________________________ Certification Number: ____________________ Energy Rater/Preparer Company: ___________________________________________________________________ Signature of Energy Rater/Preparer: _______________________________________ Date: ____________________ ATTACH THE APPLICABLE COMPLIANCE REPORT