Loading...
COD-Commercial-Energy-Compliance-Path-Requirments-of-the-2015-IECC2rev: 4/17/17   Department of Development Services   Building Safety City of Denton Texas 2015 IECC Commercial Energy  Compliance Certificate Path  (for new construction, additions, and first finish outs)    PROVIDE THIS FORM AT PERMIT SUBMITTAL  Permit Address: __________________________________________ Permit #: ____________ Testing Company:_____________________________________________________________ Testing Company:_____________________________________________________________ Selected Compliance Path (select one of the following):  Option 1A – ASHRAE 90.1 (2013) Prescriptive: Section 10 (May use COMcheck to demonstrate compliance.) Section 5 – Building Envelope Section 8 – Power Section 6 – HVAC Section 9 – Lighting Section 7 – Service Water Heating Section 10 – Other Equipment  Option 1B – ASHRAE 90.1 (2013) Section 11 Energy Cost Budget Method: Section 5.4, 6.4, 7.4, 8.4, 9.4, and 10.4; design energy cost (Sec. 11.5) < energy cost budget (Sec. 11.4); and energy efficiency level of components specified meet or exceed energy efficiency levels used to calculate energy costs.  Option 2 – IECC Prescriptive (May use COMcheck to demonstrate compliance.) C402 – Building Envelope Requirements C404 – Service Water Heating (Mandatory) C403 – Building Mechanical Systems C405 – Electrical Power and Lighting Systems C406 – Additional efficiency package options (must choose one) C406.2 – More efficient HVAC Performance C406.5 – On-site supply of renewable energy C406.3 – Reduced lighting power density C406.6 – Provisions of a dedicated OA system C406.4 – Enhanced lighting controls C406.7 – High-efficiency service water heating  Option 3 – Total Building Performance: building energy cost < 85% of standard reference design. C402.5 – Air Leakage – thermal envelope (Mandatory) C405.3 – Exit Signs (Mandatory) C403.2 – Provisions applicable to all Mechanical Systems (Mandatory) C405.4 – Interior Lighting and Power Requirements (Prescriptive) C404 – Service Water Heating (Mandatory) C405.6 – Electrical Energy Consumption (Mandatory) C405.2 – Lighting Controls (Mandatory) C407 – Total Building Performance NOTE:   Mechanical cooling systems over 480,000 Btuh and service water‐heating/space‐heating systems over 600,000 Btuh (combined capacity);  and, controls for automatic lighting systems require certain information on construction documents and system commissioning and reports in  accordance with section C408  I certify that I have reviewed the construction documents including, but not necessarily limited to, insulation materials and R-values; fenestration U-factors and SHGC values; area-weighted average U-factor and SHGC calculations; mechanical system design criteria; mechanical and service water heating system and equipment types, sizes and efficiencies; equipment and systems controls; duct sealing, duct and piping insulation and location; and air sealing details; and that the project as designed satisfies the minimum requirements for the compliance approach selected above. Print Name: ______________________________________________ Certification Number: ____________________ Energy Rater/Preparer Company: ___________________________________________________________________ Signature of Energy Rater/Preparer: _______________________________________ Date: ____________________ ATTACH THE APPLICABLE COMPLIANCE REPORT