Loading...
Variance Checklist Development Services 401 N. Elm St., Denton, TX 76201  (940) 349-8541 Updated 7/23/21 Variance Checklist 1 Variance Checklist Variance submittal requirements, criteria for decision, determination, and review follow the regulations outlined in Denton Development Code Section 2.8.1. ☐ **Labeling Your Submittals – Follow with All Documents Submitted  Project Number – [First/Second/Third] Submittal [Document Title] o Examples:  ZBA21-0001 – First Submittal Narrative  ZBA21-0001 – First Submittal ZBA Checklist  ZBA21-0001 – Second Submittal Site Plan  **Your submittal will be deemed incomplete if your files are not properly labeled. The following items must be submitted in order for the submittal to be considered complete: ☐ 1.1 Application and Checklist. ☐ 1.2 Associated Fee(s): as listed on the Development Review Fee Schedule. ☐ 1.3 Project Narrative: Written proposal for the project. Refer to the Project Narrative Guidelines. ☐ 1.4 Explanation of requested variance. Specifically describe the proposed deviation from the Denton Development Code (DDC), reason(s) for the request and how the proposed request meets each of the approval criteria in Section 2.8.1 of the DDC. ☐ 1.5 Supporting Plans: Based on the type of variance requested, plans relevant to the requested variance are required. Examples of necessary supporting plans may include, but are not limited to: ☐ 1.5.1 Site Plan ☐ 1.5.2 Landscape Plan ☐ 1.5.3 Plat ☐ 1.5.4 Building Elevations ☐ 1.6 Legal Description: 1) a subdivision reference or 2) a metes and bounds description of the property prepared and sealed by a registered land surveyor. ☐ 1.7 Copies of Deed or Owner Authorization Form – download form here.