2021/07/12 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR July 12th - 18th
Closure Start
Street/IntersecTownp-- From To Date Description Department Department Contact
Bell Ave at Mingo Rd 09/02/21 09/17/21 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bell Ave Withers St Mingo Rd 08/24/21 10/05/21 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bell Ave Texas St Withers St 07/31/21 08/23/21 Water Distribution will be Water Tiffany Sherrane
3 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 10/06/21 11/16/21 Water Distribution will be Water Tiffany Sherrane
4 replacing the water main line
and services.
Carroll Blvd(SB) Stroud Highland 07/19/21 08/20/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co
Sidewalk Repair.The process m
5 starts with Barricading the failed
sections of concrete pavement,
remove the pavement,and
install new concrete.
Edwards Desert Willow Forrest Willow 07/19/21 09/03/21 Concrete Street Panel and Streets Robbin Webber
6 Sidewalk Repair.Remove the
pavement and install new
concrete.
Montecito Dr Buena Vista Palo Verde 07/26/21 08/27/21 Concrete Sidewalk Repair. Streets Robbin Webber
7 Remove failed sections and
install new concrete
Exported on July 9,2021 11:08:37 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
Street/Intersection From VWo 9. - Date Description Department Contact
Bell Ave Administration Dr Texas St 07/02/21 07/30/21 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bell Ave at Mckinney St 07/03/21 09/01/21 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
3 Bonnie Brae IH 35E Scripture 06/15/20 07/30/21 North South Water Main Phase Streets Robin Davis
3
Bonnie Brae(SB) Oak Hickory 06/14/21 09/22/21 This block is closed to Other Mark Zimmerer
southbound traffic only,detours
are posted.Northbound lane
4 still open.Installation of electric
duct banks for DME substation
project and steel casing for
water main project
Caddo Circle Champlian Cul v Sac 06/14/21 07/09/21 Concrete Sidewalk Repair. Streets Robbin Webber
5 remove failed sections of
concrete Sidewalk,remove,and
install new concrete
Carroll Blvd(SB) Egan Panhandle 05/31/21 07/16/21 Concrete Street Panel Repair. Streets robbin.webber@cityofdenton.co
The process starts with m
6 Barricading the failed sections
of pavement,remove the
pavement and subgrade,and
install new concrete pavement.
Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo
7 replacement and subgrade
improvement.
College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
8 installing a new wastewater
main line and services.
9 Creekdale Drive Dead End Raintree Way 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber
10 Deerwood PWY Kings Row Grant PWY 07/06/21 08/06/21 Sidewalk Repair Streets Robbin Webber
11 E Windsor Dr Nottingham Branch Crossing 06/14/21 08/27/21 Roadway reconstruction Engineering Dustin.Draper@cityofdenton.co
12 Eagle Locust Elm 06/28/21 07/30/21 Patching of utility trench lines. Engineering Seth Garcia
13 Elm Hickory Eagle 05/11/20 07/30/21 PEC 4 Utility Project Engineering Seth Garcia
Elm Street Eagle Drive (dead end) 05/17/21 09/30/21 Atmos Energy will be closing Atmos Alice Province
14 street intermittently to replace
and relocate an existing gas
main and service lines
Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
15 installing a new wastewater
main line and services.
Hickory Street Welch Carroll 08/31/20 09/04/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
16 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo
17 replacement and subgrade
improvement.
18 Locust 1 Eagle Hickory 06/28/21 07/30/21 Patching of utility trench lines. Engineering Seth Garcia
Exported on July 9,2021 11:08:52 AM CDT Page 1 of 2
Street/Intersection From To Closure Start Closure End Description Department Department Contact
Date Date
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
19 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo
20 replacement and subgrade
improvement.
21 Nottingham Unversity(US380) 500 feet to the south 06/02/21 07/14/21 Milling and turn lane addition Engineering Dustin Draper
with a siganl upgrade.
Oak Street Bell Street UPRR Railroad 02/01/21 08/28/21 Adding drainage line to Oak Engineering kyle.pedigo@cityofdenton.com
22 Street as part of the Downtown
Storm Sewer Project.
Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
23 installing a new wastewater
main line and services.
Riney Bonnie Brae Hardaway 07/06/20 07/30/21 Removing panel to adjust valve Private Development Public Jeremiah Tillman-David
stack and center gate valve nut. Works Inspections
24 Replace panel after adjusting
valve stack.Traffic control up
from 8am-5pm
25�Riverchase Trail Stoneway Drive Creekdale Drive 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber
Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 08/26/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co
Bonnie Brae to approximately m
1,300 ft.to the west.This
includes removal and
replacement of failed sections
of curb and gutter.Milling of the
old asphalt pavement and the
26 stabilization of subgrade and
the installation of new asphalt
pavement.
Phase I East Bound Outside
Lane
Phase II West Bound Outside
Lane
Phase III Middle Lane
Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province
27 excavating street to complete
replacement/relocation of their
existing gas main
Western Blvd Jim Chrystal Airport Rd 06/01/21 08/02/21 PH1-Installing sewer line Private Development Public Jeremiah Tillman-David
across Western from median to Works Inspections
28 private property.PH2-Median
removal,future pour for Turn
Lanes
Windsor Dr East Hanover Dr Longfellow Ln 06/01/21 07/30/21 Complete street reconstruction Engineering Dustin Draper
29 only allowing resident only
traffic.
Woodhaven Msitywood Emerson 04/05/21 08/12/21 This project will consist of the Streets robbin.webber@cityofdenton.co
removal and replacement of m
failed sections of curb and
gutter,the milling off the old
asphalt and base material,lime
stabilize the subgrade and the
installation of new asphalt
pavement.
Exported on July 9,2021 11:08:52 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From To losure Start Closure End Description Department Contact
—ate Date
Amherst Dr Georgetown Dr Malone St 04/15/21 06/25/21 Water Distribution will be Water Tiffany Sherrane
1 installing new water main and
water services.
Bell Ave McKinney Street Hickory Street 02/01/21 07/02/21 Closures starting 6/1/21. Engineering kyle.pedigo@cityofdenton.com
Various traffic shifts will be
required at the intersection of
2 Bell and Oak(between
McKinney and Hickory)in order
to cross Bell with a new
drainage line on Oak Street.
Boxwood at Chittamwood 3800 Boxwood 06/07/21 06/25/21 Concrete Street Panel and Streets Robbin Webber
3 Sidewalk Repair.Remove the
pavement and install new
concrete.
4 Bryan Street Jagoe Scripture 07/02/21 07/02/21 Flagging traffic to offload Public Works Inspections Stephany Trammell
equipment from the job site
Crestmeadow Street Windsor Bauer 05/31/21 06/18/21 Curb and Gutter Repair:The Streets robbin.webber@cityofdenton.co
5 process starts with barricading m
the failed sections and then
installing new Curb and Gutter.
Uland Railroad Rose 02/11/21 06/21/21 Wastewater collections will be Wastewater Tiffany Sherrane
6 installing a new wastewater
main line and services.
7 Windor Bonnie Brae Parkside Dr 06/21/21 07/05/21 18"SS Line Private Development Public Jeremiah Tillman-David
Works Inspections
Windsor Dr East Hanover DR Longfellow LN 06/01/21 06/30/21 Complete street reconstruction Engineering Dustin Draper
is being preformed.As shown in
8 the attached TCP the road will
be closed and resident only
traffic will be allowed from
Longfellow to Bristol ST.
Exported on July 9,2021 11:09:03 AM CDT Page 1 of 1