2021/07/26 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR July 26th - Aug 1st Street/In erse on From —11F— To Closure StartEm Description Department Department Contact Date Avenue C 1-35 North Frontage Eagle Drive 07/26/21 08/09/21 Lane shift to allow for repair of Private Development Robert Plato damaged streets due to contractor activity on the Carriage Square Apartment project. Bell Hickory McKinney 07/28/21 08/25/21 Storm drain installation across Engineering Streets Kyle Pedigo Bell on Oak.Bell will be closed half at a time as the storm drain is installed Bell Ave Texas St Withers St 07/31/21 09/03/21 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave Withers St Mingo Rd 09/04/21 10/16/21 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave at Mingo Rd 08/19/21 09/29/21 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bernard St Hickory St Chestnut St 10/18/21 11/30/21 Water Distribution will be Water Tiffany Sherrane 6 replacing the water main line and services. Colorado Boulevard Valley Creek Road San Jacinto Boulevard 07/26/21 08/26/21 Building a right-turn lane into Public Works Inspections Robert Plato the new Vista Verde project on 7 the west side of Colorado. The right lane will be closed while operations are being performed to add the turn lane. Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper 8 performed on the westbound lane of E Windsor Exported on July 23,2021 10:50:45 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection From VWo 9. - Date Description Department Contact Bell Ave Administration Dr Texas St 07/02/21 07/30/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave at Mckinney St 07/03/21 08/18/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. 3 Bonnie Brae IH 35E Scripture 06/15/20 07/30/21 North South Water Main Phase Streets Robin Davis 3 Bonnie Brae(SB) Oak Hickory 06/14/21 09/22/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 4 still open.Installation of electric duct banks for DME substation project and steel casing for water main project 5 Bryan Street Jagoe Ponder 07/22/21 07/22/21 Flagging traffic to offload Private Development Public equipment from the job site Works Inspections Carroll Blvd(SB) Stroud Highland 07/19/21 08/20/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 6 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 7 replacement and subgrade improvement. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 8 installing a new wastewater main line and services. Dakota Ln Airport Rd Shelby Ln 07/20/21 07/23/21 Water Distribution will be Water Tiffany Sherrane 9 installing a new water main line and services. 10 Deerwood PWY Kings Row Grant PWY 07/06/21 08/06/21 Sidewalk Repair Streets Robbin Webber 11 Eagle Locust Elm 06/28/21 07/30/21 Patching of utility trench lines. Engineering Seth Garcia 12 Elm Hickory Eagle 05/11/20 07/30/21 PEC 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 09/30/21 Atmos Energy will be closing Atmos Alice Province 13 street intermittently to replace and relocate an existing gas main and service lines Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane installing a new wastewater main line and services. Hickory St West Welch Bernard 07/15/21 07/23/21 The intersection of Welch and Engineering Streets Kyle Pedigo W.Hickory will be completely closed for pavement replacement. Hickory Street Welch Carroll 08/31/20 09/04/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 16 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo 17 replacement and subgrade improvement. Exported on July 23,2021 10:51:03 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 18 Locust Eagle Hickory 06/28/21 07/30/21 Patching of utility trench lines. Engineering Seth Garcia Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 19 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 20 replacement and subgrade improvement. Oak Street Bell Street UPRR Railroad 02/01/21 08/28/21 Adding drainage line to Oak Engineering kyle.pedigo@cityofdenton.com 21 Street as part of the Downtown Storm Sewer Project. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 22 installing a new wastewater main line and services. Riney Bonnie Brae Hardaway 07/06/20 07/30/21 Removing panel to adjust valve Private Development Public Jeremiah Tillman-David stack and center gate valve nut. Works Inspections 23 Replace panel after adjusting valve stack.Traffic control up from 8am-5pm Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 08/26/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co Bonnie Brae to approximately m 1,300 ft.to the west.This includes removal and replacement of failed sections of curb and gutter.Milling of the old asphalt pavement and the 24 stabilization of subgrade and the installation of new asphalt pavement. Phase I East Bound Outside Lane Phase II West Bound Outside Lane Phase III Middle Lane Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 25 excavating street to complete replacement/relocation of their existing gas main Western Blvd Jim Chrystal Airport Rd 06/01/21 08/02/21 PH1-Installing sewer line Private Development Public Jeremiah Tillman-David across Western from median to Works Inspections 26 private property.PH2-Median removal,future pour for Turn Lanes Windsor Dr East Hanover Dr Longfellow Ln 06/01/21 07/30/21 Complete street reconstruction Engineering Dustin Draper 27 only allowing resident only traffic. 28 Windsor Dr East Nottingham Branch Crossing 06/14/21 08/27/21 Roadway reconstruction Engineering Dustin.Draper@cityofdenton.co Woodhaven Mistywood Emerson 04/05/21 08/12/21 This project will consist of the Streets robbin.webber@cityofdenton.co removal and replacement of m failed sections of curb and 29 gutter,the milling off the old asphalt and base material,lime stabilize the subgrade and the installation of new asphalt pavement. Exported on July 23,2021 10:51:03 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From To losure Start Closure End Description Department Contact —ate Date Amherst Dr Georgetown Dr Malone St 04/15/21 06/25/21 Water Distribution will be Water Tiffany Sherrane 1 installing new water main and water services. Bell Ave McKinney Street Hickory Street 02/01/21 07/02/21 Closures starting 6/1/21. Engineering kyle.pedigo@cityofdenton.com Various traffic shifts will be required at the intersection of 2 Bell and Oak(between McKinney and Hickory)in order to cross Bell with a new drainage line on Oak Street. Boxwood at Chittamwood 3800 Boxwood 06/07/21 06/25/21 Concrete Street Panel and Streets Robbin Webber 3 Sidewalk Repair.Remove the pavement and install new concrete. 4 Bryan Street Jagoe Scripture 07/02/21 07/02/21 Flagging traffic to offload Public Works Inspections Stephany Trammell equipment from the job site Caddo Circle Champlian Cul v Sac 06/14/21 07/09/21 Concrete Sidewalk Repair. Streets Robbin Webber 5 remove failed sections of concrete Sidewalk,remove,and install new concrete Carroll Blvd(SB) Egan Panhandle 05/31/21 07/16/21 Concrete Street Panel Repair. Streets robbin.webber@cityofdenton.co The process starts with m 6 Barricading the failed sections of pavement,remove the pavement and subgrade,and install new concrete pavement. 7 Creekdale Drive Dead End Raintree Way 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber 8 Nottingham Unversity(US380) 500 feet to the south 06/02/21 07/14/21 Milling and turn lane addition Engineering Dustin Draper with a siganl upgrade. 9 Riverchase Trail Stoneway Drive Creekdale Drive 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber 10 Windor Bonnie Brae Parkside Dr 06/21/21 07/05/21 18"SS Line Private Development Public Jeremiah Tillman-David Works Inspections Windsor Dr East Hanover DR Longfellow LN O6/01/21 06/30/21 Complete street reconstruction Engineering Dustin Draper is being preformed.As shown in 11 the attached TCP the road will be closed and resident only traffic will be allowed from Longfellow to Bristol ST. Exported on July 23,2021 10:51:16 AM CDT Page 1 of 1