Loading...
2021/08/09 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Aug 9th - Aug 15th -70- Closure Start Street/Intersection From To Date Description Department Contact Bell Ave Texas St Withers St 09/30/21 11/03/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 10/13/21 11/23/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bell Ave at Mingo Rd 09/01/21 10/12/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bernard St Hickory St Chestnut St 11/24/21 01/10/22 Water Distribution will be Water Tiffany Sherrane replacing the water main line and services. F.M.428 Poinsettia Drive Loop 288 08/09/21 09/08/21 Concrete approach and turn TXDoT Robert Plato 5 lane improvements on TXDOT Roadway Exported on August 6,2021 11:07:22 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection From --l" Closure End Description Department p- Department Contact wo Date Avenue C 1-35 North Frontage Eagle Drive 0112121 Lane shift to allow for repair of Private Development Robert Plato damaged streets due to 1 contractor activity on the Carriage Square Apartment 0110121 project. Bell Hickory McKinney 07/28/21 08/25/21 Storm drain installation across Engineering Streets Kyle Pedigo 2 Bell on Oak.Bell will be closed half at a time as the storm drain is installed Bell Ave at Mckinney St 07/03/21 08/31/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bell Ave College St Texas St 08/04/21 09/20/21 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. Bonnie Brae(SB) Oak Hickory 06/14/21 09/22/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 5 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/01/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 6 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 7 replacement and subgrade improvement. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 8 installing a new wastewater main line and services. Colorado Boulevard Valley Creek Road San Jacinto Boulevard 07/26/21 08/26/21 Building a right-turn lane into Public Works Inspections Robert Plato the new Vista Verde project on 9 the west side of Colorado. The right lane will be closed while operations are being performed to add the turn lane. 10 Eagle Locust Elm 06/28/21 08/20/21 Patching of utility trench lines. Engineering Seth Garcia 11 Elm Hickory Eagle 05/11/20 08/27/21 PEG 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 09/30/21 Atmos Energy will be closing Atmos Alice Province 12 street intermittently to replace and relocate an existing gas main and service lines Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 13 installing a new wastewater main line and services. Hickory Street Welch Carroll 08/31/20 09/04/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 14 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Exported on August 6,2021 11:07:45 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo 15 replacement and subgrade improvement. 16 Locust Eagle Hickory 06/28/21 08/20/21 Patching of utility trench lines. Engineering Seth Garcia Loop 288 SB On-Ramp at FM 428 Loop 288 Mainlanes 08/06/21 09/06/21 Placing concrete approaches TXDoT Robert Plato 17 FM428 for development at corner of Loop 288 and FM428 Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 18 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 19 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 20 place as crews work to safely install new traffic signals at the intersections Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 21 replacement and subgrade improvement. Oak Street Bell Street UPRR Railroad 02/01/21 08/28/21 Adding drainage line to Oak Engineering kyle.pedigo@cityofdenton.com 22 Street as part of the Downtown Storm Sewer Project. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 23 installing a new wastewater main line and services. Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 09/06/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co Bonnie Brae to approximately m 1,300 ft.to the west.This includes removal and replacement of failed sections of curb and gutter.Milling of the old asphalt pavement and the 24 stabilization of subgrade and the installation of new asphalt pavement. Phase I East Bound Outside Lane Phase II West Bound Outside Lane Phase III Middle Lane Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 25 excavating street to complete replacement/relocation of their existing gas main Windsor Dr East Nottingham Branch Crossing 06/14/21 08/27/21 Roadway reconstruction Engineering Dustin.Draper@cityofdenton.co Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper performed on the westbound lane of E Windsor Woodhaven Mistywood Emerson 04/05/21 08/12/21 This project will consist of the Streets robbin.webber@cityofdenton.co removal and replacement of m failed sections of curb and gutter,the milling off the old asphalt and base material,lime stabilize the subgrade and the installation of new asphalt pavement. Exported on August 6,2021 11:07:45 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection Frorr To Closure End Description Department Contact Date Bell Ave Administration Dr College St 07/02/21 08/03/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. 2 Bonnie Brae IH 35E Scripture 06/15/20 07/30/21 North South Water Main Phase Streets Robin Davis 3 3 Bryan Street Jagoe Ponder 07/22/21 07/22/21 Flagging traffic to offload Private Development Public equipment from the job site Works Inspections Bryan Street Ponder Jagoe 07/29/21 07/29/21 Lane closure so contractor can Private Development Public Stephany Trammell 4 load and unload equipment Works Inspections from jobsite Bryan Street Ponder Jagoe 08/02/21 08/02/21 Lane closure so contractor can Private Development Public Stephany Trammell 5 load and unload equipment Works Inspections from jobsite Caddo Circle Champlian Cul v Sac 06/14/21 07/09/21 Concrete Sidewalk Repair. Streets Robbin Webber 6 remove failed sections of concrete Sidewalk,remove,and install new concrete Carroll Blvd(SB) Egan Panhandle 05/31/21 07/16/21 Concrete Street Panel Repair. Streets robbin.webber@cityofdenton.co The process starts with m 7 Barricading the failed sections of pavement,remove the pavement and subgrade,and install new concrete pavement. 8 Creekdale Drive Dead End Raintree Way 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber Dakota Ln Airport Rd Shelby Ln 07/20/21 07/23/21 Water Distribution will be Water Tiffany Sherrane 9 installing a new water main line and services. 10 Deerwood PWY Kings Row Grant PWY 07/06/21 07/30/21 Sidewalk Repair Streets Robbin Webber Hickory St West Welch Bernard 07/15/21 07/23/21 The intersection of Welch and Engineering Streets Kyle Pedigo 11 W.Hickory will be completely closed for pavement replacement. 12 Nottingham Unversity(US380) 500 feet to the south 06/02/21 07/14/21 Milling and turn lane addition Engineering Dustin Draper with a siganl upgrade. Riney Bonnie Brae Hardaway 07/06/20 07/30/21 Removing panel to adjust valve Private Development Public Jeremiah Tillman-David stack and center gate valve nut. Works Inspections Replace panel after adjusting valve stack.Traffic control up from 8am-5pm Riverchase Trail Stoneway Drive Creekdale Drive 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber Western Blvd Jim Chrystal Airport Rd 06/01/21 08/02/21 PH1-Installing sewer line Private Development Public Jeremiah Tillman-David across Western from median to Works Inspections 15 private property.PH2-Median removal,future pour for Turn Lanes Windsor Dr East Hanover Dr Longfellow Ln 06/01/21 07/30/21 Complete street reconstruction Engineering Dustin Draper 16 only allowing resident only I traffic. Exported on August 6,2021 11:07:56 AM CDT Page 1 of 1