2021/08/09 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Aug 9th - Aug 15th
-70- Closure Start
Street/Intersection From To Date Description Department Contact
Bell Ave Texas St Withers St 09/30/21 11/03/21 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bell Ave Withers St Mingo Rd 10/13/21 11/23/21 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bell Ave at Mingo Rd 09/01/21 10/12/21 Water Distribution will be Water Tiffany Sherrane
3 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 11/24/21 01/10/22 Water Distribution will be Water Tiffany Sherrane
replacing the water main line
and services.
F.M.428 Poinsettia Drive Loop 288 08/09/21 09/08/21 Concrete approach and turn TXDoT Robert Plato
5 lane improvements on TXDOT
Roadway
Exported on August 6,2021 11:07:22 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
Street/Intersection From --l" Closure End Description Department p- Department Contact
wo Date
Avenue C 1-35 North Frontage Eagle Drive 0112121 Lane shift to allow for repair of Private Development Robert Plato
damaged streets due to
1 contractor activity on the
Carriage Square Apartment
0110121
project.
Bell Hickory McKinney 07/28/21 08/25/21 Storm drain installation across Engineering Streets Kyle Pedigo
2 Bell on Oak.Bell will be closed
half at a time as the storm drain
is installed
Bell Ave at Mckinney St 07/03/21 08/31/21 Water Distribution will be Water Tiffany Sherrane
3 installing a new water main line
and services.
Bell Ave College St Texas St 08/04/21 09/20/21 Water Distribution will be Water Tiffany Sherrane
4 installing a new water main line
and services.
Bonnie Brae(SB) Oak Hickory 06/14/21 09/22/21 This block is closed to Other Mark Zimmerer
southbound traffic only,detours
are posted.Northbound lane
5 still open.Installation of electric
duct banks for DME substation
project and steel casing for
water main project
Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/01/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co
Sidewalk Repair.The process m
6 starts with Barricading the failed
sections of concrete pavement,
remove the pavement,and
install new concrete.
Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo
7 replacement and subgrade
improvement.
College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
8 installing a new wastewater
main line and services.
Colorado Boulevard Valley Creek Road San Jacinto Boulevard 07/26/21 08/26/21 Building a right-turn lane into Public Works Inspections Robert Plato
the new Vista Verde project on
9 the west side of Colorado. The
right lane will be closed while
operations are being performed
to add the turn lane.
10 Eagle Locust Elm 06/28/21 08/20/21 Patching of utility trench lines. Engineering Seth Garcia
11 Elm Hickory Eagle 05/11/20 08/27/21 PEG 4 Utility Project Engineering Seth Garcia
Elm Street Eagle Drive (dead end) 05/17/21 09/30/21 Atmos Energy will be closing Atmos Alice Province
12 street intermittently to replace
and relocate an existing gas
main and service lines
Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
13 installing a new wastewater
main line and services.
Hickory Street Welch Carroll 08/31/20 09/04/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
14 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
Exported on August 6,2021 11:07:45 AM CDT Page 1 of 2
Street/Intersection From To Closure Start Closure End Description Department Department Contact
Date Date
Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo
15 replacement and subgrade
improvement.
16 Locust Eagle Hickory 06/28/21 08/20/21 Patching of utility trench lines. Engineering Seth Garcia
Loop 288 SB On-Ramp at FM 428 Loop 288 Mainlanes 08/06/21 09/06/21 Placing concrete approaches TXDoT Robert Plato
17 FM428 for development at corner of
Loop 288 and FM428
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
18 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
19 place as crews work to safely
install new traffic signals at the
intersections
McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
20 place as crews work to safely
install new traffic signals at the
intersections
Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo
21 replacement and subgrade
improvement.
Oak Street Bell Street UPRR Railroad 02/01/21 08/28/21 Adding drainage line to Oak Engineering kyle.pedigo@cityofdenton.com
22 Street as part of the Downtown
Storm Sewer Project.
Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane
23 installing a new wastewater
main line and services.
Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 09/06/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co
Bonnie Brae to approximately m
1,300 ft.to the west.This
includes removal and
replacement of failed sections
of curb and gutter.Milling of the
old asphalt pavement and the
24 stabilization of subgrade and
the installation of new asphalt
pavement.
Phase I East Bound Outside
Lane
Phase II West Bound Outside
Lane
Phase III Middle Lane
Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province
25 excavating street to complete
replacement/relocation of their
existing gas main
Windsor Dr East Nottingham Branch Crossing 06/14/21 08/27/21 Roadway reconstruction Engineering Dustin.Draper@cityofdenton.co
Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper
performed on the westbound
lane of E Windsor
Woodhaven Mistywood Emerson 04/05/21 08/12/21 This project will consist of the Streets robbin.webber@cityofdenton.co
removal and replacement of m
failed sections of curb and
gutter,the milling off the old
asphalt and base material,lime
stabilize the subgrade and the
installation of new asphalt
pavement.
Exported on August 6,2021 11:07:45 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection Frorr To Closure End Description Department Contact
Date
Bell Ave Administration Dr College St 07/02/21 08/03/21 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
2 Bonnie Brae IH 35E Scripture 06/15/20 07/30/21 North South Water Main Phase Streets Robin Davis
3
3 Bryan Street Jagoe Ponder 07/22/21 07/22/21 Flagging traffic to offload Private Development Public
equipment from the job site Works Inspections
Bryan Street Ponder Jagoe 07/29/21 07/29/21 Lane closure so contractor can Private Development Public Stephany Trammell
4 load and unload equipment Works Inspections
from jobsite
Bryan Street Ponder Jagoe 08/02/21 08/02/21 Lane closure so contractor can Private Development Public Stephany Trammell
5 load and unload equipment Works Inspections
from jobsite
Caddo Circle Champlian Cul v Sac 06/14/21 07/09/21 Concrete Sidewalk Repair. Streets Robbin Webber
6 remove failed sections of
concrete Sidewalk,remove,and
install new concrete
Carroll Blvd(SB) Egan Panhandle 05/31/21 07/16/21 Concrete Street Panel Repair. Streets robbin.webber@cityofdenton.co
The process starts with m
7 Barricading the failed sections
of pavement,remove the
pavement and subgrade,and
install new concrete pavement.
8 Creekdale Drive Dead End Raintree Way 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber
Dakota Ln Airport Rd Shelby Ln 07/20/21 07/23/21 Water Distribution will be Water Tiffany Sherrane
9 installing a new water main line
and services.
10 Deerwood PWY Kings Row Grant PWY 07/06/21 07/30/21 Sidewalk Repair Streets Robbin Webber
Hickory St West Welch Bernard 07/15/21 07/23/21 The intersection of Welch and Engineering Streets Kyle Pedigo
11 W.Hickory will be completely
closed for pavement
replacement.
12 Nottingham Unversity(US380) 500 feet to the south 06/02/21 07/14/21 Milling and turn lane addition Engineering Dustin Draper
with a siganl upgrade.
Riney Bonnie Brae Hardaway 07/06/20 07/30/21 Removing panel to adjust valve Private Development Public Jeremiah Tillman-David
stack and center gate valve nut. Works Inspections
Replace panel after adjusting
valve stack.Traffic control up
from 8am-5pm
Riverchase Trail Stoneway Drive Creekdale Drive 06/28/21 07/09/21 Mill/Overlay Streets Robbin Webber
Western Blvd Jim Chrystal Airport Rd 06/01/21 08/02/21 PH1-Installing sewer line Private Development Public Jeremiah Tillman-David
across Western from median to Works Inspections
15 private property.PH2-Median
removal,future pour for Turn
Lanes
Windsor Dr East Hanover Dr Longfellow Ln 06/01/21 07/30/21 Complete street reconstruction Engineering Dustin Draper
16 only allowing resident only
I traffic.
Exported on August 6,2021 11:07:56 AM CDT Page 1 of 1