Gas Well Development Site Plan Checklist
Development Services
401 N. Elm St., Denton, TX 76201 (940) 349-8541
Updated 03/24/20 Gas Well Development Site Plan Checklist 1
Gas Well Development Site Plan Checklist
Any person proposing or amending a Drilling and Production Site on a tract of land located in the City
of Denton shall prepare and submit a Gas Well Development Site Plan in accordance with Denton
Development Code Section 6.2.4.
Items to be submitted in order for an application to be deemed complete:
☐ 1.0 Owner Authorization Form (notarized)
☐ 1.1 Gas Well Development Application;
☐ 1.2 Completed Gas Well Development Site Plan checklist;
☐ 1.3 Proof of required Insurance and Surety per DDC Section 6.3.3 and 6.3.4;
☐ 1.4 A copy of any prior approvals required, including conditions imposed, such as a
Specific Use Permit or Watershed Protection Permit;
☐ 1.5 Appropriate application fee(s); and
☐ 1.6 Exhibits A through J below:
☐ 1.6.1 Exhibit A: Cover page that includes a vicinity map of the Drilling and Production
Site; a Sheet Index that identifies the number of Exhibits with titles for each (exhibit titles
shall begin with the word ‘Exhibit’ and include the respective letter); the Drilling and
Production Site Name (aka: Project Title); the date of preparation; the preparer’s,
Operator’s, and property owner’s names; City project number; and a signature block for
both the Gas Well Administrator and the City Secretary. Add a note to the Cover Page
stating the reason for amendment, if applicable.
☐ 1.6.2 Exhibit B: A mapping exhibit with an accurate legal description of the Drilling and
Production Site that was prepared and certified by a Registered Professional Land Surveyor
of the State of Texas. Provide closure sheet of bearings and distances used in legal
description. The exhibit shall include exact location, dimension, and description of all
existing public, proposed, or private easements, and public right-of-way within the lease
area, intersecting or contiguous with its boundary, or forming such boundary. Describe and
locate all permanent survey monuments, pins, and control points and tie and reference the
survey corners to the Texas State Plane Coordinate System North Central Zone 1983-1999
datum. Provide proposed pipeline route—note that a separate application may be necessary
if the proposed route encroaches onto any public easement, right-of-way or land owned by
the City of Denton.
☐ 1.6.3 Exhibit C: A map showing the distance from the boundaries of the Drilling and
Production Site from all Protected Uses and Residential Subdivisions. If the separation
Gas Well Development Site Plan Checklist 2
distance(s) from Protected Uses and Residential Subdivisions do not meet the setback
requirements of Subsection 6.2.2, the application also must include a copy of the waivers
approved pursuant to Subsection 6.2.6A, or the approval of a setback variance approved
by the Board of Adjustment pursuant to Subsection 6.2.6B. If the Operator seeks to qualify
the proposed Drilling and Production Site for an administrative waiver pursuant to
Subsection 6.2.6C, the information therein required shall be submitted with the application
for site plan approval.
☐ 1.6.4 Exhibit D: A site plan of the Drilling and Production Site, capable of being
recorded, showing clear site boundary lines and the location of all on–site improvements
and equipment, including: tanks, pipelines, compressors, separators, and other
appurtenances in relation to the boundaries of the site.
☐ 1.6.5 Exhibit E: Erosion and Sediment Control Plan. Exhibit must include contact
information; a physical site description including: land uses, general vegetation and surface
water in near proximity; topography/contour lines both pre- and post-construction;
hydrologic analysis including: stormwater directional flow, outfalls, water well related
structures and water sources; receiving waters; soils; project narrative with general
timeline; well pad site plan including: fueling areas, waste disposal containers, hazardous
materials storage, and product and condensate storage tanks ; soil stabilization and erosion
control measures including: list of selected stormwater measures, site map of selected
stormwater measures locations and final stabilization plans; solid waste management plan,
septic/portolet location; and maintenance plan for stormwater controls including schedule
and transfer of ownership provision. See Gas Well Erosion and Sediment Control Plan
Guidance Document for details.
☐ 1.6.6 Exhibit F: An Access and Transportation Plan identifying the points of access and
routes to be followed on the road network supporting gas well development on the Drilling
and Production Site over time, and the internal circulation plan for the property containing
the proposed site, including provisions to protect vehicle access to Neighborhood Streets.
The Plan shall contain specifications for construction of the access road(s) and on-site fire
lanes that meet the standards for emergency access set forth in paragraph 6.3.2E. A map
showing transportation route and road for equipment, supplies, chemicals, or waste
products used or produced by the gas well operation shall be included. The map shall
illustrate the length of all public roads that will be used for site ingress and egress The
water source proposed for both the drilling and fracturing stages shall be identified in the
Plan, together with a designation whether the water is to be hauled or piped to the site.
☐ 1.6.7 Exhibit G: Landscape Plan. The project review planner will determine if a buffer is
required based on the adjacent land use(s). If Planner determines buffer is required, then a
landscape plan must be submitted in accordance with the City of Denton’s Landscape Plan
Checklist. Not every Drilling and Production Site requires a landscape plan.
☐ 1.6.8 Exhibit H: A Tree Inventory and Preservation and Mitigation Plan. For sites with
trees, a Tree Inventory and a Preservation Plan and Mitigation Plan pursuant to DDC,
Subsection 7.7.4: Tree Preservation will be submitted.
Gas Well Development Site Plan Checklist 3
☐ 1.6.9 Exhibit I: A Noise Management Plan, prepared in accordance with paragraph
6.3.2F.2.
☐ 1.6.10 Exhibit J: Proof of issuance of Notice of Activities pursuant to paragraph 6.3.7.