Loading...
2021/09/03 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Sep 6th - 12th Closure Start Street/Intersection From To Date Description Department Contact Bell Ave Texas St Withers St 09/30/21 11/03/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 10/26/21 12/08/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bell Ave at Mingo Rd 09/15/21 10/25/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bernard St Hickory St Chestnut St 12/09/21 01/24/22 Water Distribution will be Water Tiffany Sherrane replacing the water main line and services. Exported on September 3,2021 10:39:37 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Intersection • "07/03/21 Closure_ • fi- • fi-•. Department Contact Bell Ave at Mckinney St 09/14/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and servicesBell Ave College St Texas St 08/0 / 09/29/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bonnie Brae(SB) Oak Hickory 06/14/21 09/22/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 3 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/01/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 4 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 5 replacement and subgrade improvement. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 6 installing a new wastewater main line and services. 7 Eagle Locust Elm 06/28/21 09/10/21 Patching of utility trench lines. Engineering Seth Garcia 8 Elm Hickory Eagle 05/11/20 09/17/21 PEC 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 09/30/21 Atmos Energy will be closing Atmos Alice Province 9 street intermittently to replace and relocate an existing gas main and service lines F.M.428 Poinsettia Drive Loop 288 08/09/21 09/06/21 Concrete approach and turn TXDOT Robert Plato 10 lane improvements on TXDOT Roadway Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 11 installing a new wastewater main line and services. Hickory Street Welch Carroll 08/31/20 10/15/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 12 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Loop 288 SB On-Ramp at FM 428 Loop 288 Mainlanes 08/06/21 09/016/21 Placing concrete approaches TXDoT Robert Plato 13 FM428 for development at corner of Loop 288 and FM428 Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 14 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Exported on September 3,2021 10:39:49 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 15 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 16 place as crews work to safely install new traffic signals at the intersections Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 17 replacement and subgrade improvement. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 18 installing a new wastewater main line and services. 19 Provence Vintage Sonoma 09/03/21 09/17/21 Paving and Drainage work Drainage Engineering Seth Garcia 20 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 10/29/21 Street Reconstruction Engineering Dustin Draper Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 09/16/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co Bonnie Brae to approximately m 1,300 ft.to the west.This includes removal and replacement of failed sections of curb and gutter.Milling of the old asphalt pavement and the 21 stabilization of subgrade and the installation of new asphalt pavement. Phase I East Bound Outside Lane Phase II West Bound Outside Lane Phase III Middle Lane Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 22 excavating street to complete replacement/relocation of their existing gas main 23 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections 24 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper 25 performed on the westbound lane of E Windsor Exported on September 3,2021 10:39:49 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From --l" Closure End Description Department p- Department Contact wo Date Avenue C 1-35 North Frontage Eagle Drive 07/26/21 Lane shift to allow for repair of Private Development Robert Plato damaged streets due to 1 contractor activity on the Carriage Square Apartment 0110111 project. Bell Hickory McKinney 07/28/21 08/25/21 Storm drain installation across Engineering Streets Kyle Pedigo 2 Bell on Oak.Bell will be closed half at a time as the storm drain is installed Collier Ave. 1-35 NB Frontage Road Eagle Drive 08/23/21 08/27/21 Repairing asphalt road Private Development Robert Plato 3 damaged during construction of Carriage Square Apartments Colorado Boulevard Valley Creek Road San Jacinto Boulevard 07/26/21 08/26/21 Building a right-turn lane into Public Works Inspections Robert Plato the new Vista Verde project on 4 the west side of Colorado. The right lane will be closed while operations are being performed to add the turn lane. Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo 5 replacement and subgrade improvement. 6 Locust Eagle Hickory 06/28/21 09/03/21 Patching of utility trench lines. Engineering Seth Garcia Oak Street Bell Street UPRR Railroad 02/01/21 08/28/21 Adding drainage line to Oak Engineering kyle.pedigo@cityofdenton.com 7 Street as part of the Downtown Storm Sewer Project. 8 Windsor Dr East Nottingham Branch Crossing 06/14/21 08/27/21 Roadway reconstruction Engineering Dustin.Draper@cityofdenton.co Woodhaven Mistywood Emerson 04/05/21 08/12/21 This project will consist of the Streets robbin.webber@cityofdenton.co removal and replacement of m failed sections of curb and 9 gutter,the milling off the old asphalt and base material,lime stabilize the subgrade and the installation of new asphalt pavement. Exported on September 3,2021 10:39:59 AM CDT Page 1 of 1