2021/10/04 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 4th - 10th Street/Intersection I Description Department Contact Bell Ave Texas St Withers St 11/30/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 01/07/22 02/18/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bell Ave at Mingo Rd 10/18/21 11/29/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bernard St Hickory St Chestnut St 05/18/22 06/29/22 Water Distribution will be Water Tiffany Sherrane replacing the water main line and services. Keystone Ct West of Stuart East of 1109 Keyston�Courtl /18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller Works Inspections Exported on October 1,2021 11:50:52 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections Bell Ave College St Texas St 08/04/21 10/14/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 4 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 5 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. 6 Elm Hickory Eagle 05/11/20 10/29/21 PEC 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province 7 street intermittently to replace and relocate an existing gas main and service lines Hickory Street Welch Carroll 08/31/20 10/15/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 8 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 9 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 10 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 11 place as crews work to safely install new traffic signals at the intersections 12 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 10/29/21 Street Reconstruction Engineering Dustin Draper Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon 13 repairing a water main valve and will re-open the road at the end of the day. Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane 14 installing a new wastewater Lmain line Exported on October 1,2021 11:51:00 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 15 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo pavement replacement. Wastewater Welch Street Chestnut Street Mulberry Street 09/27/21 11/23/21 University of North Texas Private Development Public Alice Province 16 excavating street to connect Works Inspections services to Art Studio Building 17 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections 18 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on October 1,2021 11:51:00 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet • • ■Closure. Date Closure • Description Department F Chebi Lane Old North Road Freedom Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 1 replacement and subgrade improvement. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 2 installing a new wastewater main line and services. 3 Eagle Locust Elm 06/28/21 09/10/21 Patching of utility trench lines. Engineering Seth Garcia F.M.428 Poinsettia Drive Loop 288 08/09/21 09/06/21 Concrete approach and turn TXDoT Robert Plato 4 lane improvements on TXDOT Roadway Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 5 installing a new wastewater main line and services. Lido Way and Balboa Court Bell Avenue End 07/05/21 09/01/21 Full width pavement Engineering Streets Kyle Pedigo 6 replacement and subgrade improvement. 7 Locust Eagle Hickory 06/28/21 09/03/21 Patching of utility trench lines. Engineering Seth Garcia Loop 288 SB On-Ramp at FM 428 Loop 288 Mainlanes 08/06/21 09/06/21 Placing concrete approaches TXDOT Robert Plato 8 FM428 for development at corner of Loop 288 and FM428 Mistywood Lane Old North Road Craig Lane 06/21/21 09/10/21 Full width pavement Engineering Streets Kyle Pedigo 9 replacement and subgrade improvement. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 10 installing a new wastewater main line and services. 11 Provence Vintage Sonoma 09/03/21 09/21/21 Paving and Drainage work Drainage Engineering Seth Garcia Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 09/20/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co Bonnie Brae to approximately m 1,300 ft.to the west.This includes removal and replacement of failed sections of curb and gutter.Milling of the old asphalt pavement and the 12 stabilization of subgrade and the installation of new asphalt pavement. Phase I East Bound Outside Lane Phase II West Bound Outside Lane Phase III Middle Lane Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 13 excavating street to complete replacement/relocation of their existing gas main Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper 14 performed on the westbound lane of E Windsor Exported on October 1,2021 11:51:10 AM CDT Page 1 of 1