2021/10/18 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 18th - 24th Street/Intersection From To Closure Start Description Department Department Contact Date Bell Ave Texas St Withers St 12/13/21 01/20/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave Withers St Mingo Rd 01/21/22 03/03/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave at Mingo Rd 10/30/21 12/11/21 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bernard St Hickory St Chestnut St 06/01/22 07/13/22 Water Distribution will be Water Tiffany Sherrane replacing the water main line and services. 5 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller 6 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller Exported on October 15,2021 10:57:23 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 21 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 3 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.cw Sidewalk Repair.The process m 4 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. 5 Elm Hickory Eagle 05/11/20 10/29/21 PEC 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province 6 street intermittently to replace and relocate an existing gas main and service lines Hickory Street Welch Carroll 08/31/20 11/19/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 7 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller Works Inspections Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. McKinney St @ Elm St i intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 10 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 11 place as crews work to safely install new traffic signals at the intersections 12 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 10/29/21 Street Reconstruction Engineering Dustin Draper Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane 13 installing a new wastewater main line 14 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo pavement replacement. Wastewater Welch Street Chestnut Street Mulberry Street 09/27/21 11/23/21 University of North Texas Private Development Public Alice Province 15 excavating street to connect Works Inspections services to Art Studio Building 16 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Exported on October 15,2021 11:13:17 AM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 0 17 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on October 15,2021 11:13:17 AM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From 7clos Description Department Contact Date I Date Bell Ave College St Texas St 08/04/21 10/12/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 3 installing a new wastewater main line and services. Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 5 installing a new wastewater main line and services. 6 Provence Vintage Sonoma 09/03/21 09/21/21 Paving and Drainage work Drainage Engineering Seth Garcia Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon 7 repairing a water main valve and will re-open the road at the end of the day. Scripture Bonnie Brae 1,300 ft.to the West 03/22/21 09/20/21 Reconstruct;Scripture from Streets robbin.webber@cityofdenton.co Bonnie Brae to approximately m 1,300 ft.to the west.This includes removal and replacement of failed sections of curb and gutter.Milling of the old asphalt pavement and the 8 stabilization of subgrade and the installation of new asphalt pavement. Phase I East Bound Outside Lane Phase II West Bound Outside Lane Phase III Middle Lane Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 9 excavating street to complete replacement/relocation of their existing gas main Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper 10 performed on the westbound lane of E Windsor Exported on October 15,2021 11:13:27 AM CDT Page 1 of 1