2021/10/25 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Oct 25th - 31 st Street/Intersection Description Department Contact Bell Ave Texas St Withers St 12/13/21 01/20/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 01/21/22 03/03/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bernard St Hickory St Chestnut St 06/01/22 07/13/22 Water Distribution will be Water Tiffany Sherrane 3 replacing the water main line and services. Hopkins Dr Travis St Hopkins Dr 11/22/21 12/07/21 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton. 4 installing a new wastewater com main line and services. Exported on October 22,2021 12:20:14 PM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Bell Ave at Mingo Rd 10/30/21 12/11/21 Water Distribution will be Water Tiffany Sherrane 3 installing a new water main line and services. Bonnie Brae(SB) Oak Hickory 06/14/21 10/29/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 4 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 10/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 5 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. 6 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig pavement replacement. 7 Elm Hickory Eagle 05/11/20 10/29/21 PEC 4 Utility Project Engineering Seth Garcia Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province 8 street intermittently to replace and relocate an existing gas main and service lines Hickory Street Welch Carroll 08/31/20 11/19/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 9 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. 10 Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller Works Inspections 11 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 12 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 13 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 14 place as crews work to safely install new traffic signals at the intersections 15 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 10/29/21 Street Reconstruction Engineering Dustin Draper Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane 16 installing a new wastewater main line 17 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller Exported on October 22,2021 12:20:23 PM CDT Page 1 of 2 Street/Intersection From To Closure Start Closure End Description Department Department Contact Date Date 18 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo pavement replacement. Wastewater Welch Street Chestnut Street Mulberry Street 09/27/21 11/23/21 University of North Texas Private Development Public Alice Province 19 excavating street to connect Works Inspections services to Art Studio Building 20 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 11/19/21 Wastewater Collection will be Wastewater Tiffany Sherrane 21 installing a new wastewater main line and services 22 Windsor Bonnie Brae jParkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on October 22,2021 12:20:23 PM CDT Page 2 of 2 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From 7clos Description Department Contact Date I Date Bell Ave College St Texas St 08/04/21 10/12/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. College Park Dr Peach St End of College Park Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 3 installing a new wastewater main line and services. Fowler Dr College Park Dr Peach St 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Peach St N Locust Dr Fowler Dr 06/28/21 09/24/21 Wastewater collections will be Wastewater Tiffany Sherrane installing a new wastewater main line and services. Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon repairing a water main valve and will re-open the road at the end of the day. Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province 7 excavating street to complete replacement/relocation of their existing gas main Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper 8 performed on the westbound lane of E Windsor Exported on October 22,2021 12:20:34 PM CDT Page 1 of 1