2021/11/01 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Nov 1 st - 7th
Closure Start
Street/IntersecTownp-- From To Date Description Department Department Contact
Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper
1 reconstruction and during the
construction only resident traffic
will be allowed.
Bell Ave Texas St Withers St 12/21/21 01/28/22 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bell Ave Withers St Mingo Rd 01/29/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bernard St Hickory St Chestnut St 06/09/22 07/21/22 Water Distribution will be Water Tiffany Sherrane
4 replacing the water main line
and services.
Hopkins Dr Travis St Hopkins Dr 11/22/21 12/07/21 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton.
5 installing a new wastewater com
main line and services.
Locksley Lane Emerson Maid Marion 11/08/21 12/17/21 Residential Roadway Engineering Dustin Draper
6 reconstruction,and during the
construction resident traffic only
will be allowed.
7 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Feftig
pavement replacement.
Exported on October 29,2021 10:34:30 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
q I Closure Start Closure End Department I
Street/Intersection From To Date Date Description Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber
Bell Ave at Mingo Rd 10/30/21 12/11/21 Water Distribution will be Water Tiffany Sherrane
3 installing a new water main line
and services.
Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 11/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co
Sidewalk Repair.The process m
4 starts with Barricading the failed
sections of concrete pavement,
remove the pavement,and
install new concrete.
5 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig
pavement replacement.
6 Elm Hickory Eagle 05/11/20 11/19/21 PEC 4 Utility Project Engineering Seth Garcia
Hickory Street Welch Carroll 08/31/20 11/19/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
7 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
8 Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller
Works Inspections
9 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
10 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
11 place as crews work to safely
install new traffic signals at the
intersections
McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
12 place as crews work to safely
install new traffic signals at the
intersections
Orr Street Elm Street Locust Street 10/25/21 11/30/21 Roadway Reconstruction this Engineering Dustin Draper
13 project only affects one
business and notification was
direct with the business owner.
14 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper
Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane
15 installing a new wastewater
main line
16 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller
17 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo
pavement replacement. Wastewater
Welch Street Chestnut Street Mulberry Street 09/27/21 11/23/21 University of North Texas Private Development Public Alice Province
18 excavating street to connect Works Inspections
services to Art Studio Building
19 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on October 29,2021 11:47:17 AM CDT Page 1 of 2
Street/Intersection From To Closure Start Description Department Contact
Date
Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 11/19/21 Wastewater Collection will be Wastewater Tiffany Sherrane
20 installing a new wastewater
main line and services
21 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration JFPrivate Development Public Jeremiah Tillman-David
Works Inspections
Exported on October 29,2021 11:47:17 AM CDT Page 2 of 2
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From To Closure Start Closure End ion
Date Date Descript Department Contact
Bell Ave College St Texas St 08/04/21 10/12/21 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane
installing a new water main line
and services.
Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer
southbound traffic only,detours
are posted.Northbound lane
still open.Installation of electric
duct banks for DME substation
project and steel casing for
water main project
Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province
4 street intermittently to replace
and relocate an existing gas
main and service lines
Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon
5 repairing a water main valve
and will re-open the road at the
end of the day.
Walnut Street Locust Street Elm Street 05/17/21 09/30/21 Atmos Energy will be Atmos Alice Province
6 excavating street to complete
replacement/relocation of their
existing gas main
Windsor Dr East Broken Bow Armstrong 07/28/21 09/30/21 Street Reconstruction will be Engineering Dustin Draper
7 performed on the westbound
lane of E Windsor
Exported on October 29,2021 11:47:27 AM CDT Page 1 of 1