2021/11/08 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Nov 8th - 14th Street/Intersection I Description Department Contact Bell Ave Texas St Withers St 12/21/21 01/28/22 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell Ave Withers St Mingo Rd 01/29/22 03/11/22 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bernard St Hickory St Chestnut St 06/09/22 07/21/22 Water Distribution will be Water Tiffany Sherrane 3 replacing the water main line and services. Hopkins Dr Travis St Hopkins Dr 11/22/21 12/07/21 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton. 4 installing a new wastewater com main line and services. Montecito Buena Vista Palo Verde 11/29/21 12/17/21 Concrete Sidewalk Repair. Streets Robbin Webber 5 Remove failed sections and install new concrete Exported on November 5,2021 11:11:38 AM CDT Page 1 of 1 2 Street Closure Report: Current Closures smartsheet q I Closure Start Closure End Department I Street/Intersection From To Date Date Description Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. Bell Ave at Mingo Rd 10/30/21 12/11/21 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 11/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 5 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. 6 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig pavement replacement. 7 Elm Hickory Eagle 05/11/20 11/19/21 PEC 4 Utility Project Engineering Seth Garcia Hickory Street Welch Carroll 08/31/20 11/19/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 8 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Locksley Lane Emerson Maid Marion 11/08/21 12/17/21 Residential Roadway Engineering Dustin Draper 9 reconstruction,and during the construction resident traffic only will be allowed. Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 10 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Orr Street Elm Street Locust Street 10/25/21 11/30/21 Roadway Reconstruction this Engineering Dustin Draper 11 project only affects one business and notification was direct with the business owner. 12 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper 13 Stella St. North Texas Blvd Bonnie Brae 10/29/21 3/15/22 Utility installations and Engineering Scott Fettig pavement replacement. Welch Street Chestnut Street Mulberry Street 09/27/21 11/14/21 University of North Texas Private Development Public Alice Province 14 excavating street to connect Works Inspections services to Art Studio Building 15 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 11/19/21 Wastewater Collection will be Wastewater Tiffany Sherrane 16 installing a new wastewater main line and services 17 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on November 5,2021 11:11:49 AM CDT Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection From Date I Date Description Department Contact Bell Ave College St Texas St 08/04/21 10/12/21 Water Distribution will be Water Tiffany Sherrane 1 installing a new water main line and services. Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane 2 installing a new water main line and services. Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 3 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province 4 street intermittently to replace and relocate an existing gas main and service lines 5 Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller Works Inspections 6 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 7 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 8 place as crews work to safely install new traffic signals at the intersections Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon 9 repairing a water main valve and will re-open the road at the end of the day. Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane 10 installing a new wastewater main line 11 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller 12 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo pavement replacement. Wastewater Exported on November 5,2021 11:11:58 AM CDT Page 1 of 1