2021/11/08 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet
SCR Nov 8th - 14th
Street/Intersection I Description Department Contact
Bell Ave Texas St Withers St 12/21/21 01/28/22 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bell Ave Withers St Mingo Rd 01/29/22 03/11/22 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bernard St Hickory St Chestnut St 06/09/22 07/21/22 Water Distribution will be Water Tiffany Sherrane
3 replacing the water main line
and services.
Hopkins Dr Travis St Hopkins Dr 11/22/21 12/07/21 Wastewater Collections will be Wastewater Tiffany.sherrane@cityofdenton.
4 installing a new wastewater com
main line and services.
Montecito Buena Vista Palo Verde 11/29/21 12/17/21 Concrete Sidewalk Repair. Streets Robbin Webber
5 Remove failed sections and
install new concrete
Exported on November 5,2021 11:11:38 AM CDT Page 1 of 1
2 Street Closure Report: Current Closures smartsheet
q I Closure Start Closure End Department I
Street/Intersection From To Date Date Description Department Contact
1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David
Venue Grade on Allred Works Inspections
2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber
Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper
3 reconstruction and during the
construction only resident traffic
will be allowed.
Bell Ave at Mingo Rd 10/30/21 12/11/21 Water Distribution will be Water Tiffany Sherrane
4 installing a new water main line
and services.
Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 11/29/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co
Sidewalk Repair.The process m
5 starts with Barricading the failed
sections of concrete pavement,
remove the pavement,and
install new concrete.
6 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig
pavement replacement.
7 Elm Hickory Eagle 05/11/20 11/19/21 PEC 4 Utility Project Engineering Seth Garcia
Hickory Street Welch Carroll 08/31/20 11/19/21 Construction is set to begin on Engineering Kyle Pedigo
West Hickory Street between N.
Welch Street and Carroll Blvd in
October of 2020 and continue
8 through September of 2021.
Detailed lane closure
information is forthcoming
pending approval of the
contractor's phasing and traffic
control plans.
Locksley Lane Emerson Maid Marion 11/08/21 12/17/21 Residential Roadway Engineering Dustin Draper
9 reconstruction,and during the
construction resident traffic only
will be allowed.
Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain
This project is widening the
intersection and 600'each way
10 to match existing conditions
along McKinney.Also includes
water,wastewater,and
drainage improvements.
Orr Street Elm Street Locust Street 10/25/21 11/30/21 Roadway Reconstruction this Engineering Dustin Draper
11 project only affects one
business and notification was
direct with the business owner.
12 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper
13 Stella St. North Texas Blvd Bonnie Brae 10/29/21 3/15/22 Utility installations and Engineering Scott Fettig
pavement replacement.
Welch Street Chestnut Street Mulberry Street 09/27/21 11/14/21 University of North Texas Private Development Public Alice Province
14 excavating street to connect Works Inspections
services to Art Studio Building
15 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David
Works Inspections
Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 11/19/21 Wastewater Collection will be Wastewater Tiffany Sherrane
16 installing a new wastewater
main line and services
17 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David
Works Inspections
Exported on November 5,2021 11:11:49 AM CDT Page 1 of 1
3 Street Closure Report: Completed Closures smartsheet
Street/Intersection From Date I Date Description Department Contact
Bell Ave College St Texas St 08/04/21 10/12/21 Water Distribution will be Water Tiffany Sherrane
1 installing a new water main line
and services.
Bell PI at Mckinney St 07/08/21 10/08/21 Water Distribution will be Water Tiffany Sherrane
2 installing a new water main line
and services.
Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer
southbound traffic only,detours
are posted.Northbound lane
3 still open.Installation of electric
duct banks for DME substation
project and steel casing for
water main project
Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province
4 street intermittently to replace
and relocate an existing gas
main and service lines
5 Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller
Works Inspections
6 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller
McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
7 place as crews work to safely
install new traffic signals at the
intersections
McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews
8 place as crews work to safely
install new traffic signals at the
intersections
Ruddell HWY 380 Mingo Rd 10/05/21 10/08/21 Water Distribution will be Water James Gideon
9 repairing a water main valve
and will re-open the road at the
end of the day.
Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane
10 installing a new wastewater
main line
11 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller
12 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo
pavement replacement. Wastewater