Loading...
2021/11/22 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Nov 22nd - 28th -insompr-- Closure Start Street/Intersection From To Date I Description Department Department Contact Bell Ave Texas St Withers St 01/07/22 02/11/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave Withers St Mingo Rd 02/12/22 03/25/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane 3 replacing the water main line and services. Davis St Jennie St Hattie St 12/21/21 01/28/22 Wastewater Collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Hopkins Dr Travis St Hopkins Dr 12/06/21 12/18/21 Wastewater Collections will be Wastewater Tiffany.sherrane c@cityofdenton. 5 installing a new wastewater com main line and services. Montecito Buena Vista Palo Verde 11/29/21 12/17/21 Concrete Sidewalk Repair. Streets Robbin Webber 6 Remove failed sections and install new concrete 7 South Welch Street Fannin Street West Collins St. 11/29/21 12/17/21 Utility installations and Engineering Scott Fettig pavement replacement. Exported on November 19,2021 10:53:41 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End Department I Street/Intersection From To Date Date Description Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. 5 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig pavement replacement. 6 Elm Hickory Eagle 05/11/20 12/03/21 PEC 4 Utility Project Engineering Seth Garcia Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 7 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Locksley Lane Emerson Maid Marion 11/08/21 12/17/21 Residential Roadway Engineering Dustin Draper 8 reconstruction,and during the construction resident traffic only will be allowed. Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 9 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Orr Street Elm Street Locust Street 10/25/21 11/30/21 Roadway Reconstruction this Engineering Dustin Draper 10 project only affects one business and notification was direct with the business owner. 11 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper 12 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig pavement replacement. Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 12/03/21 Wastewater Collection will be Wastewater Tiffany Sherrane 13 installing a new wastewater main line and services 14 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on November 19,2021 12:52:38 PM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection r i Closure Start 7closure End Description Department Department Contact M Date -1 Date Bonnie Brae(SB) Oak Hickory 06/14/21 10/27/21 This block is closed to Other Mark Zimmerer southbound traffic only,detours are posted.Northbound lane 1 still open.Installation of electric duct banks for DME substation project and steel casing for water main project Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 11/09/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 2 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. Elm Street Eagle Drive (dead end) 05/17/21 10/29/21 Atmos Energy will be closing Atmos Alice Province 3 street intermittently to replace and relocate an existing gas main and service lines 4 Keystone Ct West of Stuart East of 1109 Keystone Court 10/18/21 10/29/21 Concrete panel repair Private Development Public Tucker Eller Works Inspections 5 Long Road W of LaGrone Academy School E of LaGrone Academy School 10/25/21 10/29/21 Replacing concrete road panels Private Development Tucker Eller McKinney St @ Elm St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 6 place as crews work to safely install new traffic signals at the intersections McKinney St @ Locust St intersection 08/02/21 10/29/21 Temporary lane closures in Traffic James Andrews 7 place as crews work to safely install new traffic signals at the intersections Ryan Rd Creekside Dr Paradise Ln 09/27/21 10/29/21 Wastewater Collections will be Wastewater Tiffany Sherrane 8 installing a new wastewater main line 9 Stuart Rd South side Keystone Court North side Keystone Court 10/25/21 10/29/21 Repairing concrete panels Private Development Tucker Eller 10 Welch Eagle Collins 08/23/21 10/30/21 Utility installations and Engineering Streets Water Kyle Pedigo pavement replacement. Wastewater Welch Street Chestnut Street Mulberry Street 09/27/21 11/14/21 University of North Texas Private Development Public Alice Province 11 excavating street to connect Works Inspections services to Art Studio Building 12 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Exported on November 19,2021 12:52:47 PM CST Page 1 of 1