Loading...
2021/12/06 - Street Closure Report 1 Street Closure Report: Upcoming Closures smartsheet SCR Dec 6th - 12th Street/Intersection From To Closure Start Description Department Department Contact Date Bell Ave Texas St Withers St 01/07/22 02/11/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bell Ave Withers St Mingo Rd 02/12/22 03/25/22 Water Distribution will be Water Tiffany Sherrane installing a new water main line and services. Bernard St Hickory St Chestnut St 06/23/22 08/04/22 Water Distribution will be Water Tiffany Sherrane 3 replacing the water main line and services. Davis St Jennie St Hattie St 12/30/21 02/04/22 Wastewater Collections will be Wastewater Tiffany Sherrane 4 installing a new wastewater main line and services. Hopkins Dr Travis St Hopkins Dr 12/13/21 12/28/21 Wastewater Collections will be Wastewater Tiffany.sherrane c@cityofdenton. 5 installing a new wastewater com main line and services. 6 Keystone Ct East of 1109 Keystone Court Stuart Road 12/13/21 12/17/21 Replacing concrete road panels Private Development Tucker Eller 7 Long Road W of LaGrone Academy School E of LaGrone Academy School 12/20/21 12/23/21 Replacing concrete road panels Private Development Tucker Eller 8 North Texas Blvd. Eagle Dr to Oak There will be multiple phases of 12/13/21 08/01/22 Utility installations and Scott Fettig closures.Will not be all at one pavement replacement. Exported on December 3,2021 10:43:32 AM CST Page 1 of 1 2 Street Closure Report: Current Closures smartsheet I Closure Start Closure End Department I Street/Intersection From To Date Date Description Department Contact 1 Allred Rd JM Prosperity Farm Rustic Barn Bonnie Brae 09/27/21 07/31/22 Storm Installation,Cutting Private Development Public Jeremiah Tillman-David Venue Grade on Allred Works Inspections 2 Amherst Georgetown Malone 10/18/21 01/21/22 Street Reconstruction Streets Robbin Webber Archer Trail Foxcroft Circle Emerson 11/08/21 12/23/21 Residential roadway Engineering Dustin Draper 3 reconstruction and during the construction only resident traffic will be allowed. Bell Ave at Mingo Rd 11/22/21 01/06/22 Water Distribution will be Water Tiffany Sherrane 4 installing a new water main line and services. 5 Chestnut Street South Welch Street Bernard Street 10/18/21 01/03/22 Utility installations and Engineering Scott Fettig pavement replacement. Country Club Rd Davis Fort Rd FM 1830 12/04/21 12/04/21 Oncor will be installing Other 6 equipment from 8am-11am on Saturday,December 4th 7 Elm Hickory Eagle 05/11/20 12/17/21 PEC 4 Utility Project Engineering Seth Garcia Hickory Street Welch Carroll 08/31/20 12/31/21 Construction is set to begin on Engineering Kyle Pedigo West Hickory Street between N. Welch Street and Carroll Blvd in October of 2020 and continue 8 through September of 2021. Detailed lane closure information is forthcoming pending approval of the contractor's phasing and traffic control plans. Locksley Lane Emerson Maid Marion 11/08/21 12/31/21 Residential Roadway Engineering Dustin Draper 9 reconstruction,and during the construction resident traffic only will be allowed. Mckinney duchess Glengarry 02/01/21 12/24/21 McKinney-Mayhill Intersection Engineering Trevor Crain This project is widening the intersection and 600'each way 10 to match existing conditions along McKinney.Also includes water,wastewater,and drainage improvements. Montecito Buena Vista Palo Verde 11/29/21 12/17/21 Concrete Sidewalk Repair. Streets Robbin Webber 11 Remove failed sections and install new concrete Orr Street Elm Street Locust Street 10/25/21 12/30/21 Roadway Reconstruction this Engineering Dustin Draper 12 project only affects one business and notification was direct with the business owner. 13 Quail Ridge Cooper Branch E La Paloma Dr 09/07/21 12/10/21 Street Reconstruction Engineering Dustin Draper 14 South Welch Street Fannin Street West Collins St. 11/29/21 12/17/21 Utility installations and Engineering Scott Fettig pavement replacement. 15 Stella St. North Texas Blvd Bonnie Brae 10/29/21 03/15/22 Utility installations and Engineering Scott Fettig pavement replacement. Williamsburg Row Jamestown Ln Nottingham Dr 10/26/21 12/10/21 Wastewater Collection will be Wastewater Tiffany Sherrane 16 installing a new wastewater main line and services 17 Windsor Bonnie Brae Parkside 08/09/21 12/31/21 Pavement Restoration Private Development Public Jeremiah Tillman-David Works Inspections Exported on December 3,2021 10:44:05 AM CST Page 1 of 1 3 Street Closure Report: Completed Closures smartsheet Street/Intersection Closure Start Closure End Description Department Department Contact Date Date dm Carroll Blvd(SB)&(NB) Mulberry Eagle 07/12/21 11/09/21 Concrete Street Panel and Streets robbin.webber@cityofdenton.co Sidewalk Repair.The process m 1 starts with Barricading the failed sections of concrete pavement, remove the pavement,and install new concrete. Welch Street Chestnut Street Mulberry Street 09/27/21 11/14/21 University of North Texas Private Development Public Alice Province 2 excavating street to connect Works Inspections services to Art Studio Building 3 Western Blvd Jim Chrystal Airport Rd 08/16/21 12/31/21 Paving:Decal Lanes Private Development Public Jeremiah Tillman-David Works Inspections Exported on December 3,2021 10:44:14 AM CST Page 1 of 1